Council Planning Negotiated Report MCU22 0051 · MCU22/0051

of 14

Text shows just the words. Original shows the document exactly as it was published.

                      c.      not permanently or temporarily extracting groundwater that results in the aeration of
                              previously saturated ASS; and
                      d.      not undertaking filling on land at or below 5 metres AHD that results in:-
                              ii.       actual ASS being moved below the water table; or previously saturated ASS
                                        being aerated.
                      Where potential or actual Acid Sulfate Soil is identified, all works must be caried out in
                      accordance with an Acid Sulfate Soils Management Plan prepared by a qualified person*.
                      *(Refer to Advisory Note)
               39.    If earthworks trigger assessment, prepare an Acid Sulfate Soil Investigation Report and if
                      required an Acid Sulfate Soils Management Plan prior to the commencement of works. The
                      reports and analysis are to be undertaken in accordance with the Noosa Plan 2020 and
                      prepared by a suitably qualified person.
               40.    Prior to the commencement of use, provide certification from a suitably qualified person that
                      all works have been undertaken in accordance with the Acid Sulfate Soil Management Plan.
               Applicant’s Representation
               Conditions 21, 39 and 40 relate to carrying out an acid sulfate soils investigation and potential
               preparation of an Acid Sulfate Soils Management Plan if required. There is some overlap in the
               requirements of condition 21 as compared with conditions 39 and 40.
               All requirements with respect to acid sulfate soils should be consolidated into one or two conditions
               contained in one section of the approval. Having requirements with respect to acid sulfate soils
               split across separate sections in the approval, as is currently the case, may lead to confusion.
               Assessment of Representation
               It is agreed that there is repetitiveness in the 3 conditions and therefore it is recommended that
               conditions 39 & 40 be deleted and Condition 21 incorporate the requirement for certification.


               3.     CONCLUSION & REASONS FOR DECISION
               It is concluded that the amended plans satisfactorily address Council’s required amendments to
               the plans of development regarding the northern driveway design, building height, and provision of
               an awning. Amendments are also warranted to provide greater clarity in the wording of conditions
               regarding the required colour scheme, performance bond and acid sulfate soils. However, the
               condition requiring the Bunnings Warehouse to comply with the development approval is
               reasonable and relevant and should be maintained.




Document Set ID: 22759818
Version: 17, Version Date: 23/04/2024

Used in these records

About this file

File size
1.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Council Planning Negotiated Report MCU22 0051.pdf · 1.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.