Skip to the record
Every meeting, every word.

Council archive · source document

Council Planning Negotiated Report MCU22 0051 · MCU22/0051

of 14

Text shows just the words. Original shows the document exactly as it was published.

                      c.      Vegetative screening of any electrical transformers, bin storage areas and the like
                              from the road frontage;
                      d.      Provision of 1 street tree within the road reserve for every 8 metres of road frontage
                              (excluding driveways).
                      e.      Landscape or architectural treatments that soften the appearance of the retaining
                              walls and industrial building along the northern boundary.


               20.    Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must
                      be submitted to Council, to secure performance of all conditions of this approval, prior to the
                      issue of a Development Permit for Operational Works. The cash bond or trading bank
                      guarantee will be returned on completion of the development subject to satisfactory
                      performance of the conditions of approval at that time less any costs incurred by Council in
                      respect of enforcing performance of this permit. Council reserves the right to call upon the
                      bond or guaranteed sum to effect compliance with conditions.
               21     The disturbance and release of Acid Sulphate Soils must be avoided by:
                             a. Undertaking an Acid Sulfate Soils investigation and soil analysis pursuant to the
                                National Acid Sulfate Soils Guidance.
                             b. not excavating or otherwise removing soil or sediment containing ASS;
                             c. not permanently or temporarily extracting groundwater that results in the aeration
                                of previously saturated ASS; and
                             d. not undertaking filling on land at or below 5 metres AHD that results in:-
                              i.        actual ASS being moved below the water table; or previously saturated ASS
                                        being aerated.
                      Where potential or actual Acid Sulfate Soil is identified, all works must be caried out in
                      accordance with an Acid Sulfate Soils Management Plan prepared by a qualified person*.
                      Certification from a suitably qualified person that all works have been undertaken in
                      accordance with the Acid Sulfate Soil Management Plan must be provided to Council.
                      *(Refer to Advisory Note)




Document Set ID: 22759818
Version: 17, Version Date: 23/04/2024

Used in these records

About this file

File size
1.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Council Planning Negotiated Report MCU22 0051.pdf · 1.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.