NOOSA COUNCIL IDAS Development Appication Decision Notice 4

91 Payment to be made prior to the issue of a Development Permit for building works in the
amount calculated under the Policy at that date; or

92 Payment may be deferred to a date:-

9.2.1 prior to Council sealing plans of the development for titling purposes;

922 prior to the issue of a Certificate of Classification for any building works; or

92.3 prior to commencement of the approved use at the relevant premises;
whichever is the sooner, Payment of deferred headworks contributions shall also be subject to the
following requirements:-

924 Payment of a bonding fee in the amount of $150 and submission of a trading bank
guarantee to the value of headworks assessed at the time of submission, plus 20%,
prior to the issue of a Development Permit for building works;

9.2.5 Headworks shall be calculated as the value of headworks assessed at the ordinarily
due time of payment, plus interest charged at the rate set by the Queensiand
Treasury Corporation for Local Government borrowings as they apply to Noosa Shire.
The interest rate used shall be the rate current at the “time prescribed" above;

9.2.6 Should the contributions not be paid at the due time, Council shall call upon the
security lodged; and

9.2.7 in the case of a Development Permit for building works, if a permit expires the
securities will be retumed.

The footpath across the Mitti Street frontage is to be maintained in its current condition. Any damage
caused during construction is to be rectified at no cost to Council,

Existing palms in the footpath shail be retained and any undesirable plant species shall be removed.
Any kerb and gutter, or pavement damaged by construction traffic or works, or by the installation of a

new access crossing shall be repaired to the same profiles that existed prior to work commencing, all at
no cost to Council.

Any alteration of any public utility or other facilities necessitated by the development of the land or
associated construction works external to the site shall be at no cost to Council.

The development site shall be connected to Council's existing water supply and sewerage reticulation
systems at no cost to Council and to the standards and requirements of Noosa Council.

Roof and surface water is to be collected on site and discharged through a single underground drain line
into existing drainage in Mitti Street to the reasonable satisfaction of the Shire Engineer.

Alternatively, roof water may be disposed of on site into approved infiltration pits.
Details of the drainage scheme shall be submitted with an application for a Development Permit for
Operational Works.

Rainwater and washdown water in the underground car park is to be collected in grated pits and
directed via a grease and oil trap to a pumpwell.

The pumpwell shall be fitted with a appropriate pump, and high level alarm system, and discharge to a
kerb outlet in Mitti Street;

or,

rainwater and washdown water in the underground car park is to be collected in grated pits and directed
via a grease and oil trap to an on site detention tank. This detention tank is to be drained under gravity
via a throttled outlet to an on site infiltration pit.

Plans for the proposed system shall be prepared by a registered Consulting Engineer to manage a
1:100 year event. The plans and calculations shall be submitted with an application for a Development
Permit for Operational Works for approval by Council's Development Engineer.

The underground car park shall be ventilated in accordance with the Building Code of Australia and any
relevant Australian Standard.
Any person acting on this permit shall prevent erosion and sediment export from the site.

Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of
waste, may be necessary. An erosion and sediment contro! plan. shall be submitted for approval by the
Development Engineer, prior to the issue of a Development Permit for Building Works.

‘SMP oc kiutadeaw koutou planningicecrsine doe
Document Set ID: 21478971
Version: 1, Version Date: 25/06/2021

 

 

Document Set ID: 23117161
Version: 3, Version Date: 19/07/2024

Page 7 of 9

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval 131999 982632 1.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.