Reference Document - Stormwater Management Plan - RAL26/0001 (As Published)

of 15

Page text read automatically using OCR, there may be inaccuracies

STORMWATER
MANAGEMENT REPORT
58 on RP32777
25 Tulip Street, Cooroy
July 2026

          NOOSA COUNCIL
       REFERENCE DOCUMENT
            RAL26/0001

Log in to download the original (Reference Document - Stormwater Management Plan - RAL26_0001 (As Published).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 14 pages

Page 2

Contents
1.     INTRODUCTION .............................................................................................................. 4
2.     SITE DETAILS ................................................................................................................... 4
2.1.      Existing Site Description and Drainage Regime ................................................................. 4
2.2.      Proposed Development Drainage Regime .......................................................................... 6
2.3.      LPOD Assessment ........................................................................................................... 6
3.     STORMWATER CHARACTERISTCS ............................................................................... 7
3.1.      Comparison of Pre/Post Development and Quantity.......................................................... 7
3.2.      Quality ............................................................................................................................ 9
3.2.1.        Construction Phase....................................................................................................... 9
3.2.2.        Operational Phase ........................................................................................................ 9
4.     Conclusion and Recommendations ..................................................................................... 10
Appendix A –Proposed Development Concept Plans ................................................................... 11

Page 3

Document Control

Report Title             Stormwater Management Report

Client                   Ashley Trompf

Client Contact           Ashley Trompf                  Client Reference             25 Tulip St, Cooroy

                                                                                         Verifier
    Rev          Date        Revision details/status      Author         Reviewer                     Approver
                                                                                      (if required)
0         5 Nov 2025     Initial Version                J.Bauleka       J.Bauleka                     J.Bauleka

1         10 Nov 2025    Issued for Use                 J.Bauleka                                     J.Bauleka

2         29 May 2026    Information Request response   J.Bauleka                                     J.Bauleka

3         21 July 2026   Further information response   J.Bauleka                                     J.Bauleka

Current revision         3




Approval

Author signature                                        Approver signature




Name                     J.Bauleka                      Name                         J.Bauleka
                                                                                     RPEQ: 20693

Title                    Civil Engineer                 Title                        Civil Engineer




                                                                              Auxilium Consulting Pty Ltd
                                                                                       ABN 84 639 195 092
                                                                                          9 Ginger Bell Ave
                                                                                           Bli Bli, Qld 4560
                                                                                                    Australia



                                                                    M                     +61 423 415 419
                                                                    E      [email protected]

Page 4

1. INTRODUCTION
Auxilium Consulting Pty Ltd (Auxilium) has been engaged to prepare a Stormwater Management
Report to accompany a development application for a residential subdivision located at 25 Tulip
Street, Cooroy. This report investigates the stormwater management considerations for the existing
and proposed development site and assesses how the run-off from the site is to be managed in
accordance with Noosa Council (Council) requirements for stormwater drainage.

Council issued an Information Request (IR) on 7 April 2026 focussing on clarification of stormwater
aspects. A further information request and clarification about the stormwater management was issued
on the 7 July 2026, which this report has been updated to address.


2. SITE DETAILS
2.1. Existing Site Description and Drainage Regime
The existing Site is located at 25 Tulip Street, described as Lot 58 on Plan RP32777, and contains an
existing dwelling and shed with an area of 1,529 m2. The Site is a residential setting with a large
proportion of permeable areas.




FIGURE 1 SITE LOCALITY PLAN (NOOSA COUNCIL INTRAMAPS, 2025)

The Site slopes away from the road frontage towards the rear of the property. An unmapped channel
conveys flows to the east and eventually into the Lake Macdonald catchment system. This existing,
open channel discharges in a concentrated state from the Site.

Page 5

Roof run-off from the existing dwelling is discharged to the rear of the Site as overland flows to the
existing channel. Road surface flows are excluded from the Site’s catchment with the kerb and
channel and crossover.




FIGURE 2 SITE FRONTAGE (GOOGLE STREETVIEW, AUG 2023)




FIGURE 3 EXISTING ROOF DRAINAGE TO OVERLAND FLOWS TO REAR OF THE SITE (NOV 2025)

Page 6

   2.2. Proposed Development Drainage Regime
   The proposed subdivision results in the creation of one additional rear lot with an increase of
   impermeable surfaces through roof areas and driveway. It is expected that stormwater quantities will
   increase because of these impermeable areas with attenuation via above ground tanks proposed.

   To address Council’s further information request, the stormwater attenuation was amended to
   incorporate a single underground detention tank to attenuate flows from the access easement and
   future lot.

   Existing surface flows from upstream adjacent properties will remain unchanged. The existing
   drainage regime of discharging to the Lawful Point of Discharge (LPOD) at the northeastern
   boundary (unmapped channel) is maintained in the developed state. Further discussion about the
   LPOD is detailed in 2.3.

   The roof and allotment drainage system for the proposed site shall be designed to comply with:

        1. Noosa Council Planning Scheme SC6.7.6 Stormwater Management and 9.4.8 Water Quality
           and Drainage Code
        2. The Queensland Urban Drainage Manual (QUDM); and
        3. AS/NZS 3500.3:2015 - Plumbing and Drainage Part 3: Stormwater Drainage.


   2.3. LPOD Assessment
   As per QUDM’s criteria for determining the LPOD test, an assessment of the proposed drainage has
   been detailed below:

                      Criteria                                         Development Outcome
Will the proposed development alter the site’s          The proposed development must ensure that
stormwater discharge characteristics in a manner that   stormwater discharge is maintained as sheet flow to
may substantially damage a third-party property?        the discharge point and avoid concentrating flows,
                                                        increasing quantities and/or velocities.

                                                        Therefore, utilise stormwater attenuation systems
                                                        and level spreader devices to ensure the
                                                        characteristics do not damage a third-party’s
                                                        property.

Is the location of the discharge from the development   The location of the discharge is its existing location
site under the lawful control of the local government   because of the natural, steep terrain. It is part of the
or other statutory authority from whom permission       surrounding terrain and natural flow of the land and
to discharge has been received?                         eventually flows into a natural watercourse feeding
                                                        into the Lake Macdonald system.
This will include a park, watercourse, drainage or
road reserve, stormwater registered drainage            Therefore, as the immediate downstream discharge
easement, or land held by local government              point from the Site is not under the lawful control of
(including freehold land).                              the local statutory authority, further consideration of
                                                        the next criteria is required.

An authority to discharge over affected properties      In the context of obtaining authority to discharge
will be necessary. In descending order of certainty,    over the affected property, this would be a matter if
an authority may be in the form of:                     there was a material change that resulted in damage
                                                        to a third-party’s property and/or actionable
       Dedication of a drainage reserve or park        nuisance occurring.

Page 7

       A registered easement for stormwater              As this is the existing point of discharge and
        discharge/works                                   conveyance of flows through the Site, maintaining
       Written discharge approval                        quantities and velocities to a pre-development state
                                                          would result in no actionable nuisance occurring.

                                                          Therefore, a further assessment is undertaken below.

Common Law: Principles of nuisance                        If the existing discharge point is maintained, and
                                                          discharge quantities and velocities are maintained as
Alterations to the natural flow regime will be lawful     per the pre-developed state, then no third-party
if all necessary statutory approvals have been            damage is occurring, and this gives no rise to
obtained and complied with, and:                          actionable nuisance claims.

       There is no nuisance or interference to the       Therefore, if the development can maintain these
        use or enjoyment of affected land; or             pre-development attributes when discharging from
       The affected land owner has consented to the      the Site in the post-developed state, the alterations
        change in drainage                                will be lawful.

   TABLE 1 LPOD ASSESSMENT AGAINST PROPOSED DEVELOPMENT




   3. STORMWATER CHARACTERISTCS

   3.1. Comparison of Pre/Post Development and Quantity
   The development proposes to increase the impervious area of the site by using the following
   parameters:

           Increased impervious area of the access easement to Lot 2
           100% impervious area of Lot 2’s building envelope area
           50% impervious area of Lot 1’s area in accordance with Table 4.5.1 of QUDM (for Urban
            residential – low density).

   To summarise the development characteristics throughout the modelling and Council’s IR process, a
   table has presented the various changes below.

            Report revision                     Post-Development impervious catchment (%)
                           1                                         31
                           2                                         45
                           3                                         57
   TABLE 2 DEVELOPMENT CHARACTERISTICS WITH REPORT REVISION




   The developed catchment increases from the 31% to 57% and the modelling has been updated to
   account for this change in Table 3.

Page 8

                                                Pre-Development       Post-Development

                       Catchment                    Pre-01                Post-01

                        Area (Ha)                    0.153                 0.153

                    Fraction Imp (%)                  20                     57


              Time of Concentration (mins)           10.13                 10.13




TABLE 3 MODELLING PARAMETERS

Pre and post discharge rates have been calculated using DRAINS software to evaluate the effect of
the development. Attenuation of post-development flows have achieved by modelling a single 9kL
underground detention tank servicing all catchments.

                     Underground tank 9kL
                     Orifice (@0mm of Storage Depth)         Or_100 mm
                     Orifice overflow (@0.75 of Storage      Or_225 mm
                     Depth)
                     Max depth                               0.84 m
TABLE 4 DETENTION TANK CONFIGURATION




FIGURE 4 POST-DEVELOPMENT DRAINS MODEL LAYOUT

Page 9

Utilising the modelling methods of ARR2019, parameters from the ARR Data Hub for the site
location, and rainfall Intensity Frequency Distribution data from the Australian Bureau of
Meteorology have been implemented into the DRAINS model to determine the mean peak discharge
rates from the storm events. This is presented in Table 5 below.

                                                                      QPROPOSED M³/S (WITH
% AEP EVENT Q EXISTING M³/S QPROPOSED M³/S (NO ATTENUATION)                                QCHANGE M³/S
                                                                        ATTENUATION)

      63.2           0.020                      0.023                         0.018              -0.002

      39.3           0.030                      0.032                         0.023              -0.007

      18.1           0.043                      0.046                         0.042              -0.001

       10            0.051                      0.056                         0.047              -0.004

       5             0.063                      0.066                         0.060              -0.003

       2             0.072                      0.074                         0.071              -0.001

       1             0.082                      0.085                         0.082              0.000
TABLE 5 PRE AND POST COMPARISON OF PEAK DISCHARGE RATES

The effect of the underground tank is effective attenuation of discharge rates to maintain existing rates
or even a reduction of the pre-development rates. Controlled flows from the outlet of this tank will be
discharged to the LPOD via a level spreader device to maintain the pre-development drainage
regime.

Refer to Appendix A Proposed Development Concept Plan for the proposed stormwater drainage layout
plan illustrating the concept described above. Note the specific details of the level spreader pipe inlet
will be determined during the Operational Works phase and this demonstrates the drainage concept.


3.2. Quality

        3.2.1.Construction Phase
To fulfill the General Environmental Duty, a person “…must not carry out any activity that causes or is
likely to cause environmental harm, unless measures to prevent or minimise the harm have been taken…”. It is
necessary to manage and mitigate these impacts through best practise erosion and sediment controls.
Due to the development area being less than 2,500 m2 the construction impacts will be managed
using the principles aligned with the desired outcomes of Appendix 2 of State Planning Policy (SPP).

A site-specific erosion and sediment control plan must be prepared and submitted as part of the
Operational Works approval.


        3.2.2.Operational Phase
This development consists of an additional dwelling as part of the subdivision and is consistent in
character with the existing residential dwelling and environment. As the development proposal is not

Page 10

considered to significantly alter the potential for pollutant generation, stormwater quality treatment
processes are not proposed for the development.


4. Conclusion and Recommendations
This Stormwater Management Report demonstrates how the stormwater run-off from the site is to be
managed to comply with the relevant requirements and mitigate adverse impacts to the downstream
catchment. Of note, QUDM assessment has been undertaken against the LPOD criteria demonstrating
no actionable nuisance arising from the proposed development.

       The proposed site stormwater run-off maintains the existing drainage regime. The existing
        surface runoff from the upstream properties remains unchanged compared to the existing state.

       An assessment against the LPOD criteria of QUDM has been detailed in this revised report
        with the outcomes incorporated into the concept stormwater layout, demonstrating no
        actionable nuisance outcomes because of the development.

       Pre and post development modelling of the resultant peak flows has been carried out, with
        attenuation using a single 9kL underground tank to mitigate peak flows. Outlet from the tank
        discharge via a level spreader device to the LPOD, to maintain the pre-development drainage
        regime.

       A site-specific erosion and sediment control plan is to be prepared and submitted with the
        Operational Works approval to mitigate impacts to the receiving catchments and fulfil the
        general environmental duty of care and Appendix 2 of the SPP.

       The proposed development is not considered to significantly alter the pollutant generating
        potential of the site; therefore, stormwater quality treatment processes are not proposed for the
        development.

Page 11

Appendix A –Proposed Development Concept Plans


[OCR of page images]
Appendix A —Proposed Development Concept Plans

Page 12

                                                   Concrete




                                                              STREET
                                         Deck
Shed




                                            Step
                     EXISTING BUILDING




                                                                TULIP
              DECK
       Slab


[OCR of page images]
NORTH

 

 

57
RP32777

 

LPOD 01

   

   

\ y

Pee eS SSeS

\

( \
A ( \
a

59
RP32777

 

 

 

 

 

 

 

\ y f 1

i
i
i
i
i
i
1
=

TULIP STREET

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LEGEND
ADJACENT BOUNDARY CATCHMENT TABLE
EXISTING ELECTRICAL
EXISTING DRAINAGE CATCHMENT | AREA (ha) | IMPERVIOUS ( % )
EXISTING KERB PRE 01 0.153 20.00
EXISTING MINOR CONTOUR
_ EXISTING MAJOR CONTOUR
=a =o CATCHMENT BOUNDARY
trop C) LEGAL POINT OF DISCHARGE
F [Associated Job Nos] Survey Data Scales CLIENT 25 TULIP STREET, COOROY QLD 4563 COUNCIL
E Horiz. .
0 i mee YJ. & C. TROMPF PRE CATCHMENT NOOSA SHIRE COUNCIL
2 rey Oa Worftos. [WOOD | 9 sgn SEE TANNING DEVELOPMENT LAYOUT PLAN
8 Height T py 66,329 Scale 1150 @Al © ABN 84 639 195 092 NAN PLAN STATUS Job No] =
A [ISSUE FOR REVEW 23.10.25 Datum . PIKKI ST JARO BALLEKA SIGNATURE ISSUE FOR USE Contract_No. -
- Signatory: - RPEQ Full Name, Eng. Area and RPEQ No. or Survey | SURVEYPLAN ] Dimensions shown in metres MAROOCHYDORE BC, QLD 4558 RPEQ #20695 DRAWN DESIGNED DATE i
Revisions/Descriptions = Full Name and Position Title Date Books | __%% __| except where shown otherwise +61 423 415 419 cPEng TN MN 23.10.25 Drawing No.| C900 [A
WHS IT] { [email protected].AU__} DATE:23.10.25 WU. Series Number 1 of 4

 

 

Page 13

                      Emt for Access & Services                                   Concrete




                                                                                             STREET
                                                                        Deck




       806m²




                                                              725m²
Shed




       2




                                                                           Step
                                                      1
                                                    EXISTING BUILDING




                                                                                               TULIP
                                             DECK
               Slab

Page 14

                                  Emt for Access & Services                                       Concrete




                                                                                                             STREET
                                                                                     Deck




                   806m²




                                                                          725m²
       Shed




              2




                                                                                        Step
                                                                  1
                                                                EXISTING BUILDING




                                                                                                               TULIP
                                                         DECK
                           Slab




LEVEL SPREADER SECTION                                                              LEVEL SPREADER PLAN

Page 15

 

WEIR: 1.0m LENGTH AT
0.75m TAMK DEPTH

PROPOSED ATLAN VAULT TANK
5.03m x 236m x 0.90m

 

 

 

 

f

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

E€
&
g
a
_
(
?\ -
()
:
k \ 5.03m
9225 PIPE OUTLET |e 9100 AT
0.0m TANK DEPTH
DETENTION TANK DETAIL-9kL
F [Associated Job N Survey Dat CLIENT COUNCIL
. seeing se To “oe Seales J. & C. TROMPF 25 TULIP STREET, COOROY QLD 4563
_ AHD AUXILIUM . a
D Datum cONSUETING TANK DETAIL NOOSA SHIRE COUNCIL
C ‘Auxiliary Drg Nos|Horiz. | MGA2020 | 9 02 04 08m ASSOCIATED CONSULTANTS
Grid ZONE96 | ju ; ; NAN
B | STORMWATER UPDATE 20.07.26 Height Tp 66,329 Scale 10 @A1 © ABN 84 639 195 092 BREN PLANNING STATUS Job No] PO-035
A | ISSUE FOR REVIEW 28.05.26 Datum . PIKKI ST JARO BAULEKA SIGNATURE ISSUE FOR USE Contract_No, -
- a Signatory: - RPEQ Full Name, Eng. Area and RPEQ No. or Survey | SURVEYPLAN ] Dimensions shown in metres MAROOCHYDORE BC, QLD 4558 RPEQ #20693 DRAWN DESIGNED DATE ‘
Revisions/Descriptions = Full Name and Poston Tile Date Books | 7% | except where shown otherwise +61 423 415 419 cPEng HN MN 20.07.26 drawing No.| C905 |B
ALES TI I [email protected] | DATE:20.07.26 U7. Series Number 4 of 4

 

 

 

 

 

 

 

 

 

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.