Reference Document - Stormwater Management Plan - RAL26/0001 (As Published)
Pre-Development Post-Development
Catchment Pre-01 Post-01
Area (Ha) 0.153 0.153
Fraction Imp (%) 20 57
Time of Concentration (mins) 10.13 10.13
TABLE 3 MODELLING PARAMETERS
Pre and post discharge rates have been calculated using DRAINS software to evaluate the effect of
the development. Attenuation of post-development flows have achieved by modelling a single 9kL
underground detention tank servicing all catchments.
Underground tank 9kL
Orifice (@0mm of Storage Depth) Or_100 mm
Orifice overflow (@0.75 of Storage Or_225 mm
Depth)
Max depth 0.84 m
TABLE 4 DETENTION TANK CONFIGURATION
FIGURE 4 POST-DEVELOPMENT DRAINS MODEL LAYOUT