Original source · versioned page text
Soil Report - S
The soil samples hand collected and classified from the proposed house site were assessed as having low to negligible plasticity, therefore laboratory testing was considered unnecessary. The expected surface movement (Ys), due to seasonal moisture changes in the soil encountered, is as follows Ys Value = 0-20mm Predicted Surface Movement Class Ys=>20-—< 40mm M Ys=>40-< 60 mm Hl Ys=>60—-< 75 mm H2 Ys=>75 mm E Problem sites P Note: Our assessment does not consider the effect of the presence of trees within or adjacent to the building site, nor the removal of trees prior to or after construction, nor the growth of trees too close to the footings. The proximity of trees and their effect on joundations should be considered when determining specific engineering assessments, and for foundation/footing design. Appendix B of AS 2870-2011 indicates that to reduce, but not eliminate, the possibility of damage to the footings, trees should be restricted to the following distance from the building (where rows or groups of trees are present the distance nominated below must be increased, and similarly the Ys Value listed above may need to be increased) : 75% of the mature tree height, for class “M” sites, 100% of the mature tree height, for class “H 1” sites, and 150% of the mature tree height, for class “E” sites. Note: This classification above has been derived from test work performed on the soil profile encountered on the day of our fieldwork. Any further filling of the site or excavation into the soil profile, may result in a different classification. Temporary Excavations. Where temporary excavations are performed for footing or services up to 600mm deep, natural soils may have minor or no stability problems, however deeper excavations have a possibility of collapse more readily and shoring of vertical excavation may be required. Where an existing excavation has been filled with uncontrolled fill, all locations above a line 30 degrees for sands and 45 degrees for clays above the horizontal may be unstable and may not support any structure — see attached critical depth line diagram. Unearthed Geotechnical P/L. 4 Site Investigation Report 020-212
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.