Original source · versioned page text
2016-04-26 General Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 26 APRIL 2016
a. 2.0m x 2.0m truncation for the proposed dividing boundaries near the southeast
corner of the proposed access handle.
3. All lot numbering on the subdivision plan to be submitted to Council for compliance
assessment must remain as shown on the Approved Plans.
4. The development must be undertaken and operated in a manner that causes no
detrimental effect upon the amenity of the neighbourhood by reason of the creation of
excessive noise, lighting nuisance or other emissions.
Easements
5. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
6. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
7. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Vehicle Access
8. All vehicle access to proposed Lots 1 and 2 must be via the proposed access
easement and a single shared access driveway in Eumundi Noosa Road. The
driveway must be located generally in the same location as the existing driveway.
Stormwater
9. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval, and must include:
9.1. Stormwater system designed and constructed in accordance with Council’s
Planning Scheme Policy 5 – Engineering Design Standards – Roads, Drainage
and Earthworks
9.2. No adverse impact on other properties and the road’s footpath and grassed
verge (eg by diverting flows and/or blocking flows and causing additional
ponding)
9.3. Where applicable, extension of the site stormwater system to accommodate
stormwater from external site, including registration of drainage easements
9.4. The use of gravity stormwater drainage only and not surcharge pits or pumps.
10. Stormwater runoff from the development must be disposed of without causing scour
or damage to the subject site or any adjoining property.
Water & Sewer Connections
11. An underground connection to reticulated water and sewerage must be provided to
each lot in accordance with the standards and requirements of Northern SEQ
Distributor–Retailer Authority (Unitywater).
12. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection to
reticulated water and sewerage has been provided to each lot.
Page 4 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.