Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Info Request Response Traffic Management Plan 25-9-25 - JN1006_2-Bennett-3FergusonSt-AIA092025

of 33

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                         [email protected]



3.     PROPOSED DEVELOPMENT

The development relates to construction of a Vehicle Crossover (VXO)
Steps to build the VXO that were considered as part of this VMP:
▪    necessary vegetation removal including any stump grinding
▪    preparation of ground area – minor (<100mm) site scraping (excavation)
▪    import gravel or sand bed for the base
▪    box out area and install reinforcing materials (e.g., steel mesh or rebar)
▪    pour and level concrete into the prepared formwork.




Tree Management Plan (TMP)                  Ref: JN0823                             Page 6 of 33
Log in to download the original file

Info Request Response Traffic Management Plan 25-9-25 - JN1006_2-Bennett-3FergusonSt-AIA092025.pdf · 4.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.