Council archive · source document
06-09-22 Civil Engineering Report_Issue F · MCU21/0175
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
6 September 2022
Table of Contents
EXECUTIVE SUMMARY 2
1 PURPOSE 5
2 INTRODUCTION 5
2.1 Project Description 5
3 SITE CHARACTERISTICS 6
3.1 Site location 6
3.2 Topography and Existing Site Drainage 6
4 SITE DATA 7
5 STORMWATER 7
6 EROSION AND SEDIMENT CONTROL 7
7 WATER SUPPLY 7
8 SEWER 8
9 ROADWORKS 8
10 EARTHWORKS 8
11 ELECTRICITY AND TELECOMMUNICATIONS 9
12 GAS 9
13 CODES 9
14 CONCLUSION 10
15 LIMITATONS OF REPORT 10
Excellence with Economy in Engineering 3
https://mpncnetau.sharepoint.com/sites/administration/shared documents/8000-8999/8200-
8299/8293/reports/06-09-22 civil engineering report_issue f.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06-09-22 Civil Engineering Report_Issue F.pdfRelated documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.