Original source · versioned page text
2019-06-11 P&E Agenda - Item 7 - Attachment 2 - Environment Strategy Implementation Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnMonitoring, evaluation and reporting
The success of the Environment Strategy will be measured Council will monitor and evaluate the Environment Strategy
and monitored using targets identified for each Strategy. and its implementation in two ways:
The targets and baseline measures are outlined in the
tables on the following pages. The results of this monitoring • Annual reporting on the progress of specific
will inform annual reporting back to the community on implementation actions associated with the
Council’s progress. Environment Strategy
• Biennial reporting against the 12 targets identified in
the Environment Strategy, to measure the success of
the Strategy’s implementation.
5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.