Referral Agency Response - Planning RAP21 0023

of 1

Page text shows just the words. Original shows the document exactly as it was published.

Officer: 	Lisa Pienaar
Direct Telephone: 	07 53296514
Our Reference:	RAP21/0023
Your Reference:	2954
30 September 2021
Windrim Building
C/- Martoo Consulting Pty Ltd
PO Box 1684
NOOSA HEADS  QLD  4567

[email protected]
Dear Sir/Madam,
Referral Agency Response
Planning Act 2016
I refer to your application and advise that Council, as a concurrence agency for the application, completed its assessment of the application on 27 September 2021. You are advised that Council requires conditions to be attached to any development approval. The conditions are listed below.
application details
Application No:	RAP21/0023
Street address:	49 Hilton Esp Tewantin Qld 4565
Real property description:	Lot 20 RP 41223
Planning Scheme:	Noosa Plan 2020 (25 September 2020)
type of development
The applicant seeks the following type of referral agency response:
Concurrence Agency Response for Dwelling House
concurrence agency conditions
PLANNING
When Conditions must be Complied With
Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues.
Approved Plans
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev	Plan/Document Name	Date
WD02	K	Site Plan, prepared by ARD	17.08.21
WD102	K	Fill Diagram, prepared by ARD	17.08.21
WD103	K	Eaves Diagram, prepared by ARD	17.08.21
WD105	K	Driveway Detail, prepared by ARD	17.08.21
WD106	K	Rear Setback Diagram, prepared by ARD	17.08.21
WD03	K	Ground Floor Plan, prepared by ARD	17.08.21
WD04	K	First Floor Plan, prepared by ARD	17.08.21
WD05	K	Roof Plan, prepared by ARD	17.08.21
WD08	K	Sections A & B, prepared by ARD	17.08.21
WD10	K	Sections E& F, prepared by ARD	17.08.21
WD12	K	Elevations, prepared by ARD	17.08.21
Currency
This Concurrence Agency response is no longer valid if the use has not commenced within 4 years of the date of this notice, unless otherwise extended in writing by Council.
Performance Bond
Security in the form of a cash bond or trading bank guarantee to the sum of $5,000.00 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Building Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions.
Building Height
The maximum height of the development must not exceed 8.37 metres above the natural ground surface in accordance with the approved plans.
Certification must be submitted to Council from a Licensed Surveyor which certifies that the building does not exceed the maximum height requirement of this Decision Notice.
Site Access and Driveways
A sealed access driveway must be provided from Hilton Esplanade to all parking and manoeuvring areas of the development. These proposed works must be undertaken with written approval in accordance with Noosa Council driveway crossover approval conditions and adopted standard drawings for the crossover type as required by the planning scheme.
Landscaping
A minimum of 20% of the site must be soft landscaping.

Privacy
The upper level balcony located on the southern building face must include either, balustrading or fixed external screens, positioned in such a way to obscure direct views into the habitable room windows or private open space areas of the adjoining property.
Stormwater Drainage
Private drainage structures are not allowed to be constructed on road reserve.
The site must be provided with a stormwater drainage system connecting to a lawful point of discharge without causing scour or damage to the subject site or any adjoining property. The works must be undertaken in accordance with a site specific Stormwater Management Plan (SWMP), prepared by a suitably qualified person.
The site specific SWMP must be approved as part of the subsequent Building Permit.
The site specific SWMP must be consistent with any site specific geotechnical report’s recommendations.
The stormwater drainage discharge from the development must be carried out in accordance with a professionally prepared engineering plan in compliance with the applicable standards and best engineering practices.
The development works must not cause additional ponding of water on any adjoining property (including the road reserve), or concentrate or direct overland flow to any adjoining property.
Services
Unless otherwise stipulated by telecommunications legislation at the time of construction, the development must be provided with all necessary conduits, pits and pipes to accommodate the future connection of optic fibre technology telecommunications.
Easements
Unless otherwise agreed in writing by the relevant service provider, any public or third party infrastructure located on the subject site must be placed within an easement registered against the title of the property.
All easements must be designed in accordance with the planning scheme and granted at no cost to the Grantee.  Where the Grantee is Council or a service authority, the easement documentation must be in accordance with the Grantee’s standard easement terms.  Draft easement documentation must be submitted to Council for endorsement.
All works must be kept clear of any existing or proposed easements on the subject land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
All fill and associated batters must be contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council. All earthworks must be undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
Where the development involves excavation or filling over, or adjacent to, drainage, water supply or sewerage infrastructure, all access chamber surface levels must be adjusted to provide a freeboard of 100mm above the finished ground surface level.
The proposed earthworks must be consistent with the site specific SWMP’s recommendations.
All retaining walls must be designed and constructed in accordance with the planning scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade safety fence.
Damage to Services and Assets
Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times:
where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or
where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval.
reasons for inclusion of conditions
The proposal is subject to specific built form parameters outlined in The Noosa Plan.
Advisory notes
The following notes are included for guidance and information purposes only and do not form part of the referral agency conditions:
Infrastructure Charges
All developments and/or changes to existing developments may require payment of “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution” made pursuant to the planning legislation and regulations current at the time of issue.
Sustainability
In line with Noosa Council’s Corporate Plan, Council seeks to encourage sustainable building design for residential and commercial development. Council encourages the use of sustainable building materials, energy efficient fittings, solar hot water, photovoltaic systems (including the use of inverter/charges), water saving devices and rainwater harvesting. For further information go to http://www.noosa.qld.gov.au/sustainable-homes.
rEPRESENTATIONS ABOUT REFERRAL AGENCY RESPONSE
The applicant may make representations to Council about this referral agency response at any time before the application is decided pursuant to section 30 of the Development Assessment Rules.

Yours faithfully,

Lisa Pienaar
Development Planner

Enc:	Approved Plans/Documents

[word/footer2.xml]
Page 2 of 1

[word/footer3.xml]
PO Box 141		P. (07) 5329 6500	[email protected]	
	TEWANTIN  QLD  4565	F. (07) 5329 6501	www.noosa.qld.gov.au
				Page 1 of 1

[word/header1.xml]
3
Log in to download the original file

Referral Agency Response - Planning RAP21 0023.docx · 79 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.