Log in to see the plans as drawn PAVEMENT DETAILS
\\\\\
>
\ \\\\
E/OH
//
2 COAT SEAL
>
//
\\\\\
| | |
|
\ \\\\
//
| | |
| THICKNESS MATERIAL TYPE CBR (soaked)
>
| | | | |
|
| | | | | | | |
// | |
-- 2 COAT SEAL -- --
| | | ||
|
//
| |
| | | |
>
\ \\\\
| | | 125mm BASE COURSE 2.1 80
// |
| ||
|
\\\\\
E/OH
| | 125mm SUBBASE COURSE 2.3 45
| | |
// | | | | | |
| |
>
15
| | |
| |
| | | | 200mm LOWER SUBBASE (IF REQUIRED) 2.5
| | |
\ \\\\
| |
| |
| |
| |
\\\\\
| | | |
2 COAT SEAL TO COMPRISE OF A 7mm + 14mm AGGREGATE WITH A
| |
| |
>
| | |
MINIMUM COVERAGE OF 170 m²/m³
| | | |
|
| | |
| | | |
|
| | | |
\ \\\\
| | |
|
FINAL PAVEMENT DEPTH TO BE DETERMINED FOLLOWING
|
|
||
|
E/OH
||
| SOIL TESTS BY GEOTECHNICAL ENGINEER.
|
|
|
|
|
|
|
|
|
| |
|
| | |
|
| | |
| | | | |
SUBGRADE COMPACTED TO 100% STANDARD COMPACTION.
\\\\\
| | |
| | | |
| | SUBSOIL DRAINAGE BOTH SIDES.
||
BASE COURSE GRAVEL TO BE SEALED WITH A HOT SPRAYED BITUMEN
>
\\\\\
| | | E/OH
| | | PRIME ([email protected] L/m2 OR EQUIVALENT) AND LEFT TO CURE FOR A
\ \\\\
|
| | | | | | |
E/OH // MINIMUM OF 14 DAYS BEFORE COMMENCING AC PAVING OPERATIONS. A
//
TACK COAT MUST ALSO BE APPLIED UNLESS ADVISED OTHERWISE BY
>
\ \\\\
H
E/O
THE SUPERVISING ENGINEER.
\\\\\
EXISTING POWER
>
\\\\\ POLE TO REMAIN
\\\\\
H
>
E/O
\ \\\\
EXISTING
BUILDING DWELLING
\
ENVELOPE
\\\\
\ \\\
1
\
H
E/O
\\\
\ \\
DRW
\\
\\
PROPOSED WATER TANK
||
SIZE AND LOCATION TO BE
|
|
| |
LOT 1 DETERMINED DURING BUILDING DESIGN
\\\
\\
DRIVEWAY ACCESS
375Ø RCP CLASS 3 EXISTING TELSTRA LINE AND PROPOSED LEVEL SPREADER FOR TANK OVERFLOW
\\\
\\
DRIVEWAY CULVERT CONNECT OVERFLOW PIPE
\\
PIT TO BE RELOCATED
\\\
TO LEVEL SPREADER
CAP BOTH ENDS
LOT 2
DRIVEWAY ACCESS PROVIDE 6-50Ø HOLES TO
SPREAD OUTLET FLOWS
6m 150Ø uPVC ROOFWATER
\\\
\\
BUILDING
ENVELOPE PROPOSED WATER TANK
SIZE AND LOCATION TO BE OUTLET SPREADER ELEVATION
DETERMINED DURING BUILDING DESIGN 2
\ \\
\\
NTS
> > > > >
> > > >
PROPOSED LEVEL SPREADER FOR TANK OVERFLOW > >
>
>
\\
> > > > ROOFWATER
\ \\
INLET
RAINWATER TANK
1.0m MIN
LEGEND: OUTLET SPREADER
PLAN
FINISHED SURFACE CONTOURS
SCALE 1:500 (A1), 1:1000 (A3)
OVERFLOW PIPE
EXISTING SURFACE CONTOURS
0 10 20 30 40 50 Meters
PROPOSED 2 COAT SEAL DRIVEWAY MIN 5m² 150mm NOM
SCALE 1:500 (A1), 1:1000 (A3) ROCK ON GEOFABRIC
PROPOSED VEGETATION COVENANT TYPICAL RAINWATER TANK OUTLET SPREADER
NTS
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
SWT PROJECT: DRAWING TITLE:
ALTA PROJECTS
Drawn: SWT
A.B.N. 611355330 ROADWORK LAYOUT PLAN
PRELIMINARY Date: July 2022 26 Memorial Avenue, Cotton Tree PROPOSED SUBDIVISION ESTATE
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked:. . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607
Email: [email protected]
at 96 BLACK MOUNTAIN RANGE ROAD, BLACK MOUNTAIN
DRAWING No:
A6682/22/P03 3 of 4
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for BRETT HAGE
REV DATE DESCRIPTION BY CHKD RPEQ - 7665 A1 SHEET SIZE FILENAME : A6682-P03 ROADWORK LAYOUT PLAN.dwg - DATE : 19/7/22 - 10:55am - XREF's: X-Base; X-Survey; X-DCDB; X-Image Council Ref: ............
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.