Original source · versioned page text
2015-12-08 Planning and Organisation Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 8 DECEMBER 2015
RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 8 December 2015 regarding Application No. REC15/0011 for a
Development Permit for Reconfiguring a Lot (1 into 11 + Environmental Reserve) situated at
1 George Street, Tewantin and approve the application in accordance with the following
conditions:
PLANNING
When Conditions Must Be Complied With
1. Unless otherwise stated, all works required by the conditions of this Decision Notice
must be completed prior to submission of the subdivision plan to Council for
compliance assessment.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply with
the approved plans of development. The approved plans are listed in the following
table unless otherwise amended by these conditions.
Plan No. Rev. Plan, prepared by Date
122205-11 Proposed Reconfiguration of a Lot – Lots 1-11 17/04/2015
& 900 Cancelling Lot 1 on RP220516,
prepared by RPS
15513-SK01 E Preliminary Stormwater Drainage Layout Plan, 07/10/2015
prepared by TOD Engineers
15513-SK02 E Preliminary Stormwater Drainage Layout Plan, 07/10/2015
prepared by TOD Engineers
3. All lot numbering on the subdivision plan to be submitted to Council for compliance
assessment must remain as shown on the Approved Plans.
4. The development must be undertaken and operated in a manner that causes no
detrimental effect upon the amenity of the neighbourhood by reason of the creation of
excessive noise, lighting nuisance or other emissions.
LANDSCAPING
Retention of Existing Trees
5. The existing trees on the site and within the George Street frontage shall be retained in
accordance with an Arborist Report prepared by a qualified person and endorsed
through an Operational Works approval and must include in particular:
a. The trees indicated for retention within the George Street frontage as shown on
Drawing 15513-SK01 Revision E;
b. All trees above 2m in height on the proposed lots, not affected by any
infrastructure or earthworks, must be retained until a building permit has been
issued for that lot;
c. Any underground pipelines and/or conduits for services across George Street
and/or the park area must be tunnel bored where necessary to preserve mature
trees;
d. Trees identified on the Preliminary Rehabilitation Plans drawn by Mark Bizzell
and dated 13 May 2015 are not to be removed as part of this higher order
approval.
Page 4 of 68
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.