Original source · versioned page text
GO NOOSA TRANSPORT INITIATIVES 2023/24 EVALUATION AND 2024/25 IMPLEMENTATION · Attachment 1 - Go Noosa - Car Park Tech Trial 202324 Evaluation
GENERAL COMMITTEE MEETING REPORT AUGUST 2024
GO NOOSA Transport Initiatives 23/24 Evaluation and 24/25 Implementation
*Please note: The Main Beach car park average occupancy over the entire period has been
reduced and is not reflective of the actual car parking numbers due to the closure period for Main
Beach People’s Park. The graph has been included for transparency and consistency with the
other data.
Figure 3: Average vehicle stays by location (for the entire period)
Page 9 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original