Original source · versioned page text
2202-27336 SRA - Amended response - with conditions (RAL21_0022)
Attached to the e-mail Amended SARA Referral Response - RAL21/0022.
2202-27336 SRA
Attachment 1—Changed conditions to be imposed
No. Conditions Condition timing
Reconfiguring a lot
10.9.4.2.1 — Reconfiguring a lot near a state transport corridor — The chief executive administering
the Planning Act 2016 nominates the Director-General of the Department of Transport and Main Roads
to be the enforcement authority for the development to which this development approval relates for the
administration and enforcement of any matter relating to the following conditions:
1. (a) Stormwater management of the development must ensure no (a) and (b) At all
worsening or actionable nuisance to the state-controlled road. times
(b) Any works on the land must not:
i. create any new discharge points for stormwater runoff
onto the state-controlled road;
ii. interfere with and/or cause damage to the existing
stormwater drainage on the state-controlled road;
iii. surcharge any existing culvert or drain on the state-
controlled road;
iv. reduce the quality of stormwater discharge onto the state-
controlled road.
2. (a) The road access location, is to be located generally in (a) At all times
accordance with Preliminary External Roadworks Sketch Plan,
prepared by Walsh Consulting Engineers, dated 16/05/22, (b) and (c) Prior to
reference C6361/22/SK01 and revision A, as amended in red submitting the plan of
by SARA on 20 June 2022. Preliminary external roadworks survey to the local
layout plan, prepared by Walsh Consulting Engineers, government for
dated 24 March 2023, drawing number C6361/22/P04 and approval
revision F as amended in red by SARA on 27 April 2023.
(b) Road access works must be provided at the road access
location comprising:
Basic Left Turn (BAL) treatment.
Basic Right Turn (BAR) treatment.
Relocation of existing power pole adjacent to south-bound
lane on Reserve Street to opposite side of Reserve Street and
allow a minimum distance of 4.5m between the power pole
and edge line of carriageway.
Flag lighting of intersection. Light pole to have slip base if
located inside the clear zone.
i. channelised right turn (short) (CHR(s)) treatment
ii. pavement widening to Reserve Street northbound
lane to accommodate channelised right turn
(short) lane.
(c) The road access works must be designed and constructed in
accordance with the Department of Transport and Main
Roads' Road Planning and Design Manual 2017 2nd Edition.
3. The road works must be provided generally in accordance with Prior to submitting
the following plans: the plan of survey
(a) Preliminary External Roadworks Layout Plan prepared by to the local
Walsh Consulting Engineers dated 24/03/2023, reference government for
C6361/22/P04 revision F. approval
State Assessment and Referral Agency Page 3 of 5