Skip to the record
The gold standard in government transparency.

Council archive · source document

Response to Information Request 10-6-2025 Traffic guidance scheme · OPW25/0042

of 16

Text shows just the words. Original shows the document exactly as it was published.

 Rev                      Details                      Date        By
  0     Initial Release                            28/04/2025     DS




TGS TITLE:




        CMI Investments -
  Serenity Close, Noosa Heads -
 Trucks Turning/hold and release
                -
      CMI-1AP-25040286.1




                          TGS REQUIREMENTS:                                                                                                                     Serenity Cl
              Signs:                    22

           Controllers:                 2




                                                                                                                                                                      TAKE
                                                                                                                           m
                                                                                                                  30




                                                                                                                                                                      DO NOT OVER
          Traffic Lights:               0




                                                                                                                                                                  AHEAD
                                                                                                                                                                  WORK
                                                                                                                                                                  ROAD
             TC Utes:                   2

            VMS Utes:                   0                                                                 R
                                                                                                         W OA
                                                                                                       AH OR D
                                                                                                         EA K
                                                                                                                                                         30 m
              TMA:                      0                                                           DO     D
                                                                                                      NO
                                                                                                        TO
          Safety Buffer:                N/A                                                                VE
                                                                                                                RT
                                                                                                                  AK
                                                                                                                       E
          Taper Length:                 N/A                                                                                                 ENTRY/EXIT
                                                                                                                                             POINT 2




                                                                                                                                                                                    Joins CMI-1AP-25040286.2 Here
        Work Zone Speed:                40 km/h

           Additional:                  N/A

                        WORKS DESCRIPTION:

          Works Term:                   Short
                                                                                                      l
                                                                                                    C




           Operation:                   Trucks Turning/hold and release
                                                                                                ty
                                                                                                ni
                                                                                           re




           Lane Width:                  3.0m
                                                                                           Se




 Traffic Clearance to Worker:           > 1.2m

Traffic Clearance to Excavation:        >2.5m

       Depth of Excavation:             ≤ 500mm

 Traffic Clearance to Objects :         0.3m

Traffic Cone Spacing @ 40km:            4m

Traffic Cone Spacing @ 60km:            12 m

        Traffic Cone Size:              700mm

                          SITE DESCRIPTION:                                                30
                                                                                                m
                                                                              DO




          Road Category:                1
                                                                              NO

                                                                                 AH OR D
                                                                            T


                                                                                   W OA
                                                                                   EA K
                                                                           OV



                                                                                    R
                                                                                     D
                                                                              E




            Road Type:                  Two-way Divided
                                                                          RT
                                                                            AK




                                                                                                                               ENTRY/EXIT
                                                                          E




          Road Authority:               NSC                                                                                     POINT 3
            Travel Path:                Past

             Direction:                 NB/SB/EB/WB

           Pedestrians:                 Past

             Cyclists:                  Not Affected

          Posted Speed:                 50 km/h

           Traffic Management Designer:
             David Stevens 293 Open

                   RPEQ Sign Off: NO


                                    N




       SCALE OF PLAN (1 : 1000)

Used in these records

About this file

File size
1.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to Information Request 10-6-2025 Traffic guidance scheme.pdf · 1.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.