Town Planning Report

of 78

Page text shows just the words. Original shows the document exactly as it was published.

 Table 9.4.3.3—Existing Services Code
 Performance outcomes                                               Acceptable outcomes                                                     Response
                                                                    The easement is centred over the centreline of the infrastructure.      An easement is not proposed as part of this application.



Landscape Code
The indented outcomes of the Landscape code have been addressed in the Landscape Concept Plan by OpenSpace Architecture lodged alongside this
application.



Sustainable Building Design Code
 Table 9.4.6.3—Sustainable Building Design Code
 Performance outcomes                                               Acceptable outcomes                                                     Response
 Energy Efficiency
 PO1                                                                No acceptable outcome provided                                          Complies
 Development minimises energy consumption and the production of                                                                             The orientation of the building provides access to north eastern light
 greenhouse gas emissions.                                                                                                                  and coastal breezes reducing reliance of artificial cooling and
                                                                                                                                            heating. The design is considered to reduce energy consumption.
 Water efficiency and stormwater management
 PO2                                                                AO2.1                                                                   Noted
 Development maximises water efficiency on site by incorporating    If for accommodation activities, a minimum 3,000 litres of rain water   Rainwater storage can be accommodated where required.
 rainwater collection and reuse measures for non-potable purposes   storage is provided per dwelling and reused for non-potable
 such as irrigation.                                                purposes and incorporated into a stormwater management plan for
                                                                    the development.
                                                                    AO2.2                                                                   Not Applicable
                                                                    With the exception of accommodation activities, rain water storage      The proposal is for accommodation activities.
                                                                    sufficient for the intended use is captured and used on-site for non-
                                                                    potable purposes and incorporated into a stormwater management
                                                                    plan for the development.




Town Planning Report - 65-67 Elanda Street, Sunshine Beach                                                                                                                                                     65
Log in to download the original file

TOWN PLANNING REPORT.PDF · 3.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.