Original source · versioned page text
Part C - Attachments E to G
Attached to the e-mail Other Change Application – 132002.220285.5.
The original of this document is very large (15.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 16, section 1. The text section number identifies this passage in the reader.
309 [OCR of page images] NOOSA COUNCIL IDAS Development Application Decision Notice 15 82. 83. 85. 86. 81.2. include individual charts plotting the results for all parameters required in the monitoring (digital form should be in Excel); 81.3. include a brief written discussion of the results and recommend any necessary actions The Environmental Management Plan shall incorporate the requirement for three monthly environmental compliance monitoring and annual audit reports to be submitted to Council for the operational stage of the development. The reporting on the operational stage will continue for a period of five (5) years from the commencement of the use. The format and content of these reports shall be in hard copy and digital form, generally in accordance with the following:- e include tables of the monitoring results (digital form should be in Excel); e include individual charts plotting the results for all parameters required in the monitoring (digital form should be in Excel); « include a brief written description of the results and recommend any necessary actions. Site Rehabilitation Plan (SRP) A suitably qualified person shall prepare a SRP for the open space areas (OS3, OSS and OS7) and water quality/quantity control devices such as swales. The SRP shall be prepared and submitted prior to the issue of a development approval for operational works and shall be to the reasonable satisfaction of the Manager - Land Use. The SRP shall specify actions to be undertaken to restore the natural ecological processes and facilitate ecological sustainability of the OS3, OS5 and OS7 areas. They shall include, inter alia: 84.1. the need for thinning dense fire-induced undergrowth that has stalled natural regenerative processes, 84.2. the need for reinforcement plantings to ameliorate structural deficiencies, biodiversity deficiencies or habitat deficiencies, and 84.3. the required visual screening. The SRP shail contain specific actions to be underlaken for the water quality/quantity devices to re- vegetate these areas using species endemic to the site so that they become viable and efficient structures in terms of stormwater management, as well as self-sustaining ecosystems. The SRP shall detail the work required to be undertaken and shall detail, inter alia: 86.1. site preparation; 86.2. construction materials and details; 86.3. weed control; 86.4. planting layouts and species; 86.5. erosion and sediment control; 86.6. planting out procedures and horticultural requirements; 86.7. mulching procedures (if any); 86.8. fertilising procedures (if any); 86.9. irrigation and watering requirements; 86.10. on-going maintenance; and 86.11. environmental safeguards. A o:\databaseionestop\decision.doc 309
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.