Original source · versioned page text
Part C - Attachments E to G
Attached to the e-mail Other Change Application – 132002.220285.5.
The original of this document is very large (15.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 18, section 1. The text section number identifies this passage in the reader.
311 [OCR of page images] NOOSA COUNCIL IDAS Development Application Decision Notice 17 94. 95. 96. 97. 98. 99, 100. 101. 102. 103. 104. 105. 106. 107. 108. The design of the evaporative cooling system shall seek to optimise energy efficiency by identifying and maximising the advantage of the prevailing winds at the site. Spectrally selective and/or low emissivity glass shall be incorporated where appropriate in the detailed design, so as to reduce heat transmission to and from buildings. Hot water requirements of the site are to be provided by solar powered hot water systems, heat pumps, or heat recovered from refrigeration or air-conditioning systems subject to compliance with relevant health regulations. Where it is demonstrated to be satisfactory. by the Manager — Environmental Services that such technology is impracticable, five star solar gas hot water will be accepted as an alternative. The developer shall seek to apply the energy efficiency strategies listed at Table 5.1 of the Energy Efficiency Assessment report where appropriate in the detailed design of buildings. Use the Australian Greenhouse Building Rating System (AGBR) scheme to rate the greenhouse and energy performance for commercial/business precinct of the NSBC. The developer shall prepare and implement a Building Energy Performance Management and Monitoring Plan (“BEPMMP") to the reasonable satisfaction of the Manager Land Use, dealing with programmed time controlled scheduling for all areas capable of separable operation, demand management, trend logging, energy usage monitoring and reporting and exception events reporting. The developer shall report to the Council in writing the results of the monitoring of performance against the BEPMMP on the first, second and third anniversaries of the commencement of use Stage 1 of the NSBC. The report shall note the strategies and recommendations of the Parsons Brinckerhoff report (April 2003) that have been carried through to the development. Deleted. The proposed wind catcher ventilation shafts shall be designed to achieve optimal internal ventilation of buildings consistent with acceptable standards of comfort. The developer will design tenancy agreements to ensure that any self-contained commercial refrigeration used on site will meet any mandatory minimum energy performance standards for self- contained commercial refrigeration to be introduced from July 2005. The developer will also design tenancy agreements to ensure that in general all appliances used on site are as energy efficient as possible. Waste Management & Recycling The applicant must provide a suitably screened imperviously paved area large enough for all refuse and recycling containers for each building complex. A wash down area is required with a cold-water tap, hose and drain outlet connected to sewer. The drain outlet is to be designed to prevent stormwater entry to the sewerage system. Refuse containers must be provided in accordance with the requirements of the Environmental Protection (Interim Waste) Regulations 1996 and (Waste Management) Regulation 2000, for the storage and collection of refuse. The development must allow refuse-loading areas to be located off street. All vehicles associated with the collection of waste/recyclables, shall enter and leave the site in a forward direction. © The applicant is to ensure that operational procedures are in place for the prevention of wind blown litter on the site during both the construction and operational phases of the development. Street litterbins and recycling bins to a design approved by Council, shall be supplied and installed at the applicants expense at agreed locations. The applicant shall submit a Waste Management Plan (WMP) for the construction phase of the development prior to the issue of a development permit for operational works. The WMP shall be to the reasonable satisfaction of the Manager Environmental Services, and shall contain information generally in accordance with the following:- A o\databaselonestop\decision.doc 311
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.