Original source · versioned page text
Part C - Attachments E to G
Attached to the e-mail Other Change Application – 132002.220285.5.
The original of this document is very large (15.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 31, section 1. The text section number identifies this passage in the reader.
324 [OCR of page images] NOOSA COUNCIL IDAS Development Application Decision Notice 30 227. 228. 229. 230. 231. 232. 233. 234. 235. 236. 237. Only ancillary dining facilities associated with Showroom 4 in Area 1 are permitted and no greater than 10 chairs shall be provided within either the premises or adjacent outdoor area. The outdoor dining areas associated with the Retail Centre component shall not exceed 599m?. The outdoor dining areas located along the northern facade of the Retail Centre (Area 2) shall be reduced in size so as to allow the adjacent pedestrian pathway to have a minimum width of 2 metres. The outdoor dining landscaped buffer shall have a minimum width of 1.2m is to be provided as shown on the approved plans. The eastern area of the Retail Centre (Area 3) shown on the approved plans comprising 155m? is to include 2 trees in pots located on the proposed dining area. A total of 15 carparks and 7 motorcycle spaces are to be provided for the development in addition to the carparks and motorbike spaces required by the Negotiated Decision Notice dated 14 August 2003 Pedestrian access to all shop entrances shall be kept clear at all times. Any paved or deck areas are not to be enclosed with shutters, glass panelling, fixed roofs or the like, thus remaining as open areas. All outdoor dining areas shall not include roll-up or drop plastic sheeting. Any shade covers proposed shall be removable or retractable such as umbrellas and roll-back awnings and be constructed from lightweight materials of natural muted earth tones to compliment the approved building to the reasonable satisfaction of the Manager Land Use. Fixed non-retractable shade covers shall not be utilised. Landscaping shall be constructed as indicated on the approved concept plans. Appropriate species and pot sizes must be approved by the Manager Land Use prior to the commencement of landscaping construction. The species selected shall be in accordance with the requirements of the approved Landscape Management Plan. The following additional contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28 and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks Contributions respectively and at the rates applicable at the time of payment. An estimate only of the contribution rates under the current policies is outlined below. These amounts will adjusted in line with changes to the Consumer Price Index, All Groups Brisbane from December 2005 until the date of payment. Water Supply $1,914 Sewerage $1,046 TOTAL $2,960 All headworks contributions must be paid prior to the issue of a Development Permit for Operational Works. Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the headworks contributions not be paid at the due time, Council shail call upon the trading bank guarantee in full. In the event thai the Development Permit for Material Change of Use of Premises lapses or is cancelled, the contribution or trading bank guarantee will be returned. A o:ldatabaselonesionidecision.doc 324
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.