Part C - Attachments E to G

Attached to the e-mail Other Change Application – 132002.220285.5.

of 69

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 33, section 1. The text section number identifies this passage in the reader.

326


[OCR of page images]
NOOSA COUNCIL IDAS Development Application Decision Notice 32

10. Provision shall be made to contain any leakage/spillage and contaminated waste water from above

: ground petroleum product storage tanks and package storage areas, and to prevent it from contaminating
surrounding soil and stormwater. As a minimum, spill control measure shall be in accordance with AS
1940.

11, Drainage from tank and package store bunds and compounds must be manually controlled so that all
wastewater passes through treatment facilities before release to the environment. Any valve controlling
the drainage from a compound shall be located outside the bund. The valve shall be of a type in which
the distinction between open and closed positions is obvious and shall be closed and locked at all times
except when flow to the treatment facility is authorised by management.

12. Provide a notice adjacent to the bund valve displaying the following:

13. “Bund drain valve to be kept closed and locked”

14. Minor spills shall be controlled by use of absorbent material such as rags, kitty litter or similar and
disposed of with industrial refuse.

15. Provide fill point to aboveground tank inside bund containment with a dry break coupling or spill tray to
prevent incidental spill during refueling.

16. Clean and maintain bund compound integrity at all times.

Solid Waste

17. All solid waste shall be removed from the premises to an approved waste facility by a licensed waste
transporter.

General

18. All storage of flammable and combustible liquids must be stored in compliance with Australian Standard
AS 1940 - 1993 “The Storage and Handling of Flammable and Combustible Liquids’. If storage limits
exceed minor storage, then an application for licence for the storage of flammable and combustible liquids
must be lodged with the local authority.

19. Develop an inventory control system. Such inventory control measurements shall be reconciled by
comparing product and water level measurements with dispenser metre readings and deliveries. The
reconciliation shall be conducted for each individual tank each day that product is added or removed from
the underground storage tank. The inventory control computations on any loss or gain of product shall be
included with a monthly summary of cumulative losses or gains of product.

Note: Inventory control records and reconciliation data shall be:
a) maintained and kept on site

b) kept in an acceptable manner and format

c) made available to the administering authority

d) maintained for a minimum of 5 years

20. When a loss of product or discharge is indicated by any unexplained variation greater than 0.5% in the
inventory reconciliation, the operator shall immediately notify the Administering Authority.

21. In the event of a situation creating environmental harm pertaining to a spill, leak, fire, explosion or similar,
the Administering Authority shall be notified and advised of the incident and circumstances as soon as
reasonably practicable after becoming aware of the event.

22. All mechanical and elecirical leak detection equipment shall be inspected and tested annually. All
records shall be kept on site for a minimum of 5 years.

23. Ensure tank abandonment is carried out by either removal of the tank, or filling the whole of the tank with
an inert soil material such as sand, concrete or other approved material, and the disconnection of all
pipes from the tank as stipulated in AS 1940 and the Contaminated Land Act.

24. Ensure all persons working on site where petroleum products are stored shall have relevant training in
accordance with AS 1940 clause 9.3.

25. _ Ensure that the premise is licensed with the Local Authority under the Dangerous Goods and Safety Act

2001.

A o:\databaselonesiop\decision.doc

326

 

 
Log in to download the original file

Part C - Attachments E to G.PDF · 15.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.