RFI - RECOR Preliminary Stormwater Management Report - 20220078
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
6 Wyandra Street 20220078 Forde Property Stormwater Management Plan November 2022 [OCR of page images] REC: 6 Wyandra Street 20220078 Forde Property Stormwater Management Plan November 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of sections 2 to 19 (of 34)
Section 2
Document control record
Document prepared by:
RECOR Pty Ltd
ABN 89 647 469 707
37 Mary Street
Noosaville, QLD 4566
Australia
T +61 7 5211 1003
E [email protected]
W recorconsulting.com
A person using RECOR documents or data accepts the risk of:
a) Using the documents or data in electronic form without requesting and checking them for accuracy against the original hard
copy version.
b) Using the documents or data for any purpose not agreed to in writing by RECOR.
Document control
Report title Stormwater Management Plan
Document code 20220078-SWMP01 Project number 20220078
File path C:\12dS\data\RecorSYN\20220078 Safari St_484\03 Engineering\02 CIV\02 Reports\RECOR
Preliminary Stormwater Management Report - 20220078.docx
Client Forde Property
Client contact - Client reference -
Rev Date Revision details/status Author Reviewer Verifier Approver
(if required)
0 30/03/2021 Initial Version B. Parry N. Wagstaff
1 24/06/2021 Updated layout B. Parry N. Wagstaff
2 11/11/2022 Incorporated J.Bauleka J.Bauleka
recommendations of Slope
Stability Report
Current revision 2
Approval
Author signature Approver signature
Name J.Bauleka Name J.Bauleka
RPEQ: 20693
Title Civil Engineer Title Civil Engineer
recorconsulting.com
A 75 Noosa Drive, Noosa Heads Qld 4566 E [email protected]
P +61 7 5211 1003
Section 3
recorconsulting.com
A 75 Noosa Drive, Noosa Heads Qld 4566 E [email protected]
P +61 7 5211 1003
Section 4
Contents
Introduction ....................................................................................................................................5
Site Details......................................................................................................................................6
2.1. Existing Site Description & Drainage .................................................................................................. 6
2.2. Existing Drainage Patterns .................................................................................................................. 6
2.3. Proposed Development Drainage Pattern ......................................................................................... 7
2.4. Flood Considerations ........................................................................................................................... 7
Stormwater Quantity .......................................................................................................................8
3.1. Pre-Post Comparison........................................................................................................................... 8
Stormwater Quality........................................................................................................................11
4.1. Construction Phase............................................................................................................................11
4.2. Operational Phase .............................................................................................................................12
Conclusion....................................................................................................................................13
Appendices
Appendix A
Proposed Development Concept Plans
Appendix B
DRAINS Modelling Parameters and Results
Project number 20220078
File RECOR Preliminary Stormwater Management Report - 20220078, 2022-11-11
Revision 2
recorconsulting.com
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4566 E [email protected]
Section 5
INTRODUCTION
RECOR has been engaged to prepare a Stormwater Management Report to accompany a development application
for a residential duplex development located on the corner of Safari Street and Wyandra Street, Noosa Heads.
This report investigates the stormwater management considerations for the existing and proposed development
site and assesses how the run-off from the site is to be managed in accordance with:
Noosa Shire Council requirements for stormwater drainage; and
Slope Stability Assessment Report (Ref: 32167(SL)) undertaken by SCG Consulting Engineers (SCG).
Project number 20220078
File RECOR Preliminary Stormwater Management Report - 20220078, 2022-11-11 Page 5 of 16
Revision 2
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4566 E [email protected] recorconsulting.com
Section 6
SITE DETAILS
2.1. Existing Site Description & Drainage
The existing site, known in real property terms as Lot 40 RP 139776, is located at 6 Wyandra Street having frontage
to both Wyandra Street and Safari Street. The existing site contains a residential dwelling with a site area of 598m².
2.2. Existing Drainage Patterns
The subject land falls typically south-west towards Wyandra Street at grades varying across the site. The natural
surface falls at between 20% to 30% along the site boundaries, however the centre of the site containing the existing
dwelling is flatter at approximately 10%.
The run-off from the site typically drains as overland surface flows towards the south-west where it is captured by the
stormwater infrastructure within the road reserve. Two existing kerb inlet pits within the road reserve are likely to
capture all run-off from the existing site.
Roof run-off is conveyed by downpipes below ground, and it is considered that a kerb adapter outlet observed in
the Safari Street frontage kerb is the discharge point for these pipes.
Due to the sloping nature of the site, run-off from the upstream adjacent properties to the north and east is expected
to drain across the subject site.
Figure 2.1 - Site Locality Plan (Noosa Council Intramaps, 2022)
Project number 20220078
File RECOR Preliminary Stormwater Management Report - 20220078, 2022-11-11 Page 6 of 16
Revision 2
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4566 E [email protected] recorconsulting.com
Section 7
2.3. Proposed Development Drainage Pattern
2.3.1 Stormwater Concept
The internal stormwater drainage network will consist of a number of pits to provide collection points for upstream
run-off and enclosed courtyard areas draining under gravity to connect to the existing Council stormwater
infrastructure in Wyandra Street.
Roof run-off from the new building will be drained via downpipes into a stormwater attenuation tank. The tank is
sized to reduce the overall developed site flows to pre-development levels, ensuring discharge from the site
minimises any impact to the downstream environment.
Subsurface drainage from the retaining walls (designed by others) is to connect into the internal drainage system.
Surface drainage to intercept overland sheet flows at the top and base of excavations is to be considered by the
retaining wall designer, in accordance with SCG’s report.
The internal drainage will be conveyed and discharged into an existing kerb inlet pit on Wyandra Street as the lawful
point of discharge from the site.
The roof and allotment drainage system for the proposed site shall be designed to comply with:
1. Noosa Shire Council Planning Scheme Policy (PSP) - Engineering Design Standards – Roads, drainage and
earthworks;
2. The Queensland Urban Drainage Manual (QUDM); and
3. AS/NZS 3500.3:2015 - Plumbing and Drainage Part 3: Stormwater Drainage.
Refer to Appendix A Proposed Development Concept Plan for the proposed stormwater drainage layout plan
illustrating the concept described above.
2.4. Flood Considerations
Review of the Noosa Shire Council Intramaps flood layers including the Flood Hazards Overlay has identified that
the site is located outside of any flood or inundation areas within the locality indicating it is not expected that that
the proposed development will be subject to flooding.
Project number 20220078
File RECOR Preliminary Stormwater Management Report - 20220078, 2022-11-11 Page 7 of 16
Revision 2
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4566 E [email protected] recorconsulting.com
Section 8
STORMWATER QUANTITY
3.1. Pre-Post Comparison
As the development proposes to increase the impervious area of the site by approximately 146m² (from 304m² to
450m²), there is likely to be an increase in peak flows from the site. The site has therefore been modelled using the
DRAINS software to assess the impact on peak flows, comparing the existing site conditions to the proposed
development.
In accordance with ARR2019, an Initial Loss-Continuing Loss (IL-CL) model has been used to assess the site against
the ensemble of storm temporal patterns for the East Coast North region. The loss parameters and temporal patterns
have been imported from the ARR Datahub, and rainfall intensities have been imported from the Bureau of
Meteorology IFD rainfall data allowing for a 20% increase to rainfall depths to account for future climate change
patterns.
The parameters obtained from the Australian Rainfall and Runoff (ARR) Data Hub for the location and the rainfall
IFD data obtained from the Bureau of Meteorology have been imported into Drains to generate the storm events.
The models have been run using the ensemble of storm events for 1EY, 50%, 0.2EY, 10%, 5%, 2% and 1% Annual
Exceedance Probability (AEP) for durations from 1 minutes to 24 hours to determine the critical storm duration and
the mean peak flowrate from the storms. Refer to Appendix B DRAINS Modelling Parameters and Results for details
of the parameters used and summary of the results from the modelling.
The model used to represent the development is shown below in Figure 3.1 – DRAINS model layout.
Figure 3.1 – DRAINS model layout
The configuration of the catchment areas for pre-development, post-development and split post development for
roofwater to an attenuation tank are shown in Figure 3.2 – DRAINS Pre-development catchment, Figure 3.3 – DRAINS
Post-development catchments and Figure 3.4 – DRAINS Split Post-development catchment respectively.
Project number 20220078
File RECOR Preliminary Stormwater Management Report - 20220078, 2022-11-11 Page 8 of 16
Revision 2
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4566 E [email protected] recorconsulting.com
Section 9
Figure 3.2 – DRAINS Pre-development catchment
Figure 3.3 – DRAINS Post-development catchments
Figure 3.4 – DRAINS Split Post-development catchments
The results of the modelling against the range of design storms for the development under the existing and
proposed development conditions are shown in Table 3.1 Existing and proposed unmitigated site peak discharge
rates.
Table 3.1 Existing and proposed unmitigated site peak discharge rates
Wyandra Street
Qchange
A.E.P Qexisting Qproposed Qchange (%)
(m³/s) (m³/s) (m³/s)
1EY 0.016 0.018 0.002 13%
50% 0.019 0.02 0.001 5%
0.2 EY 0.028 0.03 0.002 7%
10% 0.036 0.036 0 0%
5% 0.041 0.041 0 0%
2% 0.047 0.047 0 0%
1% 0.051 0.052 0.001 2%
Project number 20220078
File RECOR Preliminary Stormwater Management Report - 20220078, 2022-11-11 Page 9 of 16
Revision 2
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4566 E [email protected] recorconsulting.com
Section 10
As expected, the site has increased the total peak flows from the site for a number of storm events. Attenuation will
be required to mitigate the outflows to ensure that the development does not exceed the predevelopment levels to
minimise impacts to the downstream environment.
The mitigated post-development model splits the catchment into a roof area, which drains to an on-site detention
(OSD) tank, and the remainder of the site which is not attenuated. An iterative process was used to determine a
suitable configuration of storage volume, low-flow, and high flow pipe outlets for the OSD to deliver the required
reduction of the flow rates from the site.
The result of the iterative sizing process determined that the OSD storage will need to provide an attenuation
capacity of 4,000L for the proposed roof area with the maximum possible roof area to be plumbed to the tank. A low
flow outlet consisting of a 53mm orifice plate is to be provided the base of the tank, and a 100mm high flow outlet
at the head of the tank will provide discharge for larger storm events.
Using this mitigated development model, the proposed developed flows were again compared to the existing state
as shown below in Table 3.2 Existing and proposed mitigated site peak discharge rates.
Table 3.2 Existing and proposed mitigated site peak discharge rates
Wyandra Street
Qchange
A.E.P Qexisting Qmitigated Qchange (%)
(m³/s) (m³/s) (m³/s)
1EY 0.016 0.015 -0.001 -6%
50% 0.019 0.017 -0.002 -11%
0.2 EY 0.028 0.025 -0.003 -11%
10% 0.036 0.03 -0.006 -17%
5% 0.041 0.037 -0.004 -10%
2% 0.047 0.045 -0.002 -4%
1% 0.051 0.051 0 0%
As the total peak flows are equal to or below the existing site conditions for all storm events, the proposed OSD area
will provide the mitigation required for the peak flow storm events from the development.
Project number 20220078
File RECOR Preliminary Stormwater Management Report - 20220078, 2022-11-11 Page 10 of 16
Revision 2
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4566 E [email protected] recorconsulting.com
Section 11
STORMWATER QUALITY
The following sections discuss the stormwater quality considerations for the construction and operational phase of
the development.
4.1. Construction Phase
4.1.1 Erosion and Sediment Control Measures
During construction, it is necessary to manage stormwater run-off to avoid potential contamination of downstream
waterways from sediments and other pollutants from the site. A range of best practice sediment and erosion controls
should be implemented on the development to ensure negative impacts to the downstream receiving environment
are mitigated.
As the area being developed is below 2,500m², the development’s construction will be managed using best practice
erosion and sediment control principles in line with the desired outcomes of Appendix 2 of the SPP (DERM, July
2017), which are shown below in Figure 4.1.
Figure 4.1 SPP 2017 Construction Phase Stormwater Management Design Objectives
A site-specific erosion and sediment control plan shall be prepared as part of a future submission for Operational
Works approval. Suitable erosion and sediment controls for the site may include:
1. Sediment fencing along downstream of the work areas within the site to prevent sediment from leaving the
construction area.
2. A shakedown area is to be installed at the construction entry/exit to the proposed development area to
minimise sediment being transported to and from
Project number 20220078 the site.
File RECOR Preliminary Stormwater Management Report - 20220078, 2022-11-11 Page 11 of 16
Revision 2
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4566 E [email protected] recorconsulting.com
Section 12
3. Downstream pits within the road reserve are to be protected through filter socks or similar.
4. Diversion of upstream catchments around any exposed areas through the use of diversion drains around the
site.
4.2. Operational Phase
The development consists of a small lot duplex consistent in character with the existing residential dwelling. The
proposed development is not considered to significantly alter the pollutant generation potential of the site, and
therefore no additional stormwater quality treatment is proposed for the development.
Project number 20220078
File RECOR Preliminary Stormwater Management Report - 20220078, 2022-11-11 Page 12 of 16
Revision 2
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4566 E [email protected] recorconsulting.com
Section 13
CONCLUSION
This Stormwater Management Report has outlined how the stormwater run-off from the site is to be managed to
comply with the relevant requirements and minimise any adverse impacts to the downstream catchments.
The proposed site surface run-off is captured internally and discharge into the Council stormwater
infrastructure on Wyandra Street as the lawful point of discharge.
Retaining wall drainage is to connect to the internal drainage system, with the wall designer considering and
implementing the recommendations of SCG’s report.
Field inlet pits are provided within the development to capture upstream run-off and convey it through the
development.
The existing and proposed development site have been modelled for the critical design storm events for the
site, which found attenuation would be required. Provision of a 4kL attenuation tank with a 53mm low flow
orifice and 100mm high flow outlet was found to provide mitigate the development such that there will be
no increase to existing peak flow discharges from the site for the modelled storm events.
During construction, erosion and sediment control measures are to be implemented to minimise potential
contaminants impacting the downstream receiving environment in line with the objectives of Appendix 2 of
the SPP. An erosion and sediment control plan shall be developed as part of a submission for Operational
Works approvals.
As the development is a small residential site that does not significantly alter the pollutant generating
characteristics of the site, stormwater quality treatment is not proposed for the development.
The proposed stormwater solution is considered to minimise any adverse impacts to the downstream
environment arising from the stormwater run-off while also meeting the stormwater quality targets required
for the development.
Project number 20220078
File RECOR Preliminary Stormwater Management Report - 20220078, 2022-11-11 Page 13 of 16
Revision 2
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4566 E [email protected] recorconsulting.com
Section 14
Appendix A Proposed Development Concept Plans Project number 20220078 File RECOR Preliminary Stormwater Management Report - 20220078, 2022-11-11 Page 14 of 16 Revision 2 P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4566 E [email protected] recorconsulting.com
Section 15
RESIDENTIAL DUPLEX DEVELOPMENT
6 WYANDRA STREET, NOOSA HEADS, QLD 4567
Lot 40 RP 139776
CIVIL WORKS
GENERAL NOTES:
THE FOLLOWING INSPECTIONS MUST BE COMPLETED BY RECOR ENGINEERS BEFORE 9. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL WORKPLACE
ENGINEERING CERTIFICATION WILL BE ISSUED. THE CONTRACTOR IS TO PROVIDE A MINIMUM HEALTH AND SAFETY REQUIREMENTS.
OF 72 HOURS NOTICE TO RECOR FOR REQUIRED INSPECTIONS. SHOULD THE CONTRACTOR FAIL 10. WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE TO BE IN CLOSE PROXIMITY TO
TO REQUEST AN INSPECTION, THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL COSTS TO NEIGHBOURING LOT BOUNDARIES OR INFRASTRUCTURE, CONTRACTOR TO ALLOW IN
ALLOW FOR THE WORKS TO BE INSPECTED TO THE SATISFACTION OF RECOR. ANY SCOPE OF WORKS TO PROVIDE ALL MEASURES NECESSARY TO ENSURE THE INTEGRITY
INSPECTIONS THAT FAIL ARE TO BE RE-INSPECTED WITH ALL REINSPECTION COSTS TO BE PAID OF EXISTING BOUNDARIES AND INFRASTRUCTURE. THIS MAY INCLUDE THE USE OF LOW
BY THE CONTRACTOR. VIBRATION EQUIPMENT, TRENCH SHORING ETC AS REQUIRED.
a. PRESTART 11. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THESE DRAWINGS,
b. EARTHWORKS - FINAL STRIPPING OF TOPSOIL, INSTALLATION OF SEDIMENT AND EROSION THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN CONFIRMATION THAT
CONTROL MEASURES UNSUITABLE GROUND WORKS CAN COMMENCE.
c. SIDE AND CUT OFF DRAINS 12. CONTRACTOR TO PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL CONSTRUCTED WORKS
IN ACCORDANCE WITH LOCAL GOVERNMENT REQUIREMENTS. UNLESS OTHERWISE
d. STORMWATER PIPE LAID ON BEDDING PRIOR TO BACKFILL ADVISED BY RECOR CONTRACTOR TO NOTE COUNCILS ADAC REQUIREMENTS.
e. STORMWATER TRENCH BACKFILLED PRIOR TO PAVEMENT PLACEMENT 13. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH RELEVANT APPROVALS.
f. STORMWATER STRUCTURE BASE SLABS 14. CONTRACTOR TO ALLOW TO LIASE/CO-ORDINATE WITH ELECTRICAL, LANDSCAPE AND
g. SEWER RETICULATION OTHER SERVICE CONTRACTORS THROUGHOUT CIVIL CONSTRUCTION.
h. WATER RETICULATION 15. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR DEMOLITION WORKS
COMMENCING ON SITE.
i. PAVEMENT SUBGRADE
16. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS AND
j. PAVEMENT REINFORCING SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O.
k. PAVEMENT PRIOR TO SEALING (PRESEAL) 17. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING PROPERTIES AND
l. RETAINING WALL FOOTING REINFORCING COUNCIL ROADS AND VERGES PRIOR TO COMMENCEMENT OF ANY WORKS ON SITE.
m. RETAINING WALL BLOCKWORK PRIOR TO CORE FILL 18. CONTRACTOR TO CLEAR AND GRUB ALL VEGETATION ON SITE AS IDENTIFIED IN THE
APPROVED VEGETATION MANAGEMENT PLAN. CONTRACTOR TO ENSURE ALL TREE ROOTS
n. STEEL REINFORCEMENT OF CONCRETE STRUCTURES AND STUMPS ARE COMPLETELY REMOVED AND BACKFILLED TO LEVEL 1 SUPERVISION.
o. PRACTICAL COMPLETION CONTRACTOR TO ALLOW TO MULCH ALL CLEARED VEGETATION AND STOCKPILE ON SITE
OR REMOVE FROM SITE AS DIRECTED.
p. ON MAINTENANCE
19. DRAWINGS TO BE READ IN CONJUNCTION WITH OTHER PROJECT
q. OFF MAINTENANCE CONSULTANTS/CONTRACTORS DRAWINGS.
r. ANY OTHER INSPECTION AS SPECIFIED BY LOCAL COUNCIL (REFER DEVELOPMENT 20. CONTRACTOR TO PREPARE AND HAVE APPROVED BY RELEVANT AUTHORITY: ROAD
APPROVAL) OPENING PERMIT AND TRAFFIC MANAGEMENT PLAN FOR ALL WORKS WITHIN COUNCIL
s. ANY OTHER INSPECTION AS REQUIRED BY UNITY WATER AND WHERE RELEVANT TO THEIR ROAD RESERVES. CONTRACTOR TO ALLOW FOR ALL COSTS ASSOCIATED WITH
CERTIFICATION SCHEME IMPLEMENTATION OF THE TMP. LOCALITY PLAN
21. ALL WORKS TO BE COMPLETED IN ACCORDANCE WITH ALL LOCAL AUTHORITY APPROVALS NOT TO SCALE
RECEIVED FOR THE PROJECT
GENERAL NOTES
22. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH OPW APPROVALS BY
1. ALL DIMENSIONS SHOWN ARE IN METERS UNLESS OTHERWISE SHOWN. COUNCIL.
2. ALL SETOUT ON SITE IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR 23. NO WORKS ARE TO BE UNDERTAKEN ON LAND OUTSIDE OF THE SITE BOUNDARY WITHOUT
TO ALLOW FOR ALL MEANS NECESSARY TO ACCURATELY SETOUT THE WORKS. FORMAL APPROVAL BY THE OWNER/CUSTODIAN OF THAT LAND INCLUDING BUT NOT
3. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT SPECIFICATIONS AND LIMITED TO PRIVATE PROPERTY, ROAD RESERVE, PARKS/OPENSPACE, EASEMENTS.
WHERE FURTHER DETAILS ARE REQUIRED THE CONTRACTOR SHALL REFER TO NOOSA 24. THE CONTRACTOR SHALL HAVE AN APPROVED SET OF CONSTRUCTION DRAWINGS AND
SHIRE COUNCIL DEVELOPMENT GUIDELINES, LOCAL WATER AUTHORITY GUIDELINES, APPROVALS ON SITE AT ALL TIMES.
ASSOCIATED STANDARD DRAWINGS AND SPECIFICATIONS U.N.O.
25. ALL WATER AND SEWER RETICULATION WORKS TO BE CONSTRUCTED IN ACCORDANCE
4. SHOULD ANY OF THE CONSTRUCTED WORKS BE CONSTRUCTED OUTSIDE OF THE WITH THE SEQ WATER SUPPLY AND SEWERAGE DESIGN AND CONSTRUCTION CODE (2013).
TOLERANCES SPECIFIED WITHIN THE PROJECT SPECIFICATION AND LOCAL AUTHORITY
REQUIREMENTS, THE CONTRACTOR WILL RECTIFY AT THEIR COST INCLUSIVE OF ANY
DRAWING SCHEDULE
ADDITIONAL COSTS INCURRED BY RECOR. DRAWING NUMBER DRAWING TITLE
5. EXISTING SERVICES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS SUCH THEIR C01 COVER SHEET AND LOCALITY PLAN
ACCURACY CANNOT BE GUARANTEED. NO RESPONSIBILITY IS TAKEN BY RECOR OR THE
PRINCIPAL FOR THE ACCURACY AND COMPLETENESS OF THIS INFORMATION. IT IS THE C02 EXISTING SITE SERVICES PLAN
RESPONSIBILITY OF THE CONTRACTOR TO ACCURATELY ESTABLISH THE LOCATION AND
LEVEL OF ALL EXISTING SERVICES PRIOR THE COMMENCEMENT OF ANY WORKS. ANY C10 EROSION & SEDIMENT CONTROL PLAN
DISCREPANCIES SHALL BE REPORTED TO THE SUPERINTENDENT. CONTRACTOR TO
LOCATE AND PROTECT SERVICES AS REQUIRED DURING PROPOSED WORKS. C11 EROSION & SEDIMENT CONTROL DETAILS
6. THE CONTRACTOR IS TO CHECK THROUGH LOCATING, POTHOLING AND SURVEY ALL C20 BULK EARTHWORKS PLAN
CRITICAL CONNECTION POINTS FOR ALL CIVIL WORKS SHOWN ON THE DRAWINGS
INCLUDING ANY POTENTIAL EXISTING SERVICES CLASHES PRIOR TO COMMENCEMENT OF C21 BULK EARTHWORK SECTIONS
CIVIL WORKS. CONTRACTOR TO IMMEDIATELY REPORT ANY DISCREPANCIES TO RECOR
AND AWAIT FORMAL DIRECTION PRIOR TO COMMENCING CIVIL WORKS.
C30 ROADS AND DRAINAGE LAYOUT PLAN
7. ON COMPLETION OF SERVICES INSTALLATION, ALL DISTURBED AREAS SHALL BE C31 DRIVEWAY SECTIONS
RESTORED TO ORIGINAL LEVEL, INCLUDING KERBS, FOOTPATHS, CONCRETE AREAS,
GRAVEL AREAS, GRASSED AREAS AND ROAD PAVEMENTS. C32 STORMWATER SECTION
8. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO C33 STORMWATER CATCHMENT PLAN
AUTHORITY/COUNCIL'S INFRASTRUCTURE. SUCH REPAIR OR REINSTATEMENT TO BE
CARRIED OUT IMMEDIATELY TO THE SATISFACTION OF INFRASTRUCTURE
OWNER/MANAGER / AUTHORITY/COUNCIL.
CLIENT DETAILS: PROJECT ADDRESS: APPROVED BY: PROJECT NAME:
6 WYANDRA STREET, NOOSA HEADS
CAPITAL PRUDENTIAL TITLE: STATUS:
D 21/10/2022 REISSUED FOR APPROVAL MVP BP NW 6 WYANDRA STREET GENERAL NOTES FOR APPROVAL
© ABN 89 647 469 707 C
B
11/07/2022 ISSUE FOR OPW
24/06/2022 UPDATE ISSUE FOR MCU
BP
BP
NW
NW
NW
NW NOOSA HEADS NATHAN WAGSTAFF NOT FOR CONSTRUCTION
75 NOOSA DRIVE RPEQ: 20693
A 30/03/2022 ISSUED FOR MCU BP NW NW SCALE:
NOOSA HEADS, QLD 4567 CPEng
+61 7 5211 1003 REV DATE DESCRIPTION DWN CHK APP
N.T.S DATE: 28/10/2022
DRAWING NUMBER: PROJECT NUMBER: SHEET REV:
SIZE:
RECORCONSULTING.COM REVISIONS
DO NOT SCALE, IF IN DOUBT ASK
C01 20220078 A1 D
Section 16
N
NOTE:
1. FOR GENERAL NOTES REFER DWG No. C01, WHICH IS TO BE REQUESTED AND VIEWED PRIOR
TO COMMENCEMENT OF CONSTRUCTION IF NOT SUPPLIED.
2. THE CONTRACTOR WILL MAKE HIMSELF FULLY AWARE OF THE EXISTING FEATURES OF THIS
SITE AND ENSURE ANY ADDITIONAL WORKS NOT SHOWN ON THIS PLAN ARE INCLUDED IN THE
CONTRACT.
rant
24.70 24.79
3. LOCATION AND DEPTH OF ANY EXISTING SERVICES IDENTIFIED BASED ON SURVEY, DBYD
Hyd
AND COUNCIL RECORDS. IT IS THE CONTRACTORS RESPONSIBILITY TO CONFIRM ACTUAL
CLEAR AND GRUB ALL LOCATION AND DEPTH PRIOR TO CARRYING OUT ANY EXCAVATION OR TRENCHING WORKS.
Fire
24.68 VEGETATION WITHIN SITE
Sewer Manhole BOUNDARY
4. CONTRACTOR TO LOCATE AND PROTECT ALL EXISTING SERVICES ON SITE AND WITHIN
25.41 25.46 VERGE PRIOR TO COMMENCEMENT OF WORKS.
25
.77 5. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR TO ANY DEMOLITION WORKS
COMMENCING ON SITE.
24.7 26.35
3 TREE 0.1 6. ALL VEGETATION WITHIN THE LIMIT OF WORKS TO BE CLEARED, MULCHED, GRUBBED AND
50805
5
REMOVED FROM SITE IN ACCORDANCE WITH APPROVED VEGETATION CLEARING PLAN (BY
.2
24
25
26.83
24.00 .69
TREE 0.151004 27.0 Sewer OTHERS) OR IF SCHEDULED STOCKPILE FOR USE BY LANDSCAPER.
24.10 2
LIL 0.1 Line In
7
27.07 dicative
.5
3
50905
.7
26
26.60
9
Only (N
25
n
.2
rb
26.22
25
ot Loc
tume
26.69
of Ke
25.
52 26.09 ated b 7. CONTRACTOR TO LOCATE ALL EXISTING UTILITIES ON SITE AND MAKE SUITABLE
5
27.
y
.3
71 86 Survey)
27. ARRANGEMENTS TO HAVE DISCONNECTED PRIOR TO DEMOLITION WORKS BEGINNING.
26
2
.8
of B i
3
24
.4
26
24.17
8. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THIS DRAWING, THE
0
2
2
Back
41
.7
.9
24. 4
26.
26
25
26.41 CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN CONFIRMATION THAT WORKS
Deck
Edge
CAN COMMENCE.
4
.6
Telstra
26
25 26.
.84 45 9. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING PROPERTIES AND
Pit
6
COUNCIL ROADS AND VERGES PRIOR TO COMMENCEMENT OF ANY WORKS ON SITE.
.4
23.57
25
4
.5
23.
10. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS, RETAINING
24
67
WALLS AND SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O.
26
.50 11. WHERE NECESSARY, CONTRACTOR SHALL OBTAIN ALL NECESSARY APPROVALS TO CARRY
0
OUT SERVICES RELOCATION OR ALTERATIONS.
.5
9
26
.4
27.
27
Deck Stairs
6 4
23.
DEMOLISH AND REMOVE 69
71 3
.50
23.22
Ramp
0
EXISTING DRIVEWAY 23.3 0 NOTE:
23
NC
POI
23.27
.98
5
.0
EXCEPT WHERE NOTED ON PLAN AND ASSOCIATED DESIGN DRAWINGS, ALL
2
25
23.
.9
73
23
IN-GROUND SERVICES WITHIN THE PROPERTY BOUNDARY INCLUDING BUT NOT
41 LIMITED TO: STORMWATER DRAINAGE, SEWERAGE, WATER, GAS, ELECTRICAL
23.
23
AND COMMUNICATIONS TO BE SAFELY BE DISCONNECTED, REMOVED FROM
8
9
.5
.65
.7
24
SITE AND CAPPED OFF AT SITE BOUNDARY. CONTRACTOR TO ARRANGE ALL
23
6
.1
26.1
26
NECESSARY APPLICATIONS AND PERMITS WITH THE RELEVANT AUTHORITIES.
Floor Level
9
74
.0
8
SERVICES TO BE CAPPED IN ACCORDANCE WITH RELEVANT SERVICE
23.
2
27
0
.1
0
27
PROVIDER SPECIFICATIONS AND STANDARD DETAILS
RL26.19
23.
24
23.00
.35
36
24.
1
.34
.1
25
23
25.25
.63
22.68
Deck
24
Co
.06
nc
25
ret
59
23. 25.
19
e
23.8
23.94
Dr
.23
6
.9
TBM (Screw in Kerb) .57
ive
26
25
7
22 3
RL22.58 AHD 26.5
wa
22.59
25
5
y
26.85
.3
23.7
Stairs
23
Gully Pit 55
5
.
24.
8
21
.2
22.36
Garage Level
24
22.49 1
.35
.3
4
22
25
RL25.33
.6
24
0
26
.47
26.
3
.4
24.9
25
37
22.25 22.36
23
66
25
.7
.
07
22
.15
25.
5
04
24.80
.
23
DEMOLISH AND REMOVE FROM 24.
94
3
SITE ALL EXISTING STRUCTURES,
.1
22.21
25
23
25.92
22.10
7
PAVING AND RETAINING WALLS 22.97
.1
.
25
26
23
.65
5
.6 4.7
2
LOCATE AND CAP OFF EXISTING SEWER
8
.4
9
22.12
22
23.72 CONNECTION DURING EARTHWORKS
24
22.0
0 22.08 23
80
.0 23.97
Valve 6
.
Po
24
.08
22 we 23.37 CAP
8
r p
.7
24
21.98
it 22.09 ole Telstra P 24.7 25.20
y P .98
3 8
l it 24.4 .51
Gul 21
22
25
25
Fire Hydrant 25.
25 5
22
.0
Back o 37
.1
.42
.4
0
f Kerb
5
31
22. Edge o
f Bitum 23.58
en 24.82
23
.46 Sewer Manhole
24.95
24.8
5
CLIENT DETAILS: PROJECT ADDRESS: APPROVED BY: PROJECT NAME:
6 WYANDRA STREET, NOOSA HEADS
CAPITAL PRUDENTIAL TITLE: STATUS:
D 21/10/2022 REISSUED FOR APPROVAL MVP BP NW 6 WYANDRA STREET EXISTING SITE SERVICES FOR APPROVAL
© ABN 89 647 469 707 C
B
11/07/2022 ISSUE FOR OPW
24/06/2022 UPDATE ISSUE FOR MCU
BP
BP
NW
NW
NW
NW NOOSA HEADS NATHAN WAGSTAFF PLAN NOT FOR CONSTRUCTION
75 NOOSA DRIVE RPEQ: 20693
A 30/03/2022 ISSUED FOR MCU BP NW NW SCALE:
NOOSA HEADS, QLD 4567 CPEng
+61 7 5211 1003 REV DATE DESCRIPTION DWN CHK APP
1:100 DATE: 28/10/2022
DRAWING NUMBER: PROJECT NUMBER: SHEET REV:
SIZE:
RECORCONSULTING.COM REVISIONS
DO NOT SCALE, IF IN DOUBT ASK
C02 20220078 A1 D
Section 17
SEDIMENT CONTROL
1. ALL SEDIMENT AND EROSION CONTROL MEASURES TO BE IN ACCORDANCE WITH INTERNATIONAL EROSION
CONTROL ASSOCIATION (IECA) AUSTRALIA GUIDELINES AND THE SPECIFICATIONS.
N 1. SEDIMENT AND EROSION CONTROL DETAILS SHOWN ARE MINIMUM REQUIREMENTS. IT IS THE CONTRACTORS
RESPONSIBILITY TO INSTALL ADDITIONAL CONTROL MEASURES AS DEEMED NECESSARY THROUGHOUT
CONSTRUCTION.
2. THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL SEDIMENT CONTROL DEVICES IN A FUNCTIONAL ORDER AND
REPLACE ALL BLOCKED SEDIMENT DEVICES AS REQUIRED UNTIL SUCCESSFUL OFF MAINTENANCE OF WORKS.
3. CONSTRUCTION OF ALL SEDIMENT MANAGEMENT DEVICES TO THE SATISFACTION OF THE SUPERINTENDENT.
SHALL BE COMPLETED AND EFFECTIVE PRIOR TO:
a. STRIPPING OF TOPSOIL AND GRASS.
b. BULK EARTHWORKS TO THE SITE.
rant
24.70 24.79 c. SERVICES INSTALLATION.
d. PAVEMENT CONSTRUCTION
Hyd
5. ALL SEDIMENT MANAGEMENT MEASURES ARE TO REMAIN IN PLACE UNTIL INSTRUCTION IS RECEIVED IN WRITING
FROM THE SUPERINTENDENT TO REMOVE ALL OR PART OF THE SILT CONTROL APPLICATIONS.
Fire
24.68 6. THE BULK EARTHWORKS AND SEDIMENT CONTROL LAYOUT PLAN SHALL BE READ IN CONJUNCTION WITH THE
Sewer Manhole APPROVED DRAWINGS.
25.46
25
25.41 .46
41 7. PRIOR TO COMMENCEMENT OF CONSTRUCTION APPROVAL IS TO BE OBTAINED FROM THE SUPERINTENDENT FOR
+24.41
102°02
+25.15
THE LOCATION OF THE SITE ACCESS POINT AND WASH DOWN AREA WHICH ARE TO BE MAINTAINED THROUGHOUT
25
.7 7
|S|
'00" RP139776 THE CONSTRUCTION PERIOD.
20.115
+25.12
24.7 2266.3
.355 8. IF SEDIMENT AND EROSION CONTROL DEVICES HAVE BEEN FOUND TO BE DIFFERENT OR FAILED IN SERVICE,
3 TREE 0.1
50805 CORRECTIVE ACTION IS TO BE UNDERTAKEN IMMEDIATELY WHICH MAY INCLUDE AMENDMENTS' ADDITIONS TO THE
5
.2
.55
24
25
2266.8
.833 ORIGINAL APPROVED EROSION CONTROL PLANS. SUCH AMENDMENTS ARE TO BE APPROVED BY SUPERINTENDENT,
Sewer
3 25
.69
TREE 0.151004
+25.55
24.00 27.0
Line In
.7 +
24.10 2 IF DEEMED NECESSARY AND RELEVANT.
+24.10
27.07 LLIIL
7
L 00
.15.1 dicative
.5
0950509
26
26.60
9
05 27.5 Only (N
25
n
27.
.2
rb
26.22
+25.90
25
o
tume
26.69
t Loca
e
25.
5
+24.75
52 26.09
ted by
K
+27.10
2277..86
5
9. OVERALL
.3
71 86 Survey)
27.
26
2
Telstra ck of
.8
a. TEMPORARY DRAINAGE CONTROL FLOWS SHOULD BE DIVERTED AROUND THE WORK SITE WHERE POSSIBLE.
of B i
3
24
.4
26
24.17
b. ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND BE OPERATIONAL BEFORE
0
2
2
41
.7
.9
24. 4
2266. .41
26
25
COMMENCING UP-SLOPE EARTHWORKS.
a
26.41
B Deck
Edge
c. IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED SURFACES TO BE EITHER MULCHED,
4
.6
COVERED WITH EROSION CONTROL BLANKETS OR TURFED IF EARTHWORKS ARE EXPECTED TO BE DELAYED
26
25 26.
.84 45
PROVIDE STABILISED Pit FOR MORE THAN 14 DAYS.
+26.00
6
+25.65
.4
+25.55
23.57
25
CONSTRUCTION ENTRY/EXIT
4
2|4S|
SEDIMENT FENCE
.5
23.
67
0" 10. FOR SEDIMENT FENCE STANDARD DETAIL AND SPECIFICATION REFER TO NOOSA SHIRE COUNCIL STANDARD
+25.55
26 DRAWING ESC-04 AND ESC-05, OR ALTERNATIVELY INTERNATIONAL EROSION CONTROL ASSOCIATION
26.150 .50
12°02'0
AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWINGS SF-01 AND SF-02 SEDIMENT FENCE.
0
.5
9
26
.4
27.49
27.
|S|
27
Deck Stairs
TEMPORARY CONSTRUCTION ENTRY/EXIT
46
+26.00
11. FOR CONSTRUCTION ENTRY / EXIT STANDARD DETAIL AND SPECIFICATION REFER TO NOOSA SHIRE COUNCIL
Ramp+25.90
23.
23.22
69
0 7 13 STANDARD DRAWING ESC-01, OR ALTERNATIVELY INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA
23.3
0
0.5 (IECA) BEST PRACTICES STANDARD DRAWINGS EXIT-01 AND EXIT-02 CONSTRUCTION EXIT - ROCK PAD
23
NC
|S|
POI
23.27
.98
5
(CONSTRUCTION SITES ONLY), EXIT-03 - ROCK PADS FOR BUILDING SITES AND EXIT-04 AND EXIT-05 CONSTRUCTION
.0
2
25
23.
.9
73 EXIT - VIBRATION GRID.
23
+25.65
41
23.
23
FILTER SOCK SEDIMENT TRAP
8
9
.5
.65
.7
24
23
6
|S|
.1
26.1
12. FOR FILTER SOCK SEDIMENT TRAP STANDARD DETAIL AND SPECIFICATION REFER TO INTERNATIONAL EROSION
26
Floor Level
9
74 CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWING ESC-03 KERB INLET SEDIMENT
.0
8
23.
2
+24.75
27
00
.1
27.12
TRAPS.
27
RL26.19
+24.95
23.
+25.55
24
23.00
.35
|S|
REVEGETATION
'00"
3 6
24. 13. FOR REVEGETATION STANDARD SPECIFICATION REFER TO INTERNATIONAL EROSION CONTROL ASSOCIATION
1
PROVIDE FILTER SOCK
.34
.1
30.175
25
AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWING R-01 REVEGETATION GENERAL.
23
SEDIMENT TRAP TO
192°02
25.25
.63
22.68
Deck
24
DOWNSTREAM SAG INLET
|S|
Co
OPERATION AND MAINTENANCE
.06 137
nc
25
14. IN ACCORDANCE WITH NC ESC GUIDELINES, ALL ESC MEASURES SHALL BE INSPECTED:
ret
59
23. 25.
19
RP160425
e
26 +25.55
· AT LEAST DAILY (WHEN WORK IS OCCURRING ON SITE) OR WEEKLY (WHEN WORK IS NOT OCCURRING ON SITE)
+26.00
23.8
23.94
Dr
.23
6
· WITHIN 24 HOURS OF EXPECTED RAIN; AND
.9
TBM (Screw in Kerb)
+25.55
.57
ive
25
7
|S|
22 3 · WITHIN 18 HOURS OF A RAINFALL EVENT (I.E. AN EVENT OF SUFFICIENT INTENSITY AND DURATION TO MOBILISE
+25.65
RL22.58 AHD 26.5
wa
22.59
+26.00
SEDIMENT ON SITE).
25
5
y
26.85
.3
23.7
Stairs
23
Gully Pit 5 16. IN ACCORDANCE WITH NC ESC GUIDELINES, MAINTENANCE OF ESC MEASURES SHALL OCCUR IN ACCORDANCE
5
5
.2
24.
8
.2
1
22.36
Garage Level WITH THE FOLLOWING TABLE:
24
22.49
1
.35
.3
4
|S|
22
25
RL25.33
.6
26.64
24
0
+25.15
26
MAINTENANCE SCHEDULE
.47
26.
.93
.4
25
+25.25
37
54
TIMEFRAME FOR COMPLETION
+25.22
22.25 22.36 ESC MEASURES MAINTENANCE TRIGGER
OF MAINTENANCE
23
6
25
.6
.7
07
22
SEDIMENT BASIN WHEN SETTLED SEDIMENT EXCEEDS THE WITHIN 7 DAYS OF THE
.15
25.
5
3|S2| 5.69
25
4
(WHERE UTILISED) VOLUME OF THE SEDIMENT STORAGE INSPECTION
.0
24.80
23
ZONE (SEE COUNCIL'S SEDIMENT BASIN
7°0 |S0
DESIGN GUIDELINES
2244..94
+25.64
94 PROVIDE SEDIMENT FENCE TO
3
2'0 |
.1
OTHER ESC MEASURES THE REMAINING CAPACITY OF ESC BY THE END OF THE DAY
22.21
DOWNSTREAM BOUNDARY
25
MEASURES IS BELOW 50%
3
25.92
22.10
7
.2
22.97
.1
26.17
0"
25
26
23 REPORTING
.65
17. CONTRACTOR IS TO PROVIDE AN UPDATED PROGRAM OF ESC MAINTENANCE AND CONTROL OF ALL STAGES OF
5
.6 4.7
WORK FOR APPROVAL BY THE SUPERINTENDENT.
2
8
|S|
.4
9
22.12
22
23.72 24.69
24
|S|
22.0
0 22.08 23 Section 18
|S|
0
.06 23.97
Valve
.8
|S| 24.80
Po
24
08
+24.60
22. we 23.37 |S|
282°02 CAP
+25.40
78
r p 24.7|S8
.
24
21.98 '00" |
+25.30
it 22.09 ole Telstra P 24.7 |S
25.2
| 0
y P .98
LEGEND
l it 16.090 24.4
3 8
.51
Gul 21
22
2255.51
25
Fire Hydrant 25. SEDIMENT AND EROSION CONTROL:
25 5
22
.00
Back o 37
.1
.4
.42
f Kerb CONTRACTOR TO ALLOW FOR PROVISION OF ALL
5
|S| SEDIMENT FENCING
31 REQUIRED SEDIMENT AND EROSION CONTROL DEVICES
22. Edge o
f Bitum
en
23.58 25 IN ACCORDANCE WITH IECA AND NOOSA SHIRE COUNCIL
24.82 POLICIES AND GUIDELINES
FILTER SOCK SEDIMENT TRAP
23
.46 Sewer Manhole
24.95
CONSTRUCTION ENTRY/EXIT
24.8
5
CLIENT DETAILS: PROJECT ADDRESS: APPROVED BY: PROJECT NAME:
6 WYANDRA STREET, NOOSA HEADS
CAPITAL PRUDENTIAL TITLE: STATUS:
6 WYANDRA STREET EROSION SEDIMENT FOR APPROVAL
© ABN 89 647 469 707
B 28/10/2022 REISSUED FOR APPROVAL MVP BP NW NOOSA HEADS NATHAN WAGSTAFF CONTROL PLAN NOT FOR CONSTRUCTION
75 NOOSA DRIVE RPEQ: 20693
A 11/07/2022 ISSUED FOR OPW BP NW NW SCALE:
NOOSA HEADS, QLD 4567 CPEng
+61 7 5211 1003 REV DATE DESCRIPTION DWN CHK APP
1:100 DATE: 28/10/2022
DRAWING NUMBER: PROJECT NUMBER: SHEET REV:
SIZE:
RECORCONSULTING.COM REVISIONS
DO NOT SCALE, IF IN DOUBT ASK
C10 20220078 A1 B
Section 19
500 - 600mm
1.5m STAR
PICKETS
AT MAX. 2.5m CENTRES
SELF-SUPPORTING
GEOTEXTILE
OW
1 METER MAX. STAR PICKETS DIRECTION OF FL
DROP INLET
WITH GRATE
ON SOIL, 150mm x 100mm
WIRE OR STEEL MESH
(14 GAUGE x 150mm TRENCH WITH
OPENINGS) WHERE GEOTEXTILE COMPACTED BACKFILL
PROVIDE WASH WATER FOR IS NOT SELF-SUPPORTING AND ON ROCK, SET INTO
TIMBER SLEEPER OR METAL TRUCKS EXITING SITE SURFACE CONCRETE
600mm MIN.
GRID 100mm HIGH AND WOVEN GEOTEXTILE
SECTION DETAIL
SPACED AT 300mm CTS MIN LENG
TH 10m
BERM 300 HIGH MIN
CONSTRUCTION SITE
STAR PICKET STABILISE STOCKPILE SURFACE
MIN. 1.5m
FITTED WITH EARTH BANK 20m MAX.
EXISTING ROADWAY 2:1
SAFETY CAP AX.) SLO FLOW
E (M PE
FLOW S LOP (MA
GEOTEXTILE FABRIC SANDBAGS WOVEN GEOTEXTILE 2:1 X.) STAR PICKETS AT
MAX. 2.5m SPACINGS
RUNOFF TYPICAL
50-75mm GRAVEL BED WATER WITH
FLOW
MIN 200mm THICK SEDIMENT FENCE
WATERWAY SEDIMENT
RUNOFF FROM PAD DIRECTED PLAN
TO SEDIMENT TRAP STOCKPILE CONSTRUCTION NOTES:
EXCAVATION
TEMPORARY CONSTRUCTION VEHICLE EXIT FILTERED
1. PLACE STOCKPILES MORE THAN 2 (PREFERABLY 5) METRES FROM EXISTING
VEGETATION, CONCENTRATED WATER FLOW, ROADS AND HAZARD AREAS.
SCALE: N.T.S. WATER
GEOTEXTILE
EARTH BANK EMBEDDED 150mm 2. CONSTRUCT ON THE CONTOUR AS LOW, FLAT, ELONGATED MOUNDS. DIRECTION
DISTURBED 1.5m STAR PICKETS
INTO GROUND AREA OF FLOW AT MAX. 2.5m
3. WHERE THERE IS SUFFICIENT AREA, TOPSOIL STOCKPILES SHALL BE LESS CENTRES
FOR DROP INLETS AT NON-SAG POINTS,
THAN 2 METRES IN HEIGHT.
SANDBAGS, EARTH BANK OR EXCAVATION
USED TO CREATE ARTIFICIAL SAG POINT
4. WHERE THEY ARE TO BE PLACE FOR MORE THAN 10 DAYS, STABILISE
TIMBER SPACER KERB-SIDE GEOTEXTILE INLET FILTER CONSTRUCTION NOTES: FOLLOWING THE APPROVED ESCP OR SWMP TO REDUCE THE C-FACTOR TO
TO SUIT INLET 1. FABRICATE A SEDIMENT BARRIER MADE FROM GEOTEXTILE OR STRAW BALES. LESS THAN 0.10.
2. PICKET SPACING TO BE A MAXIMUM 1.0m CENTRES. 5. CONSTRUCT EARTH BANKS ON THE UPSLOPE SIDE TO DIVERT WATER AROUND
STOCKPILES AND SEDIMENT FENCES 1 TO 2 METRES DOWNSLOPE.
3. IN WATERWAYS, ARTIFICIAL SAG POINTS CAN BE CREATED WITH SANDBAGS UNDISTURBED
OR EARTH BANKS AS SHOWN IN THE DRAWING. STOCKPILES AREAS
SCALE N.T.S
GRAVEL-FILLED WIRE 4. DO NOT COVER THE INLET WITH GEOTEXTILES UNLESS THE DESIGN IS
MESH OR GEOTEXTILE ADEQUATE TO ALLOW FOR ALL WATERS TO BYPASS IT.
"SAUSAGE"
OVERFLOW TIMBER SPACER
GEOTEXTILE INLET FILTER A
RUNOFF SCALE N.T.S
WATER WITH TO SUIT
SEDIMENT
GRADIENT OF
DRAIN 1% TO 5% CAN BE CONSTRUCTED ALL BATTER
WRAP FILTER WITH OR WITHOUT SEDIMENT FENCE CONSTRUCTION NOTES:
SEDIMENT GRADES 2(H):1(V)
CLOTH OVER GRATE CHANNEL MAX. 1. CONSTRUCT SEDIMENT FENCES AS CLOSE AS POSSIBLE TO BEING PARALLEL
GRAVEL-FILLED WIRE FILTERED WATER DIRECTION O
F FLOW TO THE CONTOURS OF THE SITE, BUT WITH SMALL RETURNS AS SHOWN IN THE
MESH OR GEOTEXTILE DRAWING TO LIMIT THE CATCHMENT AREA OF ANY ONE SECTION. THE
300mm MIN.
"SAUSAGE" CATCHMENT AREA SHOULD BE SMALL ENOUGH TO LIMIT WATER FLOW IF
MESH & GRAVEL INLET FILTER CONSTRUCTION NOTES: CONCENTRATED AT ONE POINT TO 50 LITRES PER SECOND IN THE DESIGN
1. INSTALL FILTERS TO KERB INLETS ONLY AT SAG POINTS. STORM EVENT, USUALLY THE 10-YEAR EVENT.
2m MIN
150mm MIN
2. FABRICATE A SLEEVE MADE FROM GEOTEXTILE OR WIRE MESH LONGER THAN 2. CUT A 150mm DEEP TRENCH ALONG THE UPSLOPE LINE OF THE FENCE FOR
NOTE: ONLY TO BE USED AS TEMPORARY THE BOTTOM OF THE FABRIC TO BE ENTRENCHED.
THE LENGTH OF THE INLET PIT AND FILL IT WITH 25mm TO 50mm GRAVEL.
BANK WHERE MAXIMUM UPSLOPE LENGTH
IS 80 METRES. 3. DRIVE 1.5m LONG STAR PICKETS INTO GROUND AT 2.5m INTERVALS (MAX.) AT
3. FORM AN ELLIPTICAL CROSS-SECTION ABOUT 150mm HIGH x 400mm WIDE.
DIVERSION DRAIN CONSTRUCTION NOTES: THE DOWNSLOPE EDGE OF THE TRENCH. ENSURE ANY STAR PICKETS ARE
WRAP FILTER
4. PLACE THE FILTER AT THE OPENING LEAVING AT LEAST A 100mm SPACE RUNOFF 1. BUILD WITH GRADIENTS BETWEEN 1% AND 5%. FITTED WITH SAFETY CAPS.
CLOTH OVER GRATE
BETWEEN IT AND THE KERB INLET. MAINTAIN THE OPENING WITH SPACER WATER WITH
BLOCKS. SEDIMENT 2. AVOID REMOVING TREES AND SHRUBS IF POSSIBLE - WORK AROUND THEM. 4. FIX SELF-SUPPORTING GEOTEXTILE TO THE UPSLOPE SIDE OF THE POSTS
ENSURING IT GOES TO THE BASE OF THE TRENCH. FIX THE GEOTEXTILE WITH
5. FORM A SEAL WITH THE KERB TO PREVENT SEDIMENT BYPASSING THE FILTER. 3. ENSURE THE STRUCTURES ARE FREE OF PROJECTIONS OR OTHER WIRE TIES OR AS RECOMMENDED BY THE MANUFACTURER. ONLY USE
IRREGULARITIES THAT COULD IMPEDE WATER FLOW. GEOTEXTILE SPECIFICALLY PRODUCED FOR SEDIMENT FENCING. THE USE OF
FILTERED
6. SANDBAGS FILLED WITH GRAVEL CAN SUBSTITUTE FOR THE MESH OR SHADE CLOTH FOR THIS PURPOSE IS NOT SATISFACTORY.
WATER
GEOTEXTILE PROVIDING THEY ARE PLACED SO THAT THEY CAN FIRMLY ABUT 4. BUILD THE DRAINS WITH CIRCULAR, PARABOLIC OR TRAPEZOIDAL
EACH OTHER AND SEDIMENT-LADEN WATERS CANNOT PASS BETWEEN. CROSS-SECTIONS, NOT "V" SHAPED. 5. JOIN SECTIONS OF FABRIC AT A SUPPORT POST WITH A 150mm OVERLAP.
6. BACKFILL THE TRENCH OVER THE BASE OF THE FABRIC AND COMPACT IT
MESH & GRAVEL INLET FILTER GEOTEXTILE INLET FILTER TYPE B 5. ENSURE BANKS ARE PROPERLY COMPACTED TO PREVENT FAILURE.
THOROUGHLY OVER THE GEOTEXTILE.
SCALE N.T.S SCALE N.T.S
6. COMPLETE PERMANENT OR TEMPORARY STABILISATION WITHIN 10 DAYS OF
CONSTRUCTION.
SEDIMENT FENCE
DIVERSION DRAIN SCALE: N.T.S.
SCALE N.T.S
CLIENT DETAILS: PROJECT ADDRESS: APPROVED BY: PROJECT NAME:
6 WYANDRA STREET, NOOSA HEADS
CAPITAL PRUDENTIAL TITLE: STATUS:
6 WYANDRA STREET EROSION SEDIMENT FOR APPROVAL
© ABN 89 647 469 707
B 28/10/2022 REISSUED FOR APPROVAL MVP BP NW NOOSA HEADS NATHAN WAGSTAFF CONTROL DETAILS NOT FOR CONSTRUCTION
75 NOOSA DRIVE RPEQ: 20693
A 11/07/2022 ISSUED FOR OPW BP NW NW SCALE:
NOOSA HEADS, QLD 4567 CPEng
+61 7 5211 1003 REV DATE DESCRIPTION DWN CHK APP
N.T.S. DATE: 28/10/2022
DRAWING NUMBER: PROJECT NUMBER: SHEET REV:
SIZE:
RECORCONSULTING.COM REVISIONS
DO NOT SCALE, IF IN DOUBT ASK
C11 20220078 A1 B