RFI - RECOR Preliminary Stormwater Management Report - 20220078
Original PDF page 12, section 1. The text section number identifies this passage in the reader.
3. Downstream pits within the road reserve are to be protected through filter socks or similar.
4. Diversion of upstream catchments around any exposed areas through the use of diversion drains around the
site.
4.2. Operational Phase
The development consists of a small lot duplex consistent in character with the existing residential dwelling. The
proposed development is not considered to significantly alter the pollutant generation potential of the site, and
therefore no additional stormwater quality treatment is proposed for the development.
Project number 20220078
File RECOR Preliminary Stormwater Management Report - 20220078, 2022-11-11 Page 12 of 16
Revision 2
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.