Original source · versioned page text
RFI - RECOR Preliminary Stormwater Management Report - 20220078
Original PDF page 17, section 2. The text section number identifies this passage in the reader.
|S|
0
.06 23.97
Valve
.8
|S| 24.80
Po
24
08
+24.60
22. we 23.37 |S|
282°02 CAP
+25.40
78
r p 24.7|S8
.
24
21.98 '00" |
+25.30
it 22.09 ole Telstra P 24.7 |S
25.2
| 0
y P .98
LEGEND
l it 16.090 24.4
3 8
.51
Gul 21
22
2255.51
25
Fire Hydrant 25. SEDIMENT AND EROSION CONTROL:
25 5
22
.00
Back o 37
.1
.4
.42
f Kerb CONTRACTOR TO ALLOW FOR PROVISION OF ALL
5
|S| SEDIMENT FENCING
31 REQUIRED SEDIMENT AND EROSION CONTROL DEVICES
22. Edge o
f Bitum
en
23.58 25 IN ACCORDANCE WITH IECA AND NOOSA SHIRE COUNCIL
24.82 POLICIES AND GUIDELINES
FILTER SOCK SEDIMENT TRAP
23
.46 Sewer Manhole
24.95
CONSTRUCTION ENTRY/EXIT
24.8
5
CLIENT DETAILS: PROJECT ADDRESS: APPROVED BY: PROJECT NAME:
6 WYANDRA STREET, NOOSA HEADS
CAPITAL PRUDENTIAL TITLE: STATUS:
6 WYANDRA STREET EROSION SEDIMENT FOR APPROVAL
© ABN 89 647 469 707
B 28/10/2022 REISSUED FOR APPROVAL MVP BP NW NOOSA HEADS NATHAN WAGSTAFF CONTROL PLAN NOT FOR CONSTRUCTION
75 NOOSA DRIVE RPEQ: 20693
A 11/07/2022 ISSUED FOR OPW BP NW NW SCALE:
NOOSA HEADS, QLD 4567 CPEng
+61 7 5211 1003 REV DATE DESCRIPTION DWN CHK APP
1:100 DATE: 28/10/2022
DRAWING NUMBER: PROJECT NUMBER: SHEET REV:
SIZE:
RECORCONSULTING.COM REVISIONS
DO NOT SCALE, IF IN DOUBT ASK
C10 20220078 A1 B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.