Original source · versioned page text
RFI - RECOR Preliminary Stormwater Management Report - 20220078
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
SITE DETAILS
2.1. Existing Site Description & Drainage
The existing site, known in real property terms as Lot 40 RP 139776, is located at 6 Wyandra Street having frontage
to both Wyandra Street and Safari Street. The existing site contains a residential dwelling with a site area of 598m².
2.2. Existing Drainage Patterns
The subject land falls typically south-west towards Wyandra Street at grades varying across the site. The natural
surface falls at between 20% to 30% along the site boundaries, however the centre of the site containing the existing
dwelling is flatter at approximately 10%.
The run-off from the site typically drains as overland surface flows towards the south-west where it is captured by the
stormwater infrastructure within the road reserve. Two existing kerb inlet pits within the road reserve are likely to
capture all run-off from the existing site.
Roof run-off is conveyed by downpipes below ground, and it is considered that a kerb adapter outlet observed in
the Safari Street frontage kerb is the discharge point for these pipes.
Due to the sloping nature of the site, run-off from the upstream adjacent properties to the north and east is expected
to drain across the subject site.
Figure 2.1 - Site Locality Plan (Noosa Council Intramaps, 2022)
Project number 20220078
File RECOR Preliminary Stormwater Management Report - 20220078, 2022-11-11 Page 6 of 16
Revision 2
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.