deck incl. structure under to be removed
ex. alum. louvre blades to be removed /
replaced (within exist. frames) exist roof structure over to be removed
deck 2 extent of windows, doors, walls to be
ex.shs ex.shs ex.shs
removed for new bathroom extensions -
ex. alum. louvre blades to be removed /
exist. steps to be removed new structure to eng's req'ts
remove exist. screens remove exist. screens replaced (within exist. frames)
deck 1 ex.dp
exist. timber decking to exist. door exist.door
extent of existing deck floor deck 1 to be removed /
structure to be cut-back / make good any exist. exist. load bearing stud desk to be removed
modified (shown hatched) sub-floor structure wall - new to replace -
ex.shs robe & desk to be
to eng's req'ts
exist. garden pavers to be removed
removed - extent of landscaping lounge 2 bed 3 bath 1 bed 2
works to be confirmed fittings, fixtures, floor & wall
tiles to be removed complete
external shr to be removed ex. f.f.l. 29.80 wall mounted bedhead
ex.shs exist. bifolds
/ relocated - patch / make be removed
to be removed
good exist. walls
exist. sliding door / part robe to be
garden / timber retaining walls / shelves to removed removed
under pool to be removed door & part wall/s to
void over be removed
extent of exist. timber (internal remove all exist. tiles
exist. exist. tile / timber line & external) to be removed for to Level 1 (internal +
new floor underlay / tiles external) 1
remove conc. block walls remove l'dry
pool to eng's req'ts fittings & fixtures
exist. pool maintenance to
be modified / made larger remove exist. sauna
complete
sauna 7
exist.
laundry
exist. services to be remove hand basin - cap
modified to suit new cup'd all services as req'd
- tbc on site
store remove wc / replace
with new as spec.
walls / fixtures to be demolished - make good where req'd
01 LEVEL 1 - EXISTING & DEMOLITION FLOOR PLAN
typ. 90mm internal stud wall - u.n.o.
- 1:100@A3 / 1:50@A1
existing wall/s to remain (make good as req'd)
0 1.0 2.0 5.0m
01 ENGINEERING & CERTIFICATION ISSUE 19.05.2020
Issue Amendment Date
bsa lic.no.1071865
The design & drawings shown on these PROJECT DRAWING TITLE SCALE DWG No. ISSUE
1:100@A3 / 1:50@A1
plans are copyrighted and remain the Alterations & Extensions for Goetz Maeuser & Louise Biddell Existing & Demolition LEVEL 1 PLAN
property of 'georgina price design'. No
unauthorised copies shall be made. 8/27 Ross Crescent, Sunshine Beach Q DATE
May 2020
A.02 01
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 12 pages
Page 2
line of Level 1 deck below to be removed
exist. steel balustrade to be cut back exist. steel balustrade to remain
to corner for new glass pool fencing (new finish) exist roof structure below to be removed
exist.louvre exist.louvre
ex.dp
deck 3 exist.automated blinds
exist.louvre
exist.automated blinds
exist. decking to exist.win. exist.win.
remain
exist. louvre -
exist. glass pool
living study 2 new glass
extent of exist. pool fencing to be removed for new
remove exist. exist. steel balustrade to
fencing to remain exist.doors ex. f.f.l. 33.0 ex. f.f.l. 32.4 shelves
remain (new finish)
entry external entry
exist. tiles to be exist. external
removed tiles to remain
exist. flue to be removed void
exist. fireplace & walls to be
exist.win.
removed / modified for new exist. door / glazing / panel over to be removed
fireplace / woodstore
part exist. floor to be
u/s deck - joists to be removed for new stone
removed for new dining - to detail exist. entry bench to be removed
exist.
win.
pool garage
exist. garage door to remain
pool surface to be scabbled removed / patch
back, waterline tiles removed - exist. shade 8
ready for new pool tile finish - structure fixings
to all surfaces 9
(to walls over)
exist.
ng
wall removed with s/s shs
eti
he
duct relocated
let al s
1
mp et
skimmer box lid to be replaced 17
co g m
e
ex.dp
ed lin
ov cei
door/s & part wall/s to
rem ved
exist. sliding doors be removed /modified
kitchen
be ur
to be removed
to ist. c
external shr & tiles to be approx. extent of timber
wc
ex
removed for new decking to be removed for
new floor underlay / tiles
ex.dp exist.win.
part wall removed
exist. glass pool fencing for new window
/ gate to remain exist. windows & part
wall/s removed fittings, fixtures, tiles, store
cup'd to removed complete -
all kitchen benches, fittings, fixtures s/steel basin to be reused
complete to be removed - cap water /
gas for new installations exist. window removed / to
be reused in new location
01 LEVEL 2 - EXISTING & DEMOLTION FLOOR PLAN walls / fixtures to be demolished - make good where req'd
- 1:100@A3 / 1:50@A1 typ. 90mm internal stud wall - u.n.o.
0 1.0 2.0 5.0m existing wall/s to remain (make good as req'd)
01 ENGINEERING & CERTIFICATION ISSUE 19.05.2020
Issue Amendment Date
bsa lic.no.1071865
The design & drawings shown on these PROJECT DRAWING TITLE SCALE DWG No. ISSUE
1:100@A3 / 1:50@A1
plans are copyrighted and remain the Alterations & Extensions for Goetz Maeuser & Louise Biddell Existing & Demolition LEVEL 2 PLAN
property of 'georgina price design'. No
unauthorised copies shall be made. 8/27 Ross Crescent, Sunshine Beach Q DATE
May 2020
A.03 01
Page 3
deck below
ex.gutter to remain ex.dp
remove exist. steel outriggers remove exist. steel outriggers
to this roof completely (to be to this roof completely (to be
replaced with new) replaced with new)
exist. 5° fall
exist. roof sheeting to this roof only to be exist. glass to be removed - exist.
removed complete for new roof sheeting- steel balustrade section to be reused /
incl. all flashings / steel roof outriggers refinish as spec.
pool below
fall
(reuse exist. roof sheeting to replace
exist. 6° fall
other roof areas as noted) exist. membrane to flat roof areas to be
exist. skylights to remain
exist decking & floor joist under removed / prepped & repaired for new
to be removed for new exist. flue to be removed / replaced with membrane - to all flat roof areas with falls
exist balustrade to deck 6 to be new including roof flashings
removed for new remove exist. tiles
line of exist. roof over
ex.shs ex.shs remove window / deck 5
deck 6 part wall
ex.dp
exist.doors exist.win. exist.win. exist.win. exist.win. exist.win. exist.doors
exist.win. exist.win. void
bed 1 study
ex. f.f.l. 35.6 ex. f.f.l. 35.6
exist.win. 8
fall
bath 2 9
door / wall to be removed for
new door location
exist.win.
void part wall to be removed
exist.
ex.hoods for new cavity slider exist.win.
exist.win.
exist. robe / walls to be removed - 1
15
exist. structure to be reviewed by
ex.dp door & part wall/s to
Eng for structural adequacy
exist.win. be removed
ex.framed roof wir walkway all fittings, fixtures, floor & wall
box gutter over
store bath 3 tiles to be removed complete
exist. robe cup'ds to be removed glass below
exist.win.
complete - water damage / leak to
be rectified (including replacing /
ex.dp
new box gutter over)
all fittings, fixtures, floor & wall
tiles to be removed complete
walls / fixtures to be demolished - make good where req'd
01 LEVEL 3 - EXISTING & DEMOLITION FLOOR PLAN (Roof Plan Level 2)
typ. 90mm internal stud wall - u.n.o.
- 1:100@A3 / 1:50@A1
existing wall/s to remain (make good as req'd)
0 1.0 2.0 5.0m
01 ENGINEERING & CERTIFICATION ISSUE 19.05.2020
Issue Amendment Date
bsa lic.no.1071865
The design & drawings shown on these PROJECT DRAWING TITLE SCALE DWG No. ISSUE
1:100@A3 / 1:50@A1
plans are copyrighted and remain the Alterations & Extensions for Goetz Maeuser & Louise Biddell Existing & Demolition LEVEL 3 PLAN
property of 'georgina price design'. No
unauthorised copies shall be made. 8/27 Ross Crescent, Sunshine Beach Q DATE
May 2020
A.04 01
Page 4
refer to Level 3 Floor Plan for
details of roof works to this roof
ex.flue to removed
ex.gutter to remain
20°
fall
exist. steel outriggers to this exist. custom orb roof
roof to remain sheeting to remain -
exist. solar pool heating
exist.
10° fall
system to remain
20° fall
exist. steel outriggers to this
20° fall
exist.
exist.
roof to remain
exist. wall capping under - to be
exist. roof sheeting repaired / replaced if needed - cos
to remain
exist. roof sheeting / steel outriggers to
20°
remain to lower section
fall
exist. curved roof sheeting to remain
20°
fall
20°
fall
exist. box gutter - to be rectified due to exist. roof sheeting ex.gutter to remain
exist. water damage / make good to remain exist. roofing, including structural
purlins to higher section roof to be exist. box gutter - to be exist. roofing to higher section roof to
removed / replaced rectified due to exist. water be removed / replaced
damage / make good
01 EXISTING & DEMOLITION ROOF PLAN walls / fixtures to be demolished - make good where req'd
- 1:100@A3 / 1:50@A1 typ. 90mm internal stud wall - u.n.o.
0 1.0 2.0 5.0m existing wall/s to remain (make good as req'd)
01 ENGINEERING & CERTIFICATION ISSUE 19.05.2020
Issue Amendment Date
bsa lic.no.1071865
The design & drawings shown on these PROJECT DRAWING TITLE SCALE DWG No. ISSUE
1:100@A3 / 1:50@A1
plans are copyrighted and remain the Alterations & Extensions for Goetz Maeuser & Louise Biddell Existing & Demolition ROOF PLAN
property of 'georgina price design'. No
unauthorised copies shall be made. 8/27 Ross Crescent, Sunshine Beach Q DATE
May 2020
A.05 01
Page 5
2650 cos 450 2530 cos 4471 4471
75 shs 4136 1151 90 1151 4136 75 shs
90 2065 90 1955 90
wall hung vanity with wall mounted mixer / spout with timber
maintain access mirror shaving cabinet & low ht timber shelf under - bath 1+4
new timber decking steps / new shower extension - setdown for falls (no step / hob)
new formed conc. fire pit built in seating
frameless glass panel & door - bath 1+4 line of new roof / awning
(350h) with concrete structure over shr
1. up cut back exist. deck approx. 500mm W.04
platform - sealed as spec.
900
W.05 extension / decks
line of deck over fire pit area 2. L1
75 shs
L1
90
450
3. fixed fixed
1500 deck
exist. deck to be cut back shs(galv shs(galv
ex.shs 4. ex.shs & p.coat) & p.coat)
deck 2 deck 3
1100 shr
to suit new timber decking W.03 W.06
ex.shs - new paint deck 1
925
wrapped steps up timber decking L1 L1 timber decking
1500
finish - typ. to all exist. louvre - fw (tile insert) fw (tile insert) exist. louvre -
new decking
90
louvre louvre new glass ex.dp
new external pavers* new glass option for additional dp or larger
to replace exist. 1. 2. 3. 4. pack out wall to suit exist. door exist. door dia. (to be confirmed on site
pocket doors - render W.02 W.07
new garden with conc. with plumber / Contractor)
new timber batten screening finish to match existing - L1 L1
circular stepping pavers W.01 load bearing
820 cs
to 1.8m - open over flashing over req'd stud wall - new vb fw (tile insert)
75
ex.shs L1 fw (tile
2950 robe
cut back exist. deck for
2760
to replace exist. -
3060
new lower shower deck new h/wd timber batten louvre vb insert)
to eng's req'ts bath 4 bed 2 new robe doors &
680
ceiling lining to replace fitout as detailed
external shr to be removed custom orb metal ceiling lining
bed 3 new tiles
bath 1 ex.timber (refinished)
new robe
2630 shr deck
820
/ relocated pipes to suit 1. 2. ex. f.f.l. 29.80 new tiles new bedhead shelf
new shr & basin location ex.shs - new paint
90
finish - typ. to all wc
ex.timber (refinished)
90
90
infill wall
new privacy planting wc king size bed shown
1. 2. p.c alum. framed gate with D.03 king size bed shown
1300
new shower /
1000
new timber h/wd vertical timber battening for L1
members with towel basin deck
screening to basin / shr area 820 ex.timber (refinished)
hooks (nom.90x45)
new garden with new
rock retaining walls open under pool
90
void over 820
to garden exist. tile / timber line
tiles to continue to new D.01 5 00
new external tiles L1 R1 new curved junction between tile
3800 lounge 2 - cos
line of timber / tiles
exist. new glazed sliding / timber
extent of metal roof sheeting to u/s D.02
door (approx. 2050l) new beam over to
new timber batten floor joists - fall to new gutter with L1 support exist. floor up 1 reuse exist. timber flooring for
with wall pocket infill parts to bed 2 + 3
surrounds to pool timber battens over - waterproofing joists (due to l'dry
equipment - double req'd from L2 deck over lounge 2 wall being removed)
sauna space
exist. s/steel balustrade - repair
door - more space new sauna low shelf with wall new tiles
1800
frameless glass panels & doors to / re-polish where req'd
required for new external tiles mounted tv over
front of sauna with timber batten
maintenance exist. (adjustable tv 7
screening to detail exist. timber stair (refinished) -
bracket mount) typ. to all
90
low ht drawers /
cup'd
760
exist. pool glazing to remain infill exist. door with duct & shelf over to detail new full
- new wood lining to exist. new walls in front for ht cup'ds
glazing reveal / block plumbing over / sliding door exist. services to be
820
1100
modified to suit new cup'd
new a/c split system - ventilation req'ts tbc laundry / store new wc
within bulkhead over - new tiles
exist. pool linear grille as selected
650
dryer & w/m under
l'dry chute over within
cup'ds on bench - to detail new stone bench with
undermount sink - overbench
cup'ds & hanging rail
3560 - sauna space cos
01 proposed LEVEL 1 FLOOR PLAN
note:
- 1:100@A3 / 1:50@A1 * extent of landscape works in initial renovation works to be confirmed ; walls / fixtures to be demolished - make good where req'd
- all external / internal walls to be patched / made good where required
0 1.0 2.0 5.0m typ. 90mm internal stud wall - u.n.o.
prior to new paint finish as spec.
existing wall/s to remain (make good as req'd)
01 ENGINEERING & CERTIFICATION ISSUE 19.05.2020
Issue Amendment Date
bsa lic.no.1071865
The design & drawings shown on these PROJECT DRAWING TITLE SCALE DWG No. ISSUE
1:100@A3 / 1:50@A1
plans are copyrighted and remain the Alterations & Extensions for Goetz Maeuser & Louise Biddell Proposed LEVEL 1 FLOOR PLAN
property of 'georgina price design'. No
unauthorised copies shall be made. 8/27 Ross Crescent, Sunshine Beach Q DATE
May 2020
A.06 01
Page 6
line of new roof structure over shr extension & decks - to
match exist. style - waterproof membrane over with rendered
exist. steel balustrade to be cut back exist. steel balustrade - new 'black' blue board / flush set fc under - fall to outside
to corner for new frameless glass satin p.c paint finish as spec.
new deck below new deck below
1.2m h pool fencing
new 1.2m h frameless glass pool new cantilevered umbrella as exist.louvre exist.louvre ex.dp
fencing (to match exist.) to this spec. (fold away) exist.automated blinds exist.automated blinds option for additional dp or larger
side of deck / pool (total length) exist.louvre dia. (to be confirmed on site
deck 3 exist.win. exist.win. with plumber / Contractor)
exist. decking
desk with drawer exist. louvre -
unit under new glass
exist. glass pool
living study 2 full ht storage W.03
ex.timber (refinished) ex.timber (refinished) cup'd L2 exist. steel balustrade - new 'black'
fencing to remain exist.doors
ex. f.f.l. 33.0 satin p.c paint finish as spec.
ex. f.f.l. 32.4
D.01
entry L2 exist. retaining wall under to
new tiles to match
external entry
be rectified by others -
exent of new frameless glass
exist. external tiles
exist. external balustrade to remain
pool fencing (14270cos)
new exposed s/steel flue void
to detail
exist.win.
new fireplace as spec. with new fixed clear glass to side lite (new frame
stone hearth / wood store 2100h x 750w) with new solid timber door
space - to detail 1020w - external 'black' stain as spec.
duct relocated - plumbing to
u/s deck over to be lined with
be modified to suit - to be dining
h/wd battens fixed on fc with ex.timber (refinished) new timber entry bench / drawer unit
rendered to match exist.
drainage falls - to detail
align edge ex.bifold new infill flooring strip to
garage
exist.
win.
door wall return match exist. - cos
exist. timber decking
pool new p.c alum
new pool tiles l'dry chute cup'd to end of
exist. garage door to remain
retractable exist. s/steel balustrade (re-polish / make
(to all walls of pool) louvre roof over island bench - concealed good) with new paint finish to exist. steel
as detailed stringer ( 'black' satin as spec.)
8
1000 600 2530 1200
ce h/wd
exist. timber stair (refinished) - typ. to all
g
ex. s/s shs within 9
ilin
ed with
new stacker doors new wall - tbc
pa laced
fc
with wall pocket - modify wall for new
ov rep
int
new struct. member cavity slider (lockable)
900
ith ing d -
over to eng's req'ts cs 820 ext.
er
n w lin ve
1
skimmer box lid to be replaced with
tio ng mo
new stone bench - 950h 17 820
ula ceili e re
timber decking lid to match decking vb
with u/mount single sink full ht ex.dp
in
new wc open
b
& i tten to
intergrated d/wash under storage
1300
shelves
ing ba ing
D.02 oven x 2No. (convection new tiles cup'ds
lin ber ceil
L2 kitchen ex.timber (refinished) & steam) under fw (tile
tim rved
external shr - new tiles &
ns
insert)
cu
fittings to be replaced
full ht cup'd wc
ex.dp french door fridge & louvre W.01 fixed glazing - concealed 2100h pantry cup'ds & wine W.02
exist.win.
exist. glass pool fencing cup'd over - 2100h L2 frame from inside fridge - open over L2 reused exist. s/steel vanity basin
/ gate to remain gas cooktop with concealed inset within new timber shelf -
950h stone bench with 150h rangehood cup'd over wall hung with bottle trap under
shelf at rear
infill wall reused exist. louvre window
new external paving* to rear court area
new bbq storage box with shelf
(approx. 1500l x 900w x 1800h) - p.c
alum frame with h/wd timber battening
to surrounds over fc sheeting - exact
location to be confirmed on site
01 LEVEL 2 FLOOR PLAN
- 1:100@A3 / 1:50@A1 note: walls / fixtures to be demolished - make good where req'd
0 1.0 2.0 5.0m * extent of landscape works in initial renovation works to be confirmed ;
- all external / internal walls to be patched / made good where required typ. 90mm internal stud wall - u.n.o.
prior to new paint finish as spec. existing wall/s to remain (make good as req'd)
01 ENGINEERING & CERTIFICATION ISSUE 19.05.2020
Issue Amendment Date
bsa lic.no.1071865
The design & drawings shown on these PROJECT DRAWING TITLE SCALE DWG No. ISSUE
1:100@A3 / 1:50@A1
plans are copyrighted and remain the Alterations & Extensions for Goetz Maeuser & Louise Biddell Proposed LEVEL 2 FLOOR PLAN
property of 'georgina price design'. No
unauthorised copies shall be made. 8/27 Ross Crescent, Sunshine Beach Q DATE
May 2020
A.07 01
Page 7
deck below new roof over L1 deck /
ex.dp + new
shr extension below dp(tbc)
ex.gutter to remain
new p.c steel new p.c steel
outriggers to this roof outriggers to this roof
exist. 5° fall
pool below new custom orb (colourbond finish) roof new clear glass to replace exist. glass
sheeting to this roof only - all new to balustrade - new p.c. 'black' satin
colourbond flashing to replace exist. finish to handrail / uprights
fall
exist. 6° fall
ex.shs - new paint exist. skylights to remain - new apron new waterproofing membrane to all flat
finish - typ. to all flashing to suit roof areas & under new external tiles -
new s/steel flue - installation make good any damaged areas - req'd
new frameless glass balustrade on
to NCC 3.7.3 req'ts falls min1:100 - colour to match new roof
spigots to match exist. - minimal s/s
sheeting (to be confirmed on site)
channel handrail to top - min.1m h line of exist. roof over new flue
deck 6 fixed glazing to nom.50mm step up to shower area for deck 5
new h/wd decking (incl. replace exist. falls (if possible modify joists under to new external tiles
new structure under) ex.dp have no step) frameless shower screen
exist.doors exist.win. exist.win. exist.win. exist.win. exist.win. exist.doors
W.01
new ceiling mounted curtain new ceiling mounted curtain
exist.win. exist.win.
L3 void track - new curtains (sheer &
track - new curtains (sheer &
block out) by others block out) by others
exist.shutters
new wc / japanese toilet
seat (in- wall cistern) study ex. f.f.l. 35.6
bed 1 min° fall exist.win. 8 ex.timber (refinished)
ex.timber (refinished) void exist. timber stair (refinished) - typ. to all
fall
ex. f.f.l. 35.6
bath 2 freestanding bath 9
exist.win. new tiles new door position
(shown 1680 x 925) - wall
new p'bd bed head shelf with 820 cs (door
820
mounted mixer / spout on
exist.
solid timber shelf as spec opening exist.win.
1100h vanity wall
exist.win.
1
modified)
1000h drawers to wir side 15 nom.50mm step up to
with bed head shelf to detail - ex.dp shower area for falls -
open over exist.win. exist.win. frameless shower screen
wir walkway ex.timber (refinished)
new robe cup'ds - mix of full
ex.timber (refinished) robe bath 3 new wc (in-wall cistern)
ain new tiles
ht hanging / 21 hanging / glass below - to rem to replace exist.
shelves / shoe shelves exist.win.
ex.dp new wall hung vanity bench with
exist. s/steel balustrade new fitout for robe
(re-polish / make good) drawers under, wall mixer / spout
new p.c alum (white) louvred
retractable roof structure over exist. s/steel balustrade (re-polish
L2 outdoor dining area - / make good) with new paint finish
new wall hung vanity bench on 21 typ. new wall & floor tiles to all
mounted at floor level of L3 to exist. steel stringer ( 'black'
vanity shelf - mirrored shaving bathrooms - 2100 wall tiles to shr / 1100
satin as spec.)
cup'ds over, wall mixer / spout h wall tiles to all other walls uno
nb:
- typ. to all - exist. flashings to windows / roof areas to be treated & refinished as
01 LEVEL 3 FLOOR PLAN (Roof Plan Level 2) spec. where req'd (unless noted to be replaced)
- all roof screws to be checked / installed correctly - perpendicular to the sheeting in walls / fixtures to be demolished - make good where req'd
- 1:100@A3 / 1:50@A1 the middle of the rib for maximum water tightness
typ. 90mm internal stud wall - u.n.o.
0 1.0 2.0 5.0m note:
- all external / internal walls to be patched / made good where required existing wall/s to remain (make good as req'd)
prior to new paint finish as spec.
01 ENGINEERING & CERTIFICATION ISSUE 19.05.2020
Issue Amendment Date
bsa lic.no.1071865
The design & drawings shown on these PROJECT DRAWING TITLE SCALE DWG No. ISSUE
1:100@A3 / 1:50@A1
plans are copyrighted and remain the Alterations & Extensions for Goetz Maeuser & Louise Biddell Proposed LEVEL 3 FLOOR PLAN
property of 'georgina price design'. No
unauthorised copies shall be made. 8/27 Ross Crescent, Sunshine Beach Q DATE
May 2020
A.08 01
Page 8
refer to Level 3 Floor Plan for
details of roof works to this roof
new s/steel flue - installation
to NCC 3.7.3 req'ts
ex.gutter to remain new flue
20°
fall
exist. steel outriggers to this
roof to remain - to be patched / exist. custom orb roof
treated & refinished as spec. sheeting to remain to this
exist.
10° fall
roof - exist. solar pool exist. steel outriggers to this
20° fall
20° fall
exist.
exist.
heating system to remain roof to remain - to be patched /
treated & refinished as spec.
exist. wall capping under - to be
repaired / replaced if needed - cos
min.1:100
fall exist. roof sheeting / outriggers to remain - steel
20°
outriggers to be patched, treated & refinished as spec.
fall
20°
fall
20°
fall
new roofing to higher section roof (replaced with
exist. box gutter to be rectified / make good exist. roof sheeting ex.gutter to remain exist. roof sheets that have been removed from
p.c alum louvred L2 roof (only if suitable / in good condition) -
where water damage - new structure where to remain exist. steel purlin/s under higher higher section roof to be removed
retractable roof exist. box gutter under - to steel purlins under to be patched, treated &
required / new waterproof membrane with section roof to be replaced (replaced with exist. roof sheets that
structure below - over be rectified due to exist. refinished as spec.
new falls req'd min.1:100 have been removed from L2 roof (only
Level 2 outdoor dining water damage / make good
if suitable / in good condition)
new solar panels / option only for costings - to be
confirmed - option to have approx. 16 panels (3kW
system on upper level roof & roof over bed 1
nb:
01 ROOF PLAN - typ. to all - exist. flashings to windows / roof areas to be treated & refinished as
walls / fixtures to be demolished - make good where req'd
spec. where req'd (unless noted to be replaced) typ. 90mm internal stud wall - u.n.o.
- 1:100@A3 / 1:50@A1
- all roof screws to be checked / installed correctly - perpendicular to the sheeting in
0
existing wall/s to remain (make good as req'd)
1.0 2.0 5.0m the middle of the rib for maximum water tightness
01 ENGINEERING & CERTIFICATION ISSUE 19.05.2020
Issue Amendment Date
bsa lic.no.1071865
The design & drawings shown on these PROJECT DRAWING TITLE SCALE DWG No. ISSUE
1:100@A3 / 1:50@A1
plans are copyrighted and remain the Alterations & Extensions for Goetz Maeuser & Louise Biddell Proposed ROOF PLAN
property of 'georgina price design'. No
unauthorised copies shall be made. 8/27 Ross Crescent, Sunshine Beach Q DATE
May 2020
A.09 01
Page 9
new roofing to higher section (replaced with exist. timber exposed rafters tails to
exist. roof sheets if possible) - steel purlins remain - repair / patch where req'd - LEGEND
under to be replaced with new p.c steel member new paint finish as spec. cb (-) Concrete Block - (e=exposed; r=render; p=paint)
to match exist. - paint finish as spec. cw Concrete Wall
exist. roof to remain - repair / treat bw Brick wall - face brick - pattern to detail
new roofing to higher section (replaced with exist. exist. roof for corrosion where req'd bw (feature) Brick Wall - feature pattern to detail
roof sheets if possible) - steel purlins under to be (behind) wc(v) Wall cladding - vertical
patched, treated & refinished as spec. wc(h) Wall cladding - horizontal
new s/steel flue - installation fc (-) fc sheeting (e=exposedl r=render)
to NCC 3.7.3 req'ts ts Timber screening (to det)
dp Down pipe
rw Retaining wall
new custom orb (colourbond finish) roof
typ. to all - new external paint finish as bal(-) Balustrade (type to detail)
sheeting to this roof only - all new
spec. - make good any damage to walls / sh Sun hood
colourbond flashing to replace exist.
patch render finish where req'd / treat rust shs / sb Steel column / Beam
spots prior to new finish ex.fc(r) tp Timber post / column
mrs Metal roof sheeting
exist. LEVEL 3 - f.f.l. 35.6 mrc Metal roof capping / fascia
ex.cb(r) ms Metal screening (to detail)
mrd Metal roller door
t.fa Timber fascia (painted)
new rendered fc sheeted pcs Polycarbonate roof / wall sheeting
2600
D.01 roof structure over deck / shr ex. / exist. existing
L2 W.03 extension - fall req'd
L2
exist. louvre -
exist. garage door to remain
new glass exist. LEVEL 2 - f.f.l. 33.0
600
ex.cb(r)
exist. LEVEL 2 - f.f.l. 32.4
new fixed clear glass to side lite (new frame
2100h x 750w) with new solid timber door new shs (gal. p.c paint finish)
1020w - external 'black' stain as spec. to eng's req'ts
ex.fc(r) fc (r)
2600
new timber deck to L1
bedrooms / new structure
to eng's req/ts
exist. LEVEL 1 - f.f.l. 29.80
01 SOUTH ELEVATION
- 1:100@A3 / 1:50@A1 exist. box gutter / drainage behind to be
rectified / make good - to all
exist. curved roof sheeting exist. timber exposed rafters tails to remain - repair
/ patch where req'd - new paint finish as spec.
- typ. to all - exist. flashings /
exist. roof sheeting roof members to be treated &
refinished as spec. where req'd
exist. box gutter / drainage to be (unless noted to be replaced)
rectified / make good
ex.fc(r) ex.fc(r)
typ. to all - new external paint
finish as spec. - make good
any damage to walls / patch
render if required / treat rust
spots prior to new finish
exist. LEVEL 3 - f.f.l. 35.6
exist. curved metal ceiling to ex.cb(r) ex.cb(r) ex.cb(r) ex.cb(r)
be removed - new exposed W.01 W.02
2600
exist.win.
h/wd timber battens installed L2 L2
on painted fc with floor exist. glass pool fencing to
insulation inbetween remain where noted
exist. LEVEL 2 - f.f.l. 33.0
new structural lintel over new cb(r) - infill walls where
window to eng's req'ts req'd - render finish to reused exist. louvre window
match exist. - typ. to all
fc(r) - new walls around pocket sliding door -
line of exist. pool - new pool rendered finish to match exist.
3200
tiles complete as spec.
exist. LEVEL 1 - f.f.l. 29.80
02 WEST ELEVATION
- 1:100@A3 / 1:50@A1
0 1.0 2.0 5.0m 01 ENGINEERING & CERTIFICATION ISSUE 19.05.2020
Issue Amendment Date
bsa lic.no.1071865
The design & drawings shown on these PROJECT DRAWING TITLE SCALE DWG No. ISSUE
1:100@A3 / 1:50@A1
plans are copyrighted and remain the Alterations & Extensions for Goetz Maeuser & Louise Biddell Proposed SOUTH & WEST ELEVATIONS
property of 'georgina price design'. No
unauthorised copies shall be made. 8/27 Ross Crescent, Sunshine Beach Q DATE
May 2020
A.10 01
Page 10
LEGEND
cb (-) Concrete Block - (e=exposed; r=render; p=paint)
exist. roof sheeting
cw Concrete Wall
exist. box gutter / drainage to be bw Brick wall - face brick - pattern to detail
new frameless glass balustrade on s/steel rectified / make good bw (feature) Brick Wall - feature pattern to detail
spigots (to match exist.) with s/steel channel wc(v) Wall cladding - vertical
to top for handrail - min.1m high wc(h) Wall cladding - horizontal
fc (-) fc sheeting (e=exposedl r=render)
new h/wd decking (incl. new structure ts Timber screening (to det)
under) to bed 1 deck - new structural ex.fc(r) typ. to all - new external paint finish as dp Down pipe
support under to eng's req'ts spec. - make good any damage to walls / Retaining wall
rw
2100
exist.win. patch render finish if req'd / treat rust bal(-) Balustrade (type to detail)
exist.win. spots prior to new finish Sun hood
sh
exist.win.
shs / sb Steel column / Beam
exist. LEVEL 3 - f.f.l. 35.6
tp Timber post / column
mrs Metal roof sheeting
new paint finish to exist. structure (typ. to all)
mrc Metal roof capping / fascia
exist.doors
ms Metal screening (to detail)
new h/wd timber battening under bed 1
mrd Metal roller door
2600
area (incl. new insulation & fc lining)
t.fa Timber fascia (painted)
new frameless glass pool fencing to pcs Polycarbonate roof / wall sheeting
northern side of exist.deck - min.1.2m h ex. / exist. existing
exist. LEVEL 2 - f.f.l. 33.0 to NCC & pool regulations
exist. deck structure
new h/wd timber battening under / supports to remain
deck - to replace metal sheeting ex.cb(r)
3200
exist. shs - new paint finish
pool maintenance storage to be
new bathroom extension area behind
enlarged with ts - incl. double
fc (r) new stone retaining walls / swing gates for easier access
exist. LEVEL 1 - f.f.l. 29.80 landscaping to garden area
450
new h/wd shower deck with
steps, screening - to detail
new h/wd timber decking 'wrapped'
steps / bench seat - new decking
complete to Level 1 deck 01 NORTH ELEVATION
exist. roof to remain - repair / treat
new roofing to higher section
- 1:100@A3 / 1:50@A1 for corrosion where req'd
(replaced with exist. roof sheets
if possible) - steel purlins under
new custom orb (colourbond finish) roof
to be replaced with new p.c steel
sheeting to this roof only - all new
member to match exist. - paint
colourbond flashing to replace exist.
finish as spec.
typ. to all - new external paint finish as
spec. - make good any damage to walls /
patch render finish if req'd / treat rust
spots prior to new finish
exist.doors exist.win. exist.win. exist.win. exist.win. exist.doors
/ win.
new clear glass to new frameless glass balustrade on s/steel
replace exist. glass to spigots (to match exist.) with s/steel channel
balustrade - new p.c. to top for handrail - min.1m high
'black' satin finish to exist. exist.
win. win.
handrail / uprights exist. LEVEL 3 - f.f.l. 35.6
exist. steel balustrade -
exist.win.
new 'black' satin p.c
2600
paint finish as spec.
exist.win.
exist.win. exist.win.
exist.win. exist. LEVEL 2 - f.f.l. 33.0
600
exist. LEVEL 2 - f.f.l. 32.4
shs (p.c finish) fc (r) fc (r) shs (p.c finish)
new roof structure over new sauna
new deck / shr extension - exist.doors exist.doors
behind to detail
3200
fc cladding with W.06 W.03
2600
waterproofing membrane L1 L1 ts - new h/wd timber
over & render finish to W.05 W.04 screen 1800h wall to
fascia to match exist. exist. louvre - L1 L1 exist. louvre -
new glass new glass
shower deck
ex.dp ex.cb(r)
W.07 W.02
L1 L1 exist. LEVEL 1 - f.f.l. 29.80
option for additional dp
or larger dia. (to be open under
confirmed on site with
plumber / Contractor) new rendered infill walls to 450
new h/wd timber decking 'wrapped'
suit new glazing steps / bench seat - new decking
new h/wd timber decking /
structure under to eng's req'ts - 02 EAST ELEVATION complete to Level 1 deck
decking to 'wrap' around sides - 1:100@A3 / 1:50@A1
01 ENGINEERING & CERTIFICATION ISSUE 19.05.2020
0 1.0 2.0 5.0m
Issue Amendment Date
bsa lic.no.1071865
The design & drawings shown on these PROJECT DRAWING TITLE SCALE DWG No. ISSUE
1:100@A3 / 1:50@A1
plans are copyrighted and remain the Alterations & Extensions for Goetz Maeuser & Louise Biddell Proposed NORTH & EAST ELEVATIONS
property of 'georgina price design'. No
unauthorised copies shall be made. 8/27 Ross Crescent, Sunshine Beach Q DATE
May 2020
A.11 01
Page 11
line of deck over
fire pit area
deck 2 deck 3
deck 1
exist. door
bath 4 bed 2
bed 3 bath 1
ex. f.f.l. 29.80
new tiled shower 1. 2.
/ basin deck
void over
up 1
lounge 2
new sauna
7
laundry / store
exist. pool
01 proposed LEVEL 1 FLOOR PLAN
- 1:100@A3 / 1:50@A1 Gross Floor Areas Total GFA = (existing - 323.43m²) - proposed 334.13m²
0 1.0 2.0 5.0m
Level 1 - existing
- internal - (107.9m² - stair 5.0m²) = 102.9m²
Level 1 - proposed
- internal - (118.6m² - stair 5.0m²) = 113.6m²
01 Issue to Town Planner 15.06.2020
Issue Amendment Date
bsa lic.no.1071865
The design & drawings shown on these PROJECT DRAWING TITLE SCALE DWG No. ISSUE
1:100@A3 / 1:50@A1
plans are copyrighted and remain the Alterations & Extensions for Goetz Maeuser & Louise Biddell Level 1 Existing & Proposed - GFA Plan
property of 'georgina price design'. No
unauthorised copies shall be made. 8/27 Ross Crescent, Sunshine Beach Q DATE
May 2020
DA.01 01
Page 12
new deck below new deck below
exist.automated blinds
deck 3 exist.win.
living study 2
ex. f.f.l. 33.0
ex. f.f.l. 32.4
entry
external entry
void
dining
garage
pool
8
9
1
17
kitchen
Gross Floor Areas Total GFA = (existing - 323.43m²) - proposed 334.13m²
01 LEVEL 2 FLOOR PLAN - GFA Level 2 - existing & proposed - no change
- 1:100@A3 / 1:50@A1 - internal - (140.75m² - stair 7.72m² - void 5.4m² ) = 127.63m²
0 1.0 2.0 5.0m
01 Issue to Town Planner 15.06.2020
Issue Amendment Date
bsa lic.no.1071865
The design & drawings shown on these PROJECT DRAWING TITLE SCALE DWG No. ISSUE
1:100@A3 / 1:50@A1
plans are copyrighted and remain the Alterations & Extensions for Goetz Maeuser & Louise Biddell Level 2 Existing & Proposed - GFA Plan
property of 'georgina price design'. No
unauthorised copies shall be made. 8/27 Ross Crescent, Sunshine Beach Q DATE
May 2020
DA.02 01
Page 13
deck below
pool below
line of exist. roof over
deck 6 deck 5
ex.dp
exist.win. exist.win. exist.win.
void
study ex. f.f.l. 35.6
8
bed 1 bath 2 void
9
ex. f.f.l. 35.6
1
15
exist.win. exist.win.
wir walkway bath 3
Gross Floor Areas Total GFA = (existing - 323.43m²) - proposed 334.13m²
01 LEVEL 3 FLOOR PLAN - GFA
- 1:100@A3 / 1:50@A1
Level 3 - existing - no change
0 1.0 2.0 5.0m
- internal - (117.7m² - stair 5.4m² - void 19.4m²) = 92.9m²
01 Issue to Town Planner 15.06.2020
Issue Amendment Date
bsa lic.no.1071865
The design & drawings shown on these PROJECT DRAWING TITLE SCALE DWG No. ISSUE
1:100@A3 / 1:50@A1
plans are copyrighted and remain the Alterations & Extensions for Goetz Maeuser & Louise Biddell Level 3 Existing & Proposed - GFA Plan
property of 'georgina price design'. No
unauthorised copies shall be made. 8/27 Ross Crescent, Sunshine Beach Q DATE
May 2020
DA.03 01
Used in these records
proposal plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.