Original source · versioned page text
2022-05-16 General Committee Meeting Agenda
The original of this document is very large (18.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
AGENDA
General Committee
Meeting
Monday, 16 May 2022
commencing at 10am
Council Chambers, 9 Pelican Street, Tewantin
Committee: Crs Frank Wilkie (Chair), Karen Finzel, Joe Jurisevic, Amelia
Lorentson, Clare Stewart, Brian Stockwell, Tom Wegener
“Noosa Shire – different by nature”
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of sections 2 to 58 (of 96)
Section 2
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
TABLE OF CONTENTS
ITEM PAGE
1. ATTENDANCE & APOLOGIES 3
2. CONFIRMATION OF MINUTES 3
3. PRESENTATIONS 3
4. DEPUTATIONS 3
5. ITEMS REFERRED FROM COMMITTEES 4
1 ECONOMIC DEVELOPMENT GRANT PROGRAM APPLICATION BY NOOSA
CHAMBER OF COMMERCE & INDUSTRY INC. 4
2 NOOSA THREATENED FAUNA SPECIES RECOVERY ROAD MAP 4
3 3D HAZARD MAPPING TOOL – APPOINTMENT OF SIMTABLE™ 4
6. REPORTS DIRECT TO GENERAL COMMITTEE 5
4 NOOSA DRIVE PATHWAY PROJECT REFERENCE GROUP - APPOINTMENT OF
COUNCILLORS TO REFERENCE GROUP 5
5 2122Q125 – CONTRACT FOR PROJECT MANAGMENT SERVICES FOR 2022
FLOOD RECOVERY AND RECONSTRUCTION 7
6 MCU21/0151 – APPLICATION FOR MATERIAL CHANGE OF USE –
TELECOMMUNICATIONS FACILITY SITUATED AT 25 RAILWAY PDE, POMONA 16
7 OPW22/0029 DEVELOPMENT APPLICATION FOR OPERATIONAL WORKS
(PRESCRIBED TIDAL WORKS – NOOSA RIVER OYSTER HABITAT
RESTORATION) FOR NOOSA RIVER 40
8 FINANCIAL PERFORMANCE REPORT – APRIL 2022 50
9 OPERATIONAL PLAN PROGRESS REPORT – THIRD QUARTER 2021-22 65
7. CLOSED SESSION 96
Page 2 of 96
Section 3
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
1. ATTENDANCE & APOLOGIES
2. CONFIRMATION OF MINUTES
The Minutes of the General Committee Meeting held on 19 April 2022 be received and
confirmed.
3. PRESENTATIONS
Nil.
4. DEPUTATIONS
Nil.
Page 3 of 96
Section 4
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
5. ITEMS REFERRED FROM COMMITTEES
PLANNING & ENVIRONMENT COMMITTEE
1 ECONOMIC DEVELOPMENT GRANT PROGRAM APPLICATION BY NOOSA
CHAMBER OF COMMERCE & INDUSTRY INC.
(Planning & Environment Committee Agenda, 10 May 2022, Item 2, Page 11)
Reason for referral – significance of the issue.
2 NOOSA THREATENED FAUNA SPECIES RECOVERY ROAD MAP
(Planning & Environment Committee Agenda, 10 May 2022, Item 5, Page 64)
Reason for referral – significance of the issue.
SERVICES & ORGANISATION COMMITTEE
3 3D HAZARD MAPPING TOOL – APPOINTMENT OF SIMTABLE™
(Services & Organisation Committee Agenda, 10 May 2022, Item 1, Page 4)
Reason for referral – for further consideration.
Page 4 of 96
Section 5
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
6. REPORTS DIRECT TO GENERAL COMMITTEE
4 NOOSA DRIVE PATHWAY PROJECT REFERENCE GROUP - APPOINTMENT OF
COUNCILLORS TO REFERENCE GROUP
Author Infrastructure Planning, Design and Delivery Manager, Craig Eldridge
Infrastructure Services Department
Index ECM/ Projects (T1) / Noosa Heads Noosa Drive Halse Lane to Sunshine
ECM/Subject / Councillors/Mayor – Governance and Administration
Attachments Nil
EXECUTIVE SUMMARY
Noosa Drive is a key link between the two precincts of Noosa Heads and Noosa Junction.
The Noosa Drive Pathway project involves the planning and design of a pedestrian and cycle
link between Noosa Lions Park and Sunshine Beach Road. The project is included in the
current capital works budget.
As part of the governance a Project Reference Group will be established consisting of various
stakeholders including two (2) Councillors.
RECOMMENDATION
That Council note the report by the Infrastructure Planning, Design and Delivery Manager to
the General Committee Meeting dated 16 May 2022 regarding the establishment of the
Noosa Drive Pathway Project Reference Group and appoint Councillor < > as Chair and
Councillor < > as a member of the Group.
REPORT
This report provides Council with the opportunity to nominate two (2) Councillors as
representatives on the Noosa Drive Pathway Project Reference Group.
1. Overview
The project will enhance facilities and provide a vital connection between the busy Hastings
Street and Noosa Junction precincts.
Key objectives of the project are:
Improved cycle and pedestrian connectivity between Noosa Heads and Noosa
Junction;
Reduced traffic congestion;
Improved safety for all users;
Creation of an experience for users with viewpoints and rest spots along an elevated
path;
Streetscape and landscaping improvements.
2. Progress to date
The project has advanced to the concept design phase with the engagement of external
consultants including surveyors and landscape architects.
Page 5 of 96
Section 6
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
3. Strategic Alignment
This project has alignment with Council policies, strategies, projects in the precinct and
potential initiatives including:
a. Noosa Walking & Cycling Strategy (in the top 25 ranked projects);
b. Public Transport Strategy;
c. Economic Development Strategy.
Previous Council Consideration
Nil.
Finance
The design and documentation of this project is fully funded with no financial implication by
the appointment of Councillors to the Project Control Group.
Risks & Opportunities
An opportunity exists to appoint two (2) Councillors to the Project Reference Group to
minimise any reputational risk.
Consultation
External Consultation - Community & Stakeholder
The Project Reference Group will include a representative from the Noosa Junction
Association, the Hastings Street Traders Association, Zero Emissions Noosa. Further
consultation will be completed with key external stakeholders and the wider community in
future phases of the project.
Internal Consultation
Internal stakeholders will include Environmental Services, Strategic Land Use Planning and
Infrastructure Services.
Departments/Sections Consulted:
Chief Executive Officer Community Services Corporate Services
Executive Support Director Director
Community Development Financial Services
Community Facilities Fleet
Libraries & Galleries ICT
Local Laws Procurement
Waste & Environmental Health Property
Revenue Services
Executive Services Environment & Sustainable Development X Infrastructure Services
Director Director X Director
Community Engagement Building & Plumbing Services Asset Management
Customer Service Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture Environmental Services Disaster Management
Strategic Land Use Planning X Infrastructure Planning,
Design and Delivery
Page 6 of 96
Section 7
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
5 2122Q125 – CONTRACT FOR PROJECT MANAGMENT SERVICES FOR 2022
FLOOD RECOVERY AND RECONSTRUCTION
Author: Disaster Reconstruction Coordinator, Julie Calvert
Infrastructure Services Department
Index: ECM/ Subject/ Disaster Operations
Attachments: 1. Current sites nominated for REPA Cat B submission for
reconstruction
EXECUTIVE SUMMARY
The February 2022 flood event (known as Alpha22) has been deemed an eligible
disaster by the State Government.
Council activated and were granted a request for Disaster Recovery Funding
arrangements (DRFA) which are administered by the Queensland Reconstruction
Authority (QRA).
During this event, a significant number of Council essential assets were affected and
will require reconstruction to return them to the prior standard. The reconstruction
value estimate is between $20,000,000 to $30,000,000 (still to be qualified).
Further advice indicates Council would also have a number of other essential assets
that have been identified as suitable for reconstruction to ensure greater resilience
during future events. Estimated value is yet to be determined for these projects that
DRFA terms as resilience or betterment.
QRA have set out guidelines to help administer the DRFA requirements which include
prescribed application process requiring justification and evidence. It is expected
having an experienced Project Management lead who have worked with QRA before
will lead to a high level of recovery by Council.
Recommendation is to award a contract for Project Management services to lead the
management of Council’s DRFA activities for a period of 27 months to September 30,
2024 - the DRFA acquittal date. The contract will not exceed $2,100,000.00 GST
exclusive.
RECOMMENDATION
That Council award Contract number 2122Q125 to Erscon Engineering Consultants
(Erscon), under Section 234 – Exception for LGA arrangement, of the Local Government
Regulation 2012, to provide Project Management Services to lead the Disaster Recovery
Funding Arrangements (DRFA) activities as per the guidelines outlined by the Queensland
Reconstruction Authority (QRA), for a term of 27 Months to the (maximum) value of
$2,100,000.00 GST exclusive as follows:
A. $2,000,000 for Project Management services that will exist until the DRFA acquittal
date of September 30, 2024. These costs will be recoverable under the guidelines of
the DRFA so Council will not have to fund this cost; and
B. $100,000 for submission administration that will exist until the DRFA acquittal date of
September 30, 2024. These costs are not recoverable under the guidelines of the
DRFA and will need funding by Council. It is proposed that the Disaster Management
Reserve restricted cash be used to fund this activity.
REPORT
1. Project Background
The management of the Alpha22 event for the phase during and immediately after Counter
Page 7 of 96
Section 8
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Disaster Operations (CDO) & Emergency Works (EW) are due for completion by 3 June 2022
and the application for reimbursement via the DRFA is due 30 September. The following
activities are underway:
There were over 500 work orders raised which are being managed accordingly.
Progress in completing work orders is on track with no major risk to cost recovery as
per the guidelines.M
Erscon were highly engaged in leading activities and implementing protocols that will
ensure that Council are likely to receive the highest cost recovery compared to prior
disaster events.
The next phase of the DRFA program is the reconstruction and resilience phase. There are
several different funding streams applicable during this phase:
Reconstruction of Essential Assets (REPA) Category B: which focuses on returning
essential assets to the standard they were prior to the event. Funding for these areas
is included in the original request made to QRA for DRFA. For Council this includes
sites such as Black Mountain Road Landslip.
Reconstruction of Essential Assets (REPA) Category D: which focuses on
reconstruction of assets to a more robust level or improving assets not included in the
essential asset definition. Funding for these areas is a separate funding arrangement
that will be announced by end of May 2022. This could include repatriating the Noosa
Trail network, especially the Blackpinch Trail landslip.
To comply with the DRFA guidelines, the scope of work that Council needs to undertake to
reconstruct the sites and meet the DRFA guidelines to the standard expected of QRA is
significant.
In general, the scope includes:
a. QRA Submission preparation
On site damage assessments and collection of supporting evidence (photos,
etc.).
Preparation of damage scope with a Registered Professional Engineer of
Queensland review for current engineering standards, including population of
scope forms to QRA requirements.
Upload and verification of submission to MARS portal.
Infield assessment with compliance and Value for Money QRA teams, including
any formal responses for queries raised.
b. Project Management - REPA Cat B (Reconstruction)
Scope verification based on approved scope and negotiations with QRA.
Procurement support including contract documentation, tender assessment and
recommendations.
Preparation of market price update submission including lodgement via the
MARS portal.
Contract administration.
Superintendency and site-based inspections (works supervised by RPEQ).
Monthly project and submission reporting to QRA guidelines.
Acquittals.
c. Betterment & Resilience – REPA Cat D
Identification of potential project scope which will meet the QRA requirements
including initial assessment of cost/benefit ratios with likely REPA scope.
Development of scope with RPEQ review.
Submissions, lodgement and verification of scope and cost information through
MARS portal.
Reporting to QRA guidelines.
Acquittals.
Page 8 of 96
Section 9
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
All scope above is recoverable using the DRFA, except the QRA submission preparation.
The consultant has offered a capped fee of $100,000 to execute this work and it will be
costed based on the approved rate card and actual hours.
The contract is based on a schedule of rates methodology and only actual work and
authorised expenses will be invoiced. This is a typical contract methodology for works such
as these. The sites are still in identification phase and each site has varying treatment plans
of varying cost. This is supported by the DRFA process where QRA approve Council project
budget based on an estimated value (EV) and then require reporting monthly to track
variances through to the final acquittal stage in September 2024.
The reconstruction project consists of the following stages:
Stage Description Timing Status Forecast Cost to Date
Cost
Counter Disaster Establishing and Feb 2022 – 65% n/a $123,052.50
Operations and leading execution of Sept 2022
Emergency Works protocols to improve
recovery of costs
Urgent action for Coordination of April 2022 – 50% Not to
high value, high necessary June 2022 exceed
risk sites (HVHR) engineering $180,000
assessment for sites
such as Black
Mountain Rd
landslip
REPA – Cat B/D Planning, Design April 2022 – 0% Not to For Approval
Planning & Design and costing in Mar 2023 exceed
preparation of $2,000,000
submission to QRA
Reconstruction All necessary work June 2022 – 0% For Approval
work to return/improve June 2024
asset to standard
QRA Submission Data collation and May 2022 – 0% $100,000 For Approval
preparation lodgement of June 2024
application
Total to Date to not exceed $303,052.50*
Total for this request $2,100,000
*Engagement of Erscon for the Emergency component of works was also under Section 234 of the LG Regulation
2012.
2. Budget
The majority of this project will be funded by the DRFA. The table below outlines what
DRFA has funded to date as well as forecast funding.
Program Funding Comments Amount Funding
Source
Disaster operations and Cash advance to assist Council cash flow $1,000,000 DRFA
Emergency works for the. This needs to be acquitted against
the MARS application due 30 September
2022
Page 9 of 96
Section 10
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Program Funding Comments Amount Funding
Source
REPA – Recovery Cash advance to assist Council. The $1,000,000 DRFA
funding actual costs need to be acquitted against
the MARS application due 30 September
2022
REPA – Clean-up $30,000,000 DRFA
funding (Share across
nominated
LGAs)
REPA Cat B Reconstruction works to recover essential Estimated DRFA
assets to prior standard. The list is still in $20,000,000 -
progress, but the latest listing can be $30,000,000
found in the Appendix.
QRA are aware of this value and are
encouraging the consultant and
Council to continue work towards
submission.
REPA Cat D Work that improves resilience to the Yet to be DRFA
community. determined
Funding has not yet been approved
but funding has been made available
in every other prior disaster.
Consultant Fees Erscon Engineering Consultants to lead Not to exceed DRFA
Council activities related to reconstruction, $2,000,000
resilience, and betterment.
Consultant Submission Erscon Engineering Consultants to lead Not to exceed Council
Preparation Council submission and acquittal of cost $100,000
recovery for reconstruction, resilience, and
betterment.
Estimated Budget required to be funded by Council $100,000
Note that the Consultant Submission Preparation is the only element that the DRFA will not
fund. However, this activity is a key attribute for Council to ensure maximum opportunity to
recover cost of reconstruction, resilience and betterment. Having the consultant undertake
this work based on their prior experience and knowledge of approved projects with QRA
increases this opportunity. The $100,000 represents good value on the following basis:
a. A cost of $100,000 to recover this cost represents a value for money outcome for
Council as it equates to only 0.03% - 0.05% of the total estimated cost of $20,000,000
- $30,000,00.
b. Erscon are experienced at working using acceptable methods that ensure actions that
crossover between submission work and investigation are suitably allocated.
Example includes where Erscon are investigating a site and possible plan, they will
take necessary photos to help develop the scope (cost recoverable from DRFA).
These photos are then required for the submission but as they were sourced during
investigation they are reused and therefore are not allocated to preparation cost, saving
contribution towards the $100,000 Council expense.
As this is resulting from a disaster, there was no budget allocated to fund this engineer project
management work.
Page 10 of 96
Section 11
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
It is recommended that Council endorse the use of the Disaster Management Reserve
restricted cash to progress this $100,000 work as an out-of-budget funding allocation.
3. Procurement
a. The original engagement of Erscon for emergency works was in accordance with
section 234 of the Local Government Regulation 2012 – ‘A local government may
enter into a contract for goods and services without first inviting written quotes
or tenders if the contract is entered into under an LGA arrangement’.
b. In consultation with the Procurement Branch, Erscon Engineering Pty Ltd
(Erscon) were directly sourced in February 2022 via Local Buy Arrangement BUS
262-0317 Engineering and Environmental Services (LGA arrangement), to
undertake work in leading our counter disaster activity.
c. For the services proposed under this report it is proposed that Erscon be
engaged under LGA arrangement – Local Buy LB279 Project Management
Services (Civil Infrastructure).
d. An Invitation to Quote (ITQ) was issued to Erscon under the above LGA
arrangement on 22 April 2022.
o A subsequent review of the offer from Erscon demonstrates that the
schedule of rates and project methodology that matches the expected
criteria set out in the Tender. This offers Council a high confidence of
quality outcome by way of recovery of reconstruction costs from DRFA.
o A Probity Plan has been approved by Infrastructure Services which outlines
suitable justification along with confirmation of no conflicts of interest.
e. The option to seek multiple/competitive quotations for these services would result
in delay along with a loss of recently learnt information about Council essential
assets that require reconstruction.
f. Additionally, the ability to secure similar services at this point post the flood event
would be at risk due to the demand for services across multiple councils and
Government agencies.
g. Infrastructure Services now seeks to engage Erscon directly to project manage the
reconstruction of essential assets within Noosa Shire Council. Further to this,
Erscon are to advise and where approved, execute construction works that provide
a more resilient asset outcome for Noosa Shire Council. For all projects, Erscon
must ensure funding opportunities using the DRFA are maximised and no works
will be undertaken without a cost recovery plan being approved.
4. Direct Source Justification
a. Value for Money by reducing risk exposure
Erscon has already been contracted to work in these key areas undertaking
some of Counter Disaster activities and Emergency Works actions. If Council
does not engage Erscon, the ability to engage a suitable supplier of
equivalent experience is very low.
A market scan indicates that other notable disaster recovery suppliers have
taken contracts elsewhere or are large infrastructure suppliers focused on
more substantial projects such as single sites totalling $30,000,000.
A delay in engaging a supplier is likely to impact on the completion of the
program of work, compromising the deadlines set by QRA for submission
and then final acquittal. There are over 20 sites requiring treatment over
the next 24 months.
The supplier is continuing to work at the original rates, despite opportunity
Page 11 of 96
Section 12
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
to charge a premium due to the increase in value of their services in the
marketplace.
Given the work to date in the Black Mountain Road area, Erscon are very
familiar with the local residents and have developed a positive rapport that
Council can continue to leverage.
Using a Sunshine Coast based supplier benefits the contract with Noosa
Council as the supply of services will be reduced to lower travel costs and
very little/no accommodation costs.
Erscon have already demonstrated a working methodology to reduce the
administration cost by undertaking work during the Emergency Works
phase making sure the administration is reduced.
b. Development of competitive local business and industry
The recommended supplier is based in the Sunshine Coast Council region
and have indicated that this work provides local employment opportunities
within the wider region.
Erscon have committed to working with Council on finding opportunities to
support local suppliers throughout the design and construction phase of the
projects. They provided evidence of how this was achieved on other
projects in other regions.
c. Open and effective competition
Erscon were placed on Local Buy Arrangement LB279 Project Management Services
(LGA arrangement) as a result of an open/public tender process conducted by Local
Buy, constituting an LGA Arrangement under the Local Government Regulation 2012.
Finance
The estimated costs of the $2,000,000 of Project Management fees consultant are funded
by DRFA.
The only cost to Council will be the non-recoverable portion of the estimated cost of
$100,000, which is proposed to be funded from the Disaster Management Reserve.
Risks & Opportunities
Finance Risks Mitigation
Unrecoverable costs are Contract KPI will include a target of 100% of costs must be
encountered within the DRFA guidelines and cost fully recoverable
Program costs exceed the Consultant reporting cadence includes a monthly report
Estimated Value approved by QRA forecasting next three months and confirming actuals for
prior month.
This also falls in line with DRFA guidelines to ensure
variation management prior to final acquittal in September
2024.
Timing Risks Mitigation
Delays to Contract Award affecting Contract Award and contract documents transmitted to
the ongoing work consultant has contract as soon as Contract award is approved.
been conducting.
ensure consultant can have
suitable time to develop the
planning for over 20 sites
and have applications
Page 12 of 96
Section 13
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
submitted before DRFA
deadline of 30 March 2023.
The sooner Council has the
contract executed, the
sooner application,
approval and
commencement of works
can occur at high-risk sites
such as Black Mountain Rd
landslip.
Contract award is
recommended to occur as
soon as possible in order for
the consultant to not move
onto other clients.
o They have rejected
Sunshine Coast
contract in favour of
Noosa Council
o With rain event
occurring 9 May, prior
client Mt Isa will be
looking to secure
services.
Safety Risks Mitigation
Erscon fail to meet safety standards Erscon are appointed as Principal Contractor responsible
or conduct work safely for workplace health and safety for each site.
Erscon are to submit to Council necessary management
plans, Safe Work Method Statements, Job Hazard
Analysis 9or similar) and other documents as required.
Ongoing surveillance by Council will be undertaken during
the construction period.
Scope & Quality Risk Mitigation
The contractor fails to construct the ERSCON is highly skilled and highly experienced in work
scope of work to the minimum in relation to disaster reconstruction, especially in the area
standard. of road recovery.
The workmanship will be monitored with regular Council
surveillance.
Resource Risk Mitigation
Availability of necessary sub- Erscon have already demonstrated in the prior contract
contractors due to market activity their ability to attract quality sub-contract suppliers.
from affected LGA’s at the same
Noting the scale of this project Council is planning for a
time.
dedicated resource (Disaster Recovery Consultant) to
assist during the outset of this project to provide project
management, procurement support, surveillance and
contract administration support.
Whilst it is possible to utilise Council internal resources,
22/23 and 23/24 already has large infrastructure programs
to deliver which reinforces a need for external support.
Page 13 of 96
Section 14
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Procurement Risk Mitigation
Generally a contract of this value The engagement of Erscon is made under an exception of
would be awarded as the result of the Local Government Regulation 2012.
Public Tender process.
Erscon’s appointment to the LGA arrangement was via an
open/public tender process.
Council accepts there are other providers of project
management services, the justification to target the
procurement of a highly regarded niche supplier of
disaster recovery Project Management is outlined in this
document provides suitable information to proceed.
Consultation
External Consultation - Community & Stakeholder
Whilst not a part of the core scope for Erscon, they have demonstrated their commitment to
Council by positively representing Council within affected communities. The Black
Mountain Road landslip community have been appreciative of the hands-on approach from
Erscon. Examples include:
Reinforcing Council communications whilst talking informally with community members
One on One discussion with landowners about need to enter private property or cut
trees etc to assist geotechnical works.
Care Package to family recently impacted by a household burn incident resulting in
ambulance attendance and hospital visit.
QRA representation has been highly engaged and have directly worked with Erscon to visit
sites to better understand the impacts to the Noosa community and provide feedback.
Internal Consultation
Departments/Sections Consulted:
Chief Executive Officer Community Services X Corporate Services
Executive Support Director X Director
Community Development Financial Services
Community Facilities Fleet
Libraries & Galleries ICT
Local Laws X Procurement
Waste & Environmental Health Property
Revenue Services
Executive Services Environment & Sustainable Development X Infrastructure Services
Director Director X Director
Community Engagement Building & Plumbing Services Asset Management
Customer Service Development Assessment Buildings and Facilities
Governance Economic Development X Civil Operations
People and Culture Environmental Services Disaster Management
Strategic Land Use Planning Infrastructure Planning,
Design and Delivery
Page 14 of 96
Section 15
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
ATTACHMENT 1
2122Q125 – CONTRACT FOR PROJECT MANAGMENT SERVICES FOR 2022 FLOOD
RECOVERY AND RECONSTURCTION
Current sites nominated for REPA Cat B submission for reconstruction:
Black Mountain Road Eastern Branch Road
Black Pinch Road Murrays Road
Andersons Road Railway Road
Bakers Road Simpsons Road
Beach Tree Creek Road Upper Pinbarren Road
Coles Creek Road Schribers Road
Cooroy Belli Creek Road Sister Tree Creek Road
Cootharabara Road Golden Gully Road
These sites consist of a variety of treatment of roads such a re-sheeting, reshaping drains,
reconstruct kerbs etc, treatment of landslips, treatment of road crossing over water and reinstate
suitable road furniture such as guardrails and signage.
Page 15 of 96
Section 16
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
6 MCU21/0151 – APPLICATION FOR MATERIAL CHANGE OF USE –
TELECOMMUNICATIONS FACILITY SITUATED AT 25 RAILWAY PDE, POMONA
Author Development Planner, Lisa Pienaar
Environment and Sustainable Development Department
Index ECM/ Application/ MCU21/0151
Attachments 1. Proposal Plans
APPLICATION DETAILS
Applicant Telstra Corporation Limited
Proposal Material Change of Use - Telecommunications facility
Properly Made Date 24 September 2021
Information Request Date 5 October 2021
Information Response Date 24 December 2021
Decision Due Date 6 May 2022
Number of Submissions 1
PROPERTY DETAILS
Property Address 25 Railway Pde Pomona Qld 4568
RP Description Lot 1 RP 147703
Land Area 2537 m²
Existing Use of Land Telecommunications facility with exchange building
STATUTORY DETAILS
SEQRP Designation Urban Footprint
Zone Low Density Residential
Precinct Not applicable
Local Plan Area Pomona
Overlays Bushfire (Potential impact)
Assessment Type Impact
EXECUTIVE SUMMARY
The proposal is for a Telecommunications Facility, which comprises a satellite dish and
associated ancillary items to be co located on a site with an existing exchange building
currently used for the Telstra network. The proposed satellite dish is to be located at the
south western corner of the site at a maximum height of 2.35 metres.
The proposal is before Council, as the proposed use is an inconsistent use in the Low Density
Residential Zone under the Noosa Plan.
The proposed use is minor in nature and co-located with existing infrastructure and can be
conditioned to comply with the amenity and character elements in the Noosa Plan. The
proposal is recommended for approval.
Page 16 of 96
Section 17
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
RECOMMENDATION
That Council note the report by the Development Planner to the General Committee Meeting
dated 16 May 2022 regarding Application No. MCU21/0151 for a Development Permit for
Material Change of Use - Telecommunications Facility situated at 25 Railway Pde Pomona
and:
A. Approve the application in accordance with the following conditions:
When Conditions Must Be Complied With
1. Unless otherwise stated, all works required by the conditions of this Decision
Notice must be completed prior to the use commencing, and then compliance
maintained at all times while the use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Plan No. Sheet Plan/Document Name Date
No.
QC100259 S0 Site specific notes, prepared by Telstra 18.06.2021
QC100259 S1 Site Layout and Access, prepared by Telstra 18.06.2021
QC100259 S1-1 Site Layout, prepared by Telstra 18.06.2021
QC100259 S1-2 Site Setout Plan – Option 1, prepared by Telstra 18.06.2021
QC100259 S3 East Elevation, prepared by Telstra 18.06.2021
QC100259 G4 Site Earthing – Option 1, prepared by Telstra 18.06.2021
QC100259 G4-1 Earthing Scenario 3, prepared by Telstra 18.06.2021
QC100259 G4-4 Trench Details, prepared by Telstra 18.06.2021
QC100259 E2 AC Power Connection, prepared by Telstra 18.06.2021
QC100259 T2 Concrete Foundation Details, prepared by Telstra 18.06.2021
QC100259 T2-1 Equipment Platform – H Frame Detail, prepared by 18.06.2021
Telstra
QC100259 T8 Compound Fence and Gate Details, prepared by 18.06.2021
Telstra (as annotated by Council)
501-PL A Landscape Concept Plan, prepared by Urbis 21.12.2021
Nature and Extent of Approved Use
3. The maximum height of the satellite dish must not exceed the maximum height
as reflected in the approved plans with respect with the finished ground level and
the natural ground level.
4. No lights are permitted to be attached to the telecommunications facility, except
where required for hazard lighting purposes or similar.
Currency Period
5. The Currency Period for this development approval lapses if the use has not
happened by 19 May 2028, unless an application to extend the currency period
is approved by Council.
Health and Safety
6. The development must not, at any time during the life of the development, result
Page 17 of 96
Section 18
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
in human exposure to environmental electromagnetic emissions exceeding the
current regulations, standards and/or recommendations of the Australian
Radiation Protection and Nuclear Safety Agency (ARPANSA). The carrier of the
infrastructure must provide, at any time upon request by Council, written
certification to demonstrate compliance with this condition. The written
certification must assume:
a. a maximum number of users over the lifetime of the structure;
b. full power usage;
c. a maximum down tilt of antennae.
Colours and Finishes
7. The development must be finished in pale eucalypt or the like in order to visually
blend into the landscape.
8. Associated fencing (and gate) as shown on the approved plans must be visually
unobtrusive and must be camouflaged through the use of colours, materials and
screening vegetation to blend the fence into the visual landscape.
Site maintenance
9. The site must be kept tidy and well maintained at all times for the life of the
development.
Cessation of Use
10. The facility must be removed from the site upon cessation of the use.
Noise
11. Written certification is required from a suitably qualified person confirming that
sound pressure levels from all mechanical plant and equipment comply with the
following:
a. Air-conditioning and equipment
7am to 10pm: Maximum level allowable = background + 5dB(A)
10pm to 7am: Maximum level allowable = background + 3dB(A)
12. The certification must be submitted to Council, which certifies that operational
noise from any fixed plant and equipment complies with the requirements of this
Decision Notice.
Vegetation Retention
13. Existing trees on the site must be retained, except where required to be removed
to accommodate the approved use.
14. Existing vegetation in the road reserve must be retained, unless written
authorisation from Council is granted for the clearing.
Landscaping Works
15. The development site must be landscaped generally in accordance with the
approved plans and include additional landscaping to enhance the amenity of the
site. The works must be undertaken in accordance with an Operational Works
approval and the Noosa Plan and Planning Scheme Policy PSP2 - Landscaping
for the Pomona area and must include in particular:
a. the works shown on the approved Landscape Concept Plan, and in addition
include the following:
i. 1 x 45L pot size street tree per 8m of road frontage (minimum 7
Page 18 of 96
Section 19
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
trees); and
ii. Screen planting (minimum 20L pot size) along all boundaries planted
at maximum 3 metre centres with a maximum 3 metre height at
maturity.
16. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed
to grow to full form and be refurbished when its life expectancy is reached.
17. The site must be regularly maintained at all times with all landscape works
maintained generally in accordance with the approved design for the life of the
development.
Damage to infrastructure
18. Any damage to footpaths, street plantings, natural vegetation/trees kerb and
channel, bridges or roadways must be repaired or reinstated to at least pre-
existing conditions.
Stormwater Drainage
19. Stormwater runoff from the development must be disposed of on-site without
causing scour or damage to the subject site or any adjoining property.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
C. Advise the applicant to remove the demountable building (the former exchange
building) or obtain building approval within 90 days of the date of this approval.
D. Find the following matters relevant to the assessment and sufficient reason to approve
the application:
1. The proposal is minor in nature and is co-located within a site with existing
telecommunication facilities.
2. The proposal can be conditioned to comply with the amenity and character
elements sought by the Overall Outcomes in the Noosa Plan 2020.
REPORT
1. PROPOSAL
The proposal is for a satellite dish and associated ancillary items to be co-located on a site
with an existing exchange building currently used for the Telstra network. Ancillary items
include the installation of a moon foot platform with associated cabinet with an external aircon
unit, cabling and fibre run, and a small fenced compound measuring 7620mm x 3660mm at
a height of 1800mm. The proposed satellite dish is to be located at the south-western corner
of the site at a maximum height of 2.35 metres. This area of the site will be fenced. Refer to
Figure 1 & 2 for the locality and site view and Figures 3, 4 & 5 for proposal plans.
Page 19 of 96
Section 20
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Figure 1 – Locality
Figure 2 - Street View
Page 20 of 96
Section 21
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Figure 3 – Site Plan
Figure 4 – Plan view
Page 21 of 96
Section 22
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Figure 5 – Elevations
2. SITE DETAILS
2.1. Background
The site is currently used as a telecommunication facility and has been operational since
before 1990. The facility has existing use rights to operate as such.
Council’s records indicate that building approval was obtained on 19 February 1991 for the
existing exchange building. The site plan provided with that application was annotated
identifying the demountable building was the former exchange building and would be
removed once the new exchange building was constructed. Refer Figure 6 – site plan for
exchange building. This structure was never removed. It is also noted that no building
approval for this structure can be found through Council’s Building Department.
Figure 6 – site plan for exchange building
It is therefore recommended that the applicant be advised to remove the demountable
building or obtain the relevant building approvals within 90 days of the date of the approval.
Page 22 of 96
Section 23
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
With regard to application timeframes, decision was due 6 May and the applicant was asked
if they would agree to extend the decision-making timeframes until 19 May to allow the
application to be considered by Council. At the time of finalising the report, Council officers
had not received a response to this request.
2.2. Site Description
The site is relatively flat and is a corner allotment with an extensive frontage to Railway
Parade. An existing exchange building is located at the south eastern corner, which has
emergency generator and equipment rooms, lunchroom and amenities. An unloading area
and parking area is adjacent to and near the exchange building. A demountable building,
which was the former exchange building, is located towards the middle of the site and near
the western boundary.
The site is turfed, but has minimal existing vegetation with the exception of the mature
vegetation in the south eastern corner of the site. Two rural driveways access the site from
the east and the north.
2.3. Surrounding Land Uses
The site is situated within an existing and established residential area situated north of the
Pomona township. The North Coast Railway line is located to the west of the site and
dwellings adjoin the site to the south and west.
3. ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
State Planning Policy;
South East Queensland Regional Plan;
Planning Regulation 2017;
Noosa Plan 2020.
3.2. State and Other Statutory Instruments
State Planning Policy
Noosa Plan 2020 is generally consistent with the State Planning Policy July 2017 (SPP) and
the SPP raises no further issues relevant to the proposed development.
South East Queensland (SEQ) Regional Plan
The site is located within the Urban Footprint of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.
Planning Regulation 2017
The proposal is for urban activity within the Urban Footprint and is consistent with the
assessment benchmarks contained in the Planning Regulation 2017 for the SEQ Region.
3.3. Statutory Instruments – Planning Scheme
The application must be assessed against the whole of Noosa Plan 2020 to the extent the
provisions are relevant to the development. The following codes are particularly relevant:
Density Zone Code;
Hinterland Villages Local Plan Code;
Infrastructure Utilities Code; and
Works Codes.
Page 23 of 96
Section 24
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Locality Provisions
The subject site is located in Pomona and is zoned Low Density Residential. The proposed
use is identified as an inconsistent use with the zone and is required to follow an impact
assessable application process.
The proposal does not provide for housing in a zone intended to provide for housing, but is
recognised as being minor in nature on a site currently being used as a telecommunications
facility. The pertinent issues arising out of the assessment are discussed below.
Proposed use
The applicant’s consultant advised there are approximately 100 of these types of sites being
rolled out across the country, with a standard design needed. Each site does require a slightly
different angle to catch the signal from the satellite in the sky. The angle that the dish is
pointed at can change the height slightly and 2.5 metres was provided in our standard
drawings to cater for all sites and to include the maximum height. The settled angle for this
particular site/facility creates a maximum height of 2.35m. The new facility will be fenced off.
The key Overall outcomes (2) of the Low Density Residential zone code that relate to this
development are as follows:
a) Low density residential neighbourhoods are home to permanent residents with minimal
impact of visitors.
b) The character of low density residential neighbourhoods varies due to factors such as
proximity to centres, topography, lot sizes, the established vegetated character, the
age of development and open space provision.
c) The distinct look and feel of existing residential neighbourhoods is retained, and
development makes a positive contribution to the streetscape, maintaining the low
density and low scale character.
d) Predominantly detached housing on a range of lot sizes meet the needs of different
households.
The key Overall outcomes of the Hinterland Villages Local Plan code that relate to this
development are as follows:
b) Development within each village is consistent with the identified character and of that
particular community.
d) Development is sited and designed to protect ecologically important areas and retain
landscape and built form elements, including significant views and vistas that contribute
to the setting, character, identity, sense of place and connections to the past. Valued
elements include… Mt Cooroora…
e) Development retains and enhances:
i. the small scale rural or lakeside character and built form elements;
ii. the inherent agricultural, cultural, heritage and natural environmental values; and
iii. surrounding landscapes and scenic amenity.
The intent of the Low Density Residential zone is to provide for low density housing. The
existing and proposed use does not provide for housing and thus cannot comply with Overall
outcomes (2) a) and d). The site is a recognised telecommunications facility and has been
used as such for over 40 years. The proposal is to locate additional infrastructure to the site
and is minor in nature. Appropriate conditions to ensure compliance with other relevant
Overall outcomes in the Low Density Residential zone and Hinterland Villages Local Plan
codes is discussed in more detail below.
The key overall outcomes of the Infrastructure Activities code that relate to this development
are as follows.
Page 24 of 96
Section 25
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
b) Infrastructure activities are visually integrated with their natural, rural or urban setting
and do not adversely affect the amenity of the major road network, surrounding
sensitive land uses or the rural or residential amenity enjoyed by residents
and visitors to Noosa.
c) Infrastructure activities do not adversely impact upon community wellbeing and does
not pose a threat to public health and safety.
d) Where practicable, infrastructure activities are integrated and co-located with other
compatible uses and facilities.
e) The design of infrastructure activities incorporates convenient and safe access to the
facility.
The proposed satellite dish and housing is to be integrated into a site that is a recognised
communications facility and is considered to not adversely impact upon community wellbeing
and is appropriately designed and therefore complies with Overall outcome (2) c) & d) of the
Infrastructure Activities Code.
Two rural driveways access the site from the east and the north. It is understood both access
points are required to accommodate some heavy vehicles that can safely exit the site in a
safe manner, which complies with Overall outcome e) of the Infrastructure Activities Code.
The applicant provided a landscaping concept plan that provides screening to the proposed
infrastructure and some to the existing exchange building. Refer to Figure 7 – Landscaping
Concept Plan.
Figure 7 – Landscaping Concept Plan
The entire site and existing infrastructure is highly visible from the street, and overall the site
presents as a utility site situated in a residential area, and is considered to make little
contribution to the character of the area. Therefore, in order to meet the character and
amenity elements in the Overall outcomes of the relevant codes, enhance the green back
drop to Mt Cooroora, and improve the aesthetics to the street and adjoining property, it is
recommended that additional planting and street trees be conditioned to screen the
infrastructure from the street and surrounding property.
The proposed infrastructure meets the setback requirements under the Infrastructure
Activities Code and the recommended landscaping will meet the amenity and character
requirements under the relevant Codes in Noosa Plan.
Page 25 of 96
Section 26
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
4. CONSULTATION
4.1. Referral Agencies
Not applicable
4.2. Internal Council Referrals
Not applicable
4.3. Public Notification
The application was publicly notified for fifteen (15) business days in accordance with the
Planning Act 2016. One properly made submission was received. The following table
provides a summary and assessment of the issues raised by the submitter.
Matters Raised Comments
No objection to the proposal. The 2 buildings on site are older and not
particularly aesthetically pleasing. However, the
Request that the site be maintained, as the
proposal is for a new satellite dish with no
block is often unkempt.
changes proposed to the existing buildings.
The existing structures on site should be Therefore, it does not seem reasonable to require
refurbished to improve aesthetics. an upgrade to the existing buildings.
The whole site should be landscaped. Extensive landscaping is recommended for the
entire site, which will screen all structures from
the street and adjoining property, which will
greatly improve site aesthetics.
5. CONCLUSION & REASONS FOR DECISION
Although the proposal is not consistent within the Low Density Residential zone, the proposal
is minor in nature and is co-located within a site that is a recognised telecommunication
facility. It is recommended the site be extensively landscaped, which will improve the site’s
amenity considerably.
The proposal is recommended for approval, including reasonable and relevant conditions to
ensure compliance with the amenity and character provisions in the Noosa Plan 2020.
Departments/Sections Consulted:
Chief Executive Officer Community Services Corporate Services
Executive Support Director Director
Community Development Financial Services
Community Facilities Fleet
Libraries & Galleries ICT
Local Laws Procurement
Waste & Environmental Health Property
Revenue Services
Executive Services x Environment & Sustainable Development Infrastructure Services
Director x Director Director
Community Engagement Building & Plumbing Services Asset Management
Customer Service x Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture Environmental Services Disaster Management
Strategic Land Use Planning Infrastructure Planning,
Design and Delivery
Page 26 of 96
Section 27
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Attachment 1
Page 27 of 96
Attachment 1
a §
Qe
g
i [STE REFERENCE DETATS |
- Lt TF s—SSFEOTT—OSid 6
: SITE SPECIFIC NOTES ee SITE REFERENCE DETAILS
doa OCCUPIER | SITENAME
4 EQUIPMENT PLATFORM WORKPLACE HEALTH & SAFETY Ee
yO POMONA EXCHANGE 18392
gS TYPE: PROPOSED STEEL 'MOON' PLATFORM, ASBESTOS CONTAINING MATERIALS WERE IDENTIFIED PMN
ae SIZE (mm): APPROX. 915 x 120mm. DURING INSPECTION & DESIGN STAGES, SUBSEQUENTLY RFNSA GITE NUMBER - 4568008
Fo BASE TYPE: STEEL BASE PLATE. CONFIRMED BY REVIEW OF THE TELSTRA REGISTER OF ‘STRUCTURE GWNER.- TELSTRA
5 ASBESTOS MATERIALS. ALL NECESSARY CONTROLS WILL
EARTHING NEED TO BE IN PLACE DURING THE CONSTRUCTION PHASE
c EARTHING TO CONTROL THIS IDENTIFIED HAZARD,
REQUIREMENT FOR EARTH NETWORK WITHIN SAN SERVICES LEGEND
COMPOUND PLUS AN INTERCONNECTION FROM SAN TO THE GENERAL NOTES ——_
TELSTRA ACTIVE EARTH. ee —— rr OPTICAL FIBRE ABOVE GROUND
REFER TO SHEET Gé4 FOR SITE SPECIFIC EARTHING DETAILS 4, ALL DIMENSIONS ARE IN MILLIMETRES UNLESS SPECIFIED — —— r+ — — F— OPTICAL FIBRE BELOW GROUND
AND EARTHING GUIDELINES. OTHERWISE. —— p— P— ABOVE GROUND ELECTRICAL SUPPLY
2. BIRD PROOFING - CABLES AND ALL ACCESS POINTS ON THE — — — p— — — p— BELOWGROUND ELECTRICAL SUPPL
ENVIRONMENTAL ISSUES STRUCTURE MUST BE BIRD PROOFED IN ACCORDANCE WITH Sg 8 es VOLTAGE ELbornoar SUPeLY
THE METHODS SPECIFIED IN DOCUMENT NO, 003615 EXTERNAL — — w — ww —
SST OAC aL PLANT STANDARDS FOR MOBILE BASE STATIONS, SECTION 6.3.3 —w—w—w—w—w— WATER SUPPLY ABOVE GROUND
NESTING BIRDS: OSPREY ETC. FOR QUEENSLAND, ALL FEEDERS ARE TO BE BIRD PROOFED WHEN — — — w— — — w— WATERSUPPLY BELOWGROUND
DANGEROUS SNAKES, WASPS & SPIDERS ETC. INSTALLED: —— —s—— — s— SEWERLINE
MENACING CATILEETS. 3, SERVICES, WHERE SHOWN ARE INDICATIVELY ONLY, LOCATION OF —— — — sw—— STORMWATER
ALL RELEVANT EXISTING SERVICES SHALL BE IDENTIFIED AND —— re ——— re —— ABOVE GROUNDFEEDER CABLES
POWER SUPPLY CONFIRMED PRIOR TO COMMENCING WORK. THE CONTRACTOR TO — — — rm — — — Fr — BELOWGROUND FEEDER CABLES
LIAISE WITH RELEVANT AUTHORITIES FOR DIRECTIONS AND a —— — es — EARTHSTRAP
S2AMP SUPPLY SHALL BE TAKEN FROM EXISTING PERMITS REQUIRED.
EXCHANGE MAIN SWITCHBOARD. PROPOSED SUPPLY DIAL BEFORE YOU DIG 1100, . . ea ee
‘AND TAKE OFF POINT SHALL BE CONFIRMED WITH —— —£ —— — £ — BELOWGROUND 35mm EARTH
K_] RELEVANT TELSTRA STAKEHOLDERS PRIOR TO ANY 4, CONSTRUCTORS ARE TO BE AWARE OF TELSTRA DOCUMENT Ny
CONSTRUCTION WORKS. 007338-C8-11 AND IN PARTICULAR CLAUSE 7.3 & 10.3 WHICH
DESCRIBES REQUIREMENTS PERSONNEL MUST UNDERTAKE IN @— EXISTING TELSTRA ANTENNA SECTOR
DIAL 1100 BEFORE YOU DIG. RESPECT TO ASBESTOS MANAGEMENT AT TELSTRA FACILITIES. M
5, PROPRIETARY PRODUCTS SHALL BE INSTALLED IN ACCORDANCE WITH «a >) PROPOSED TELSTRA ANTENNA SECTOR
PROPERTY SIGNAGE MANUFACTURERS SPECIFICATIONS. re
SEECIEY FIRE RLY kG ar Ss PER DOGUMEN LUI {O0dA2, 8. COMPOUND SHALL BE ORIENTATED TO SUIT SITE-SPECIFIC REQUIREMENTS &
PROPERTY SIGN INCLUDES RFNSA SITE NUMBER.
Gir GUE-SEAAPRD OTE DONTRICATION RAGLLARCIOSS ANTENNA AZIMUTH, REFER TO SITE-SPECIFIC COMPOUND LAYOUT DRAWING.
TELSTRA SA NUMBER 187700929,
7. COMPOUND SHALL BE STRIPPED OF ALL VEGETATION & TOPSOIL. COMPOUND
SADSG EARL RUMEER:TEMSEZe SHALL BE FINISHED WITH A LAYER OF GEOTEXTILE UNDERLYING MIN. 100mm
LAYER OF COMPACTED ROADBASE OR 20mm AGGREGATE.
SITE ACCESS
VIA RAILWAY PARADE
REFER TO SHEET St
SITE S.A. TO ADVISE C.D.C, LOCATION DETAILS.
STeSoMee FOR CONSTRUCTION
beet A eran alice 81883. TO BE READ IN CONJUNCTION WITH SHEETS 81, S1-1 & $3,
, (ORDER [DRAWN cHKD [AMENDMENT =| EXAM | APD | DATE _| 88) €elstra
183929 JM FOR CONSTRUCTION - SPaI0S457}#OO1SDOWN - SATELLITE 78,06,21 [0.1
COMPLIANCE BOX SATELLITE ACCESS NODE SITE 183929
POMONA EXCHANGE
COMPLETED AS PER DESIGN [ SITE SPECIFIC NOTES F
an i a IN RED oO 25 RAILWAY PARADE, POMONA, QLD 4568
sie ce [Sra capri RENTS Agree’ QC 100259
I. _ NZ —ssC“*“‘sSNC~=é“‘y#yySSd=EDNNNNNNNSV aT A
The coomahl and ownerehin of this drewing is eesianed fo Teirire and must not be consed or saved skewwhore without wriken permission from Tebrine.
Page 27 of 96Section 28
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Page 28 of 96
<9
Ooo
a
2 1 LN 6
pa
s@) ™ RENSA SITE No. 4568008
39 AY pee i si ro
nN Pa nt reer
5 Ate,
5 1 1 1 9 3 1685 577 59 36 32 OP
5 1 1 1 9 4 1766 592 10 15 52 os
5 1 1 1 9 5 2303 565 39 12 54 a
5 1 1 1 9 6 2474 572 35 29 17 iS
5 1 1 1 9 7 2673 574 32 42 46 ae
4 1 1 1 10 0 497 591 2270 53 -1
5 1 1 1 10 1 497 597 52 31 68 a8
5 1 1 1 10 2 712 599 52 30 33 se
5 1 1 1 10 3 1154 607 4 16 51 f
5 1 1 1 10 4 1216 620 4 16 68 4
5 1 1 1 10 5 1363 591 54 53 0 OPA
5 1 1 1 10 6 1425 591 23 53 13 an
5 1 1 1 10 7 1658 592 54 45 1 ba
5 1 1 1 10 8 2467 609 139 28 62 See
5 1 1 1 10 9 2710 602 57 21 11 yaoi
4 1 1 1 11 0 497 603 2219 79 -1
5 1 1 1 11 1 497 638 20 35 52 8
5 1 1 1 11 2 530 628 19 39 0 B
5 1 1 1 11 3 772 625 110 33 26 eg
5 1 1 1 11 4 931 621 42 61 10 age
5 1 1 1 11 5 1150 629 67 38 27 roy
5 1 1 1 11 6 1446 626 15 19 0 E
5 1 1 1 11 7 1637 634 53 40 54 vol
5 1 1 1 11 8 1708 603 69 75 17 82
5 1 1 1 11 9 1842 637 81 17 94 EXISTING
5 1 1 1 11 10 1930 620 66 43 96 POWER
5 1 1 1 11 11 2002 637 61 17 96 ABOVE
5 1 1 1 11 12 2070 637 78 17 96 GROUND
5 1 1 1 11 13 2452 627 55 32 47 Gi
5 1 1 1 11 14 2526 630 60 16 0 \\
f
Bree | este A EXISTING BUILDING (TYP.) fooee) | y li
S € cll
5 1 1 1 13 4 1489 677 51 67 23 ge
5 1 1 1 13 5 1623 677 34 67 21 nt
5 1 1 1 13 6 1842 712 82 17 96 EXISTING
5 1 1 1 13 7 1930 712 101 17 95 BOUNDARY
5 1 1 1 13 8 2037 712 38 17 96 LINE
5 1 1 1 13 9 2520 702 84 37 19 Yo
4 1 1 1 14 0 498 738 2055 18 -1
5 1 1 1 14 1 498 738 19 13 0 y
5 1 1 1 14 2 1139 740 4 16 86 !
5 1 1 1 14 3 1226 739 10 13 21 £
5 1 1 1 14 4 2272 746 5 6 39 i
5 1 1 1 14 5 2518 744 2 3 31 ‘ig
4 1 1 1 15 0 498 752 2021 28 -1
5 1 1 1 15 1 498 752 19 12 67 N
5 1 1 1 15 2 1137 762 3 17 37 i;
5 1 1 1 15 3 1200 753 5 17 24 ot
5 1 1 1 15 4 1842 754 100 17 96 PROPOSED
5 1 1 1 15 5 1948 754 54 17 94 MOON
5 1 1 1 15 6 2010 754 48 17 96 FOOT
5 1 1 1 15 7 2266 756 11 22 67 ?
5 1 1 1 15 8 2384 765 109 15 16 Heald
5 1 1 1 15 9 2515 760 4 18 47 |
4 1 1 1 16 0 852 776 1805 29 -1
5 1 1 1 16 1 852 790 12 4 0
; | PLATFORM, REFER TO Pagid | ¥ !
B 4 1 ! e T2-1 FOR DETAILS LL ie
i! PROPOSED 1.8m SATELLITE ‘
! jt DISH MOUNTED ON i [WANS eZ
hs PROPOSED 1.8m POLE. Prt ly Peat) NO ee
| oy REFER TO 12 FOR DETAILS aes = ‘
i 1 of ACCESS GATE FOR sf 4 Se
! { PROPOSED COMPOUND h Pai
i of ie =
| ; | PROPOSED TRENCHING FOR POWER, ; 8 nts ;
] I j FIBRE & EARTH TO BE APPROX. 23m. Copyright © Whereis® Registered Trademark of Sensis Pty Ltd.
i a, ry REFER TO G44 FOR DETAILS LOCALITY PLAN
!
. | EXISTING TELSTRA NOT TO SCALE
c mm 1 EXCHANGE BUILDING c
PROPOSED TRENCHING | 1 2 ee i) ACCESS DRIVEWAY ye 2 @
t os} F- om a x 2
i f--SL_2] Ly z ae e ® e
TR oe, eS @ oo Sy
FOR EARTHING APPROX. { - a we \ EXISTING ACCESS GATE “——Fe oF es
K_ 10m. EARTHING N x LT re a j s\ o ~ ole : <@ @ N
SCENARIO 3 TO BE USED | ¥1 feeb? \ KA 2 oe Ob a
3 i Gr <= th eee | We ge EXISTING SITE EARTH e Ut A aebin aa
' 20775 mates | i { ee GRID ag te ‘2)\ MS
Q 3 Berets | \\3 AR)! SJ @ wo. ill oF eal ; EXISTING TELSTRA
; gu [men ccgeh | I @ i 7h ee EXCHANGE BUILDING
D aoe | “SS wate \N Ky a? ane F:| pl
Ve We OSES TRS i Y wae CeO ee @ i ; he RAILROAD PARADE
Phe e oS Seek A SS _ EXISTING BUILDING (TYP. ao fe Titers, ) POL get Factory stReer
s “C_ EXISTING TREES (TYP.) e © @//Gnre © 2 72h
a Be, ng 2/28) 892 //ergel| Ct
° Fe pe en] 0 e si
SITE LAYOUT Hig St? & A
SCALE 1:500 Oo a H m
0900 P| n
a a: = Oo / |
E SITE ACCESS
NOTES : SCALE 1:5000
1, FOR SITE SPECIFIC NOTES REFER TO SHEETS S0 & S0-1, 50m 9 50m 100m 150m 290m 250m, = 4.5000
2. FOREME SIGNS NOTED ASX REFER TO 005486 DOCUMENTS FOR DETAILS. FOR CONSTRUCTION
3, _ ALL DIMENSIONS ARE IN MILLIMETRES UNLESS OTHERWISE STATED. TO BE READ IN CONJUNCTION WITH SHEETS S1-1 & S3.
See a CORI ee omomtth eeak « elstra
SITE STRUCTURE CO-ORDINATES (GDA 183929| JM FOR CONSTRUCTION -$P30082457/O01SDOWN - SATELLITE 18.06.21 SATELLITE RORESS NODE SITE 183008
GPS READING ACCURACY: +xxm
CENTRE OF MAST/POLE/TOWER og OMELIANC E BOK POMONA EXCHANGE
‘ SITE LAYOUT AND ACCESS
— IN RED O 25 RAILWAY PARADE, POMONA, QLD 4568 _
geste os __) | Ganamimamacram mene [° QC 100259
ty 4 5 Cad file: QC 100259,dwg A
Page 28 of 96Section 29
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Page 29 of 96
rn
=
m
aD
>
rc
OZ/SO/90 -2}24 UO|SJaA |
5 1 1 1 7 5 2046 498 92 18 0 UOISI8/\
5 1 1 1 7 6 2291 474 35 65 81 8
4 1 1 1 8 0 360 582 1966 45 -1
5 1 1 1 8 1 360 609 67 13 35 eNn=
5 1 1 1 8 2 446 611 22 15 44 >
5 1 1 1 8 3 2292 582 34 45 96 =
4 1 1 1 9 0 385 621 1941 44 -1
5 1 1 1 9 1 385 654 42 10 43 on:
5 1 1 1 9 2 1796 621 195 44 50 =?
5 1 1 1 9 3 2292 631 34 27 90 =
4 1 1 1 10 0 360 623 1963 92 -1
5 1 1 1 10 1 360 654 67 49 51 ESS
5 1 1 1 10 2 446 663 23 30 16 8
5 1 1 1 10 3 541 660 98 40 0 |elals|a
5 1 1 1 10 4 1860 623 136 84 43 ——
5 1 1 1 10 5 2292 659 31 56 27 =
4 1 1 1 11 0 360 694 1316 16 -1
5 1 1 1 11 1 360 695 102 12 28 =eS--
5 1 1 1 11 2 619 694 18 16 96 =
5 1 1 1 11 3 1045 699 72 10 23 and
5 1 1 1 11 4 1484 699 43 10 32 AD
5 1 1 1 11 5 1565 699 111 10 14 zDanwv
4 1 1 1 12 0 360 698 1966 62 -1
5 1 1 1 12 1 360 708 67 42 32 an
5 1 1 1 12 2 1018 699 96 61 15 ae
5 1 1 1 12 3 1483 698 193 62 33 EEE
5 1 1 1 12 4 1958 709 42 42 0 ‘:
5 1 1 1 12 5 2292 721 34 25 2 m
4 1 1 1 13 0 360 780 1966 56 -1
5 1 1 1 13 1 360 781 65 42 17 £83
5 1 1 1 13 2 1046 780 71 56 59 aaa
5 1 1 1 13 3 1484 790 99 34 0 Sa9=
5 1 1 1 13 4 1604 784 72 34 31 nd=
5 1 1 1 13 5 1957 780 45 48 75 3”
5 1 1 1 13 6 2292 803 34 25 69 m
4 1 1 1 14 0 360 805 1966 78 -1
5 1 1 1 14 1 360 805 61 53 53 aus
5 1 1 1 14 2 661 843 22 16 46 8
5 1 1 1 14 3 1045 806 61 77 23 ane
5 1 1 1 14 4 1483 816 100 37 68 gies
5 1 1 1 14 5 1604 812 72 42 65 226
5 1 1 1 14 6 1958 834 17 18 68 3
5 1 1 1 14 7 2288 801 20 77 46 rm
4 1 1 1 15 0 360 843 1966 45 -1
5 1 1 1 15 1 360 851 65 35 23 ae
5 1 1 1 15 2 661 860 23 19 94 2
5 1 1 1 15 3 1073 848 44 34 48 a2
5 1 1 1 15 4 1484 843 71 38 0 nee
5 1 1 1 15 5 1561 836 11 61 0 |
5 1 1 1 15 6 1604 844 45 35 14 oz
5 1 1 1 15 7 1958 853 17 22 34 g
5 1 1 1 15 8 2292 861 34 27 86 m
4 1 1 1 16 0 360 878 1966 30 -1
5 1 1 1 16 1 360 884 17 13 38 E
5 1 1 1 16 2 541 887 52 18 43 5/5)
5 1 1 1 16 3 662 880 22 15 33 15
5 1 1 1 16 4 926 879 68 29 44 iH
5 1 1 1 16 5 1073 880 44 24 52 8%
5 1 1 1 16 6 1484 881 71 27 36 yma)
5 1 1 1 16 7 1604 878 45 26 36 Ba
5 1 1 1 16 8 2292 890 34 7 81 a
4 1 1 1 17 0 360 888 1966 42 -1
5 1 1 1 17 1 360 888 62 38 34 aaa
5 1 1 1 17 2 542 903 16 13 25 =
5 1 1 1 17 3 662 898 22 16 95 2
5 1 1 1 17 4 756 903 35 19 76 id
5 1 1 1 17 5 1484 902 71 23 54 Pam
5 1 1 1 17 6 1606 896 43 27 40 woe
5 1 1 1 17 7 2292 903 34 27 44 S
4 1 1 1 18 0 360 912 1289 37 -1
5 1 1 1 18 1 360 917 67 31 46 mmo
5 1 1 1 18 2 665 912 10 37 29 Sc
5 1 1 1 18 3 753 925 35 17 35 17
5 1 1 1 18 4 1483 918 72 18 49 Bas
5 1 1 1 18 5 1631 919 18 25 32 4
4 1 1 1 19 0 360 935 1966 38 -1
5 1 1 1 19 1 360 939 67 34 46 aga
5 1 1 1 19 2 506 952 87 18 30 glzlz
5 1 1 1 19 3 662 939 22 15 28 a
5 1 1 1 19 4 782 946 4 17 40 1
5 1 1 1 19 5 1510 935 45 26 83 ag
5 1 1 1 19 6 2291 935 35 31 12 S
4 1 1 1 20 0 360 961 324 45 -1
5 1 1 1 20 1 360 963 67 29 28 Bao
5 1 1 1 20 2 506 971 87 35 1 2/38
5 1 1 1 20 3 660 961 24 33 47 g
4 1 1 1 21 0 360 981 1966 45 -1
5 1 1 1 21 1 360 990 67 27 32 soe
5 1 1 1 21 2 541 981 49 45 47 S13
5 1 1 1 21 3 662 996 22 14 86 x|
5 1 1 1 21 4 746 1005 4 13 16 ji!
5 1 1 1 21 5 2292 984 34 31 88 >
4 1 1 1 22 0 360 1010 1966 37 -1
5 1 1 1 22 1 360 1010 67 26 36 men
5 1 1 1 22 2 506 1010 87 31 0 Sisjz)
5 1 1 1 22 3 662 1013 22 14 40 |G)
5 1 1 1 22 4 745 1011 35 26 5 or!
5 1 1 1 22 5 2291 1016 35 31 27 B
4 1 1 1 23 0 360 1029 939 32 -1
5 1 1 1 23 1 360 1029 67 30 40 gaa
5 1 1 1 23 2 542 1036 51 16 20 s|5
5 1 1 1 23 3 662 1029 22 16 60 o
5 1 1 1 23 4 774 1033 4 17 62 1
5 1 1 1 23 5 1245 1042 54 19 16 —
4 1 1 1 24 0 360 1046 1966 42 -1
5 1 1 1 24 1 360 1052 62 36 33 of8s
5 1 1 1 24 2 506 1046 84 35 35 eles
5 1 1 1 24 3 661 1047 23 29 56 =
5 1 1 1 24 4 772 1055 4 16 79 1
5 1 1 1 24 5 1238 1058 10 15 39 ~~
5 1 1 1 24 6 2292 1054 34 25 0 @
4 1 1 1 25 0 360 1048 1966 87 -1
5 1 1 1 25 1 360 1074 67 26 33 zoe
5 1 1 1 25 2 506 1067 87 35 0 R=]
5 1 1 1 25 3 662 1078 22 14 5 am
5 1 1 1 25 4 770 1076 4 17 33 !
5 1 1 1 25 5 1223 1072 21 63 92 /
5 1 1 1 25 6 1391 1048 65 60 24 ee
5 1 1 1 25 7 2292 1084 34 27 0 o
4 1 1 1 26 0 360 1093 1109 22 -1
5 1 1 1 26 1 360 1099 67 13 79 mow
5 1 1 1 26 2 494 1093 28 22 21 ae
5 1 1 1 26 3 767 1098 5 16 86 !
5 1 1 1 26 4 1455 1099 14 11 0 ,
4 1 1 1 27 0 360 1111 1966 69 -1
5 1 1 1 27 1 360 1111 67 51 13 ee
5 1 1 1 27 2 506 1113 17 37 63 (al
5 1 1 1 27 3 577 1107 16 56 0 |é
5 1 1 1 27 4 1176 1151 26 5 16 _
5 1 1 1 27 5 1245 1140 9 11 16 fe
5 1 1 1 27 6 1295 1133 67 22 52 pee
5 1 1 1 27 7 1609 1143 56 27 0 vo
5 1 1 1 27 8 2292 1117 34 63 34 S
4 1 1 1 28 0 360 1132 1342 84 -1
5 1 1 1 28 1 360 1158 43 26 18 aS
5 1 1 1 28 2 506 1151 18 26 9 a|
5 1 1 1 28 3 577 1164 16 15 43 |2
5 1 1 1 28 4 762 1163 4 16 72 !
5 1 1 1 28 5 1021 1140 64 48 27 gee
5 1 1 1 28 6 1202 1132 38 84 0 f.
5 1 1 1 28 7 1281 1155 98 42 42 fp
5 1 1 1 28 8 1453 1169 18 18 70 J
5 1 1 1 28 9 1690 1163 12 14 9 :
4 1 1 1 29 0 360 1169 1292 36 -1
5 1 1 1 29 1 360 1175 42 25 42 ae
5 1 1 1 29 2 506 1178 18 13 77 g
5 1 1 1 29 3 810 1179 182 26 30 epee
5 1 1 1 29 4 1276 1177 30 28 58 ES
5 1 1 1 29 5 1465 1169 14 29 59 f
4 1 1 1 30 0 360 1178 1335 92 -1
5 1 1 1 30 1 360 1197 43 46 24 gz
5 1 1 1 30 2 506 1192 16 52 67 g
5 1 1 1 30 3 577 1180 16 52 0 -
5 1 1 1 30 4 737 1180 57 74 52 o-
5 1 1 1 30 5 879 1188 9 12 28 ;
5 1 1 1 30 6 1168 1192 37 36 56 IY
5 1 1 1 30 7 1285 1188 110 82 3 |
5 1 1 1 30 8 1449 1207 78 35 43 ‘=
5 1 1 1 30 9 1674 1178 21 62 93 /
4 1 1 1 31 0 360 1228 1635 64 -1
5 1 1 1 31 1 360 1244 42 48 28 2
5 1 1 1 31 2 577 1231 16 51 23 5
5 1 1 1 31 3 752 1249 6 38 49 I
5 1 1 1 31 4 1185 1228 50 48 48 ban
5 1 1 1 31 5 1298 1249 4 26 42 lI
5 1 1 1 31 6 1435 1246 27 27 40 V
5 1 1 1 31 7 1670 1241 10 14 0 *
5 1 1 1 31 8 1991 1271 4 17 40 ;
4 1 1 1 32 0 385 1256 1609 62 -1
5 1 1 1 32 1 385 1292 18 16 23 °
5 1 1 1 32 2 577 1284 16 15 78 a
5 1 1 1 32 3 750 1292 4 17 23 !
5 1 1 1 32 4 1299 1284 3 25 96 |
5 1 1 1 32 5 1437 1288 5 6 30 .
5 1 1 1 32 6 1653 1256 20 62 91 /
5 1 1 1 32 7 1989 1292 5 17 49 |
4 1 1 1 33 0 747 1267 1244 90 -1
5 1 1 1 33 1 747 1314 5 17 0 :
5 1 1 1 33 2 835 1297 43 60 93 ©)
5 1 1 1 33 3 1235 1267 142 80 49 NUR
5 1 1 1 33 4 1607 1337 6 6 44 .
5 1 1 1 33 5 1636 1310 11 37 26 >»
5 1 1 1 33 6 1712 1276 25 39 0 e
5 1 1 1 33 7 1988 1314 3 17 69 i
4 1 1 1 34 0 745 1324 1244 64 -1
5 1 1 1 34 1 745 1336 5 16 90 !
5 1 1 1 34 2 1266 1324 28 37 47 pa
5 1 1 1 34 3 1466 1324 81 45 0 ——,
5 1 1 1 34 4 1625 1334 26 54 86 /
5 1 1 1 34 5 1985 1336 4 16 27 |
4 1 1 1 35 0 742 1357 1246 40 -1
5 1 1 1 35 1 742 1357 6 40 81 |
5 1 1 1 35 2 1286 1362 16 25 48 II
5 1 1 1 35 3 1567 1359 57 27 39 ey
5 1 1 1 35 4 1981 1357 7 39 26 }
4 1 1 1 36 0 986 1396 997 74 -1
5 1 1 1 36 1 986 1432 38 38 67 6048
5 1 1 1 36 2 1210 1429 37 38 86 1304
5 1 1 1 36 3 1286 1396 22 60 56 tt
5 1 1 1 36 4 1422 1425 45 38 61 6019
5 1 1 1 36 5 1687 1406 19 16 52 =
5 1 1 1 36 6 1977 1401 6 38 47 |
4 1 1 1 37 0 1631 1436 349 43 -1
5 1 1 1 37 1 1631 1436 36 43 60 <4
5 1 1 1 37 2 1975 1444 5 17 69 !
4 1 1 1 38 0 1286 1459 691 75 -1
5 1 1 1 38 1 1286 1475 17 29 59 II
5 1 1 1 38 2 1641 1459 21 75 91 /
5 1 1 1 38 3 1971 1465 6 39 0 '
4 1 1 1 39 0 1286 1509 687 38 -1
5 1 1 1 39 1 1286 1509 17 30 29 \
4 1 1 1 40 0 1288 1545 689 34 -1
5 1 1 1 40 1 1288 1545 14 34 54 IT
5 1 1 1 40 2 1956 1554 21 21 57 6
4 1 1 1 41 0 673 1579 622 75 -1
5 1 1 1 41 1 673 1605 82 49 43 Fam
5 1 1 1 41 2 1273 1579 22 54 54 Tl
4 1 1 1 42 0 673 1650 1286 52 -1
5 1 1 1 42 1 673 1650 69 52 41 oom
5 1 1 1 42 2 1288 1665 16 27 21 I]
5 1 1 1 42 3 1953 1660 6 38 52 i
4 1 1 1 43 0 607 1700 1348 35 -1
5 1 1 1 43 1 607 1723 17 10 71 .
5 1 1 1 43 2 673 1705 43 30 74 |.8
5 1 1 1 43 3 1287 1700 17 26 0 |
4 1 1 1 44 0 319 1706 1728 79 -1
5 1 1 1 44 1 319 1737 19 33 48 N
5 1 1 1 44 2 542 1729 62 56 0 Bgl
5 1 1 1 44 3 607 1733 15 41 0 z
5 1 1 1 44 4 673 1739 13 13 0 -
5 1 1 1 44 5 725 1706 33 64 0 &
5 1 1 1 44 6 1289 1735 15 39 41 i!
5 1 1 1 44 7 1947 1725 6 38 74 |
5 1 1 1 44 8 2027 1737 20 33 43 Ny
4 1 1 1 45 0 347 1766 962 83 -1
5 1 1 1 45 1 347 1766 216 83 45 ee
5 1 1 1 45 2 607 1771 151 56 23 gue
5 1 1 1 45 3 1202 1766 33 32 91 ©
5 1 1 1 45 4 1289 1771 20 36 36 {iT
4 1 1 1 46 0 1284 1811 661 17 -1
5 1 1 1 46 1 1284 1818 12 8 67 7
5 1 1 1 46 2 1940 1811 5 17 51 !
4 1 1 1 47 0 353 1791 1498 84 -1
5 1 1 1 47 1 353 1826 14 34 54 5
5 1 1 1 47 2 567 1791 56 76 63 LE
5 1 1 1 47 3 673 1851 17 24 0 @
5 1 1 1 47 4 726 1818 17 33 16 —-
5 1 1 1 47 5 960 1813 32 51 51 Ig
5 1 1 1 47 6 1289 1813 16 61 80 |
5 1 1 1 47 7 1830 1808 21 61 40 3
4 1 1 1 48 0 360 1847 1579 81 -1
5 1 1 1 48 1 360 1847 55 81 61 |
5 1 1 1 48 2 549 1847 68 81 39 ale
5 1 1 1 48 3 965 1859 22 30 43 i
5 1 1 1 48 4 1837 1818 84 84 52 aa
4 1 1 1 49 0 159 1892 1778 52 -1
5 1 1 1 49 1 159 1918 34 26 83 U
5 1 1 1 49 2 353 1918 14 18 21 5
5 1 1 1 49 3 542 1914 16 26 62 3
5 1 1 1 49 4 607 1893 17 33 51 3
5 1 1 1 49 5 673 1912 17 24 62 ls
5 1 1 1 49 6 1290 1892 15 33 37 ||
5 1 1 1 49 7 1541 1925 10 4 14 2
5 1 1 1 49 8 1823 1898 20 41 46 g
4 1 1 1 50 0 158 1927 2167 73 -1
5 1 1 1 50 1 158 1947 26 23 33 8
5 1 1 1 50 2 333 1937 17 67 45 li
5 1 1 1 50 3 542 1942 17 58 61 j
5 1 1 1 50 4 607 1928 17 41 49 5
5 1 1 1 50 5 1284 1927 21 46 39 1
5 1 1 1 50 6 1537 1953 6 4 10 3
5 1 1 1 50 7 1820 1940 19 26 90 =
5 1 1 1 50 8 1928 1941 4 17 71 |
5 1 1 1 50 9 2036 1965 3 1 20 1
5 1 1 1 50 10 2292 1937 33 14 36 =y
4 1 1 1 51 0 158 1960 2167 48 -1
5 1 1 1 51 1 158 1967 11 41 40 Cc
5 1 1 1 51 2 353 1963 14 22 23 z
5 1 1 1 51 3 607 1970 17 10 80 2
5 1 1 1 51 4 673 1973 17 24 75 ty
5 1 1 1 51 5 1303 1960 3 26 86 |
5 1 1 1 51 6 1819 1966 18 13 0 %
5 1 1 1 51 7 1926 1963 5 16 88 !
5 1 1 1 51 8 2300 1946 11 41 27 Oo
4 1 1 1 52 0 158 1983 1771 50 -1
5 1 1 1 52 1 158 1992 31 41 10 >)
5 1 1 1 52 2 353 1988 14 19 0 s
5 1 1 1 52 3 607 1986 17 21 58 =
5 1 1 1 52 4 1290 1983 21 25 46 fs
5 1 1 1 52 5 1924 1984 5 17 79 !
4 1 1 1 53 0 353 2001 1973 56 -1
5 1 1 1 53 1 353 2008 14 29 33 @
5 1 1 1 53 2 542 2001 17 36 32 g]
5 1 1 1 53 3 607 2008 16 22 61 |=
5 1 1 1 53 4 659 2012 18 45 92 g
5 1 1 1 53 5 1290 2005 16 37 76 i
5 1 1 1 53 6 2292 2001 34 33 82 =
4 1 1 1 54 0 159 2035 2167 36 -1
5 1 1 1 54 1 159 2035 35 36 10 No
5 1 1 1 54 2 353 2041 14 21 80 g
5 1 1 1 54 3 542 2041 16 15 0 f|_.|
5 1 1 1 54 4 607 2036 17 23 51 2
5 1 1 1 54 5 1285 2039 21 26 21 I
5 1 1 1 54 6 2292 2038 34 31 81 =
4 1 1 1 55 0 158 2058 1763 33 -1
5 1 1 1 55 1 158 2064 34 23 92 ©
5 1 1 1 55 2 353 2067 14 24 40 3
5 1 1 1 55 3 607 2060 17 23 0 A
4 1 1 1 56 0 158 2057 2168 92 -1
5 1 1 1 56 1 158 2104 26 24 56 °
5 1 1 1 56 2 353 2095 14 24 67 a
5 1 1 1 56 3 542 2057 17 92 0 '
5 1 1 1 56 4 607 2084 17 37 44 zg
5 1 1 1 56 5 660 2085 17 32 26 =
5 1 1 1 56 6 1291 2073 20 52 16 iA
5 1 1 1 56 7 1914 2092 4 17 61 i
5 1 1 1 56 8 2292 2070 34 27 66 <
4 1 1 1 57 0 148 2093 2177 70 -1
5 1 1 1 57 1 148 2113 45 42 27 =p
5 1 1 1 57 2 353 2129 14 16 60 z
5 1 1 1 57 3 607 2123 16 25 75 =
5 1 1 1 57 4 1281 2093 13 70 0 IH
5 1 1 1 57 5 1910 2114 6 38 53 |
5 1 1 1 57 6 2291 2113 34 48 0 ¥
4 1 1 1 58 0 364 2153 259 11 -1
5 1 1 1 58 1 364 2154 3 3 46 3
5 1 1 1 58 2 610 2144 8 29 0 an
4 1 1 1 59 0 158 2150 2167 44 -1
5 1 1 1 59 1 158 2159 34 23 54 S
5 1 1 1 59 2 350 2150 17 34 37 i
5 1 1 1 59 3 542 2150 16 44 0 3|
5 1 1 1 59 4 607 2165 16 13 61 |*
5 1 1 1 59 5 1285 2152 22 27 31 i
5 1 1 1 59 6 2292 2164 33 23 44 3
4 1 1 1 60 0 168 2174 2157 66 -1
5 1 1 1 60 1 168 2176 12 43 34 Oo
5 1 1 1 60 2 353 2187 14 53 63 j
5 1 1 1 60 3 542 2197 17 24 0 &
5 1 1 1 60 4 1290 2174 15 43 18 I]
5 1 1 1 60 5 2292 2189 33 23 0 S
4 1 1 1 61 0 353 2217 1554 73 -1
5 1 1 1 61 1 353 2241 3 3 50 |
5 1 1 1 61 2 542 2221 16 46 0 :
5 1 1 1 61 3 1291 2217 16 73 0 t
4 1 1 1 62 0 361 2274 1535 74 -1
5 1 1 1 62 1 361 2274 50 74 54 |
5 1 1 1 62 2 509 2278 85 52 53 ae
5 1 1 1 62 3 1286 2287 21 39 46 i
5 1 1 1 62 4 1891 2330 5 17 25 1
4 1 1 1 63 0 1292 2334 20 26 -1
5 1 1 1 63 1 1292 2334 20 26 9 ir
4 1 1 1 64 0 361 2328 1533 76 -1
5 1 1 1 64 1 361 2328 50 74 36 |
5 1 1 1 64 2 1292 2344 17 60 25 t
4 1 1 1 65 0 542 2395 1348 18 -1
5 1 1 1 65 1 542 2395 16 18 47 =
5 1 1 1 65 2 1288 2404 12 9 13 i
4 1 1 1 66 0 378 2387 1510 82 -1
5 1 1 1 66 1 378 2387 216 82 40 |i
5 1 1 1 66 2 1306 2412 3 26 28 |
5 1 1 1 66 3 1882 2417 6 38 93 |
4 1 1 1 67 0 366 2450 1519 60 -1
5 1 1 1 67 1 366 2467 37 43 25 ;
5 1 1 1 67 2 528 2467 66 43 35 OS)
5 1 1 1 67 3 1242 2450 111 55 19 Ph
5 1 1 1 67 4 1877 2460 8 38 50 i
4 1 1 1 68 0 353 2473 1527 90 -1
5 1 1 1 68 1 353 2504 173 48 17 yo
5 1 1 1 68 2 981 2473 300 70 37 Ly
5 1 1 1 68 3 1493 2490 30 46 0 Y
4 1 1 1 69 0 404 2546 1470 43 -1
5 1 1 1 69 1 404 2555 16 19 17 R
5 1 1 1 69 2 502 2548 21 41 4 fe
5 1 1 1 69 3 620 2546 47 40 67 pal
5 1 1 1 69 4 873 2559 104 26 11 eno
5 1 1 1 69 5 1220 2551 12 25 0 \
5 1 1 1 69 6 1551 2556 15 23 3 i
z c oO BEF 8 pag Sa <
Qlz 3¢ 2 2 OH Ay EE 52 \ ge gol
a|3. 58/4] (8 Slat fit (bas gg 33]
Ss 22998 @ Oo olt-/2/¥ Si ie i = @! 8 23 5
S|2a 5/2] = f Spe ab eT” we GS fa 8)
oe & me wan iw mes aa ze
Sesaais ay ag Z| ag ez
2°38 a} ié zg Rm es 6
e Qa = ta aw aa
za m 86 8
95 m = gs
— gi | oo ag
FE 8 = $5
a 8
= \Z oO
SidSection 30
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Page 30 of 96
<9
2o
a2
s
ao i g)
1 ©
5 ‘ <
4 | |
§
fo \ \
qs 945mm x 120mm MOON
a5 | FOOT PLATFORM |
gs G)
oS U/G POWER ROUTE IN 50mm: ‘ [3 | N
HD uPVC ELECTRICAL 2) =
q CONDUIT. REFER NOTE 4 / \
UNG FIBRE ROUTE IN y +h | i
P50 CONDUIT. yO --}- Oh fo | | sata ine |
REFER NOTE 4 —~—er—-L-_ ~~ Ug TT LEG [EEE EES a] \
y trim Ut as es ppd GEN
. ® z Ts; [a x Overs | Pas
sie = (| | aN es A 24 OTS AZIMUTH 15,8° TN, 5.1° MN 8
| Rit | A a pagekiy pea TT | ee enonisase 3
I, 2 © aur aii ee oa ees
Wi CEN TPS R see |: 5B.
| it LH Le asics
ab Y ir Q 2 La eee >
POWER, EARTH & | - 4- r———F Hy \ Crt | \ |
tA, 1 ied widhe AS
FIBRE IN SHARED / . c \ A ‘
TRENCH, REFER L\ | @E] \ @) Be |
c | NOTES 3 c
fol |e + = .
IZ | s 1220
(ie. 48 g 2
oS lz ly 5) *
<1 i ie i |p
Iz jw 18 {
IS ue 18
2g leu |p & s—/— a @ 7 ——+ 3 1 8 1 1 — 1 / — 1 — g)
|\2 @ 21s 1220 1200
g laze 8 3050 i SECURITY FENCE POST,
1g j#2 |S : POST SPACING NOT TO
le le g\s ee EXCEED 3,0m (TYP)
UN 760
CLIENT EQUIPMENT KEYED NOTES: ELECTRICAL SITE EQUIPMENT KEYED NOTES:
[[1,] OAN CABINET W/EXTERNAL AC UNIT 400A UTILITY METER OF REQUIRED)
[2] ELECTRONICS ENCLOSURE W/ SHROUD COVER SITE SETOUT PLAN - OPTION 1 SIZE OF THE ENCLOSURE SHALL SUIT THE POWER UTILITY
SCALE 125 REQUIREMENTS IN THE RELEVANT STATES AND TERRITORIES
[2] 1.8m REFLECTOR W/ MODIFIED FEED BOOM & TRANSCEIVER ‘ig 5 a6 ca
[7] 800m wounTen we auc or a 2 (3) 100A LOAD CENTRE BOX W/ EXTERNAL SURGE PROTECTION DEVICE
(PREFERRED OPTION COMPOUND LAYOUT)
[] rere wreRrace Pane. NOLEN A (4 COTT WARNING MARKER (SUPPLIED BY CONTRACTOR)
ACCESS NODE ASSEMBLY CABINET MFR. POWER CABLE COMPLETED AS PER DESIGN Oo ) {2) STACKED SECTIONS OF UNISTRUT FOR CABLE PATHWAY
[7] ACCESS NODE ASSEMBLY CABINET MFR. DATA CABLE ALTERATIONS IN RED Oo FOR CONSTRUCTION
CAN CABINET MFR. ACIDC POWER CABLES MFR. DATA CABLES ie a TO BE READ IN CONJUNCTION WITH SHEETS S1, S1-1 & 83,
(ORDER |DRAWN| CHKD | AMENDMENT. =| EXAM | APPD| DATES) ist
[9] ELECTRONICS ENCLOSURE MFR. DC POWER CABLES & MFR. DATA CABLES a SoS ae won Te stra
NOTES: SATELLITE ACCESS NODE SITE 183929)
4. REFER TO SHEET 80 FOR GENERAL NOTES,
2. SECURITY FENCE HEIGHT MUST BE MINIMUM 1.8m HIGH WITH POST SPACING NOT TO EXCEED 3.0m. POMONA EXCHANGE
3. COMPOUND SHALL BE STRIPPED OF ALL VEGETATION & TOPSOIL. COMPOUND SHALL BE FINISHED WITH A LAYER OF SITE SETOUT PLAN- OPTION 1
GEOTEXTILE UNDERLYING (WEED MATTING). MINIMUM 100mm LAYER OF COMPACTED ROADBASE OR 20mm AGGREGATE. 25 RAILWAY PARADE, POMONA, QLD 4568
4, POWER, FIBRE AND EARTH DUCT TO USE SHORTEST DIRECT ROUTES (SHORTEST DISTANCE). -
wm _QC100259
SN A
Page 30 of 96Section 31
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Page 31 of 96
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
oS
a2
s
¢ & | CLIENT EQUIPMENT KEYED NOTES: TELSTRA ANTENNA CONFIGURATION TABLE
a Sy ANTENNA
5 1 1 1 6 4 2257 523 44 17 91 TYPE
5 1 1 1 6 5 2306 523 12 17 91 &
5 1 1 1 6 6 2430 517 84 17 93 ANTENNA
5 1 1 1 6 7 2518 509 19 37 90 |
5 1 1 1 6 8 2543 517 84 17 69 ANTENNA]
5 1 1 1 6 9 2671 515 74 14 73 ANTENNA
5 1 1 1 6 10 2817 521 74 16 91 SECTOR
5 1 1 1 6 11 2895 521 29 16 91 NO.
4 1 1 1 7 0 530 527 2410 62 -1
5 1 1 1 7 1 530 555 19 11 55 N
5 1 1 1 7 2 592 527 48 47 44 [1]
5 1 1 1 7 3 664 542 36 17 91 OAN
5 1 1 1 7 4 706 542 75 18 93 CABINET
5 1 1 1 7 5 786 542 23 18 92 W/
5 1 1 1 7 6 812 542 92 16 94 EXTERNAL
5 1 1 1 7 7 909 542 24 18 96 AC
5 1 1 1 7 8 939 542 39 17 96 UNIT
5 1 1 1 7 9 1221 527 51 47 96 [7]
5 1 1 1 7 10 1377 542 75 44 23 er
5 1 1 1 7 11 1502 542 49 44 28 re
5 1 1 1 7 12 1556 542 87 44 40 oe
5 1 1 1 7 13 1646 542 94 44 16 See
5 1 1 1 7 14 1746 542 50 17 96 ONTO
5 1 1 1 7 15 1800 542 35 16 96 THE
5 1 1 1 7 16 2167 549 122 16 75 SIZEHXWxD
5 1 1 1 7 17 2422 538 96 51 4 mecha
5 1 1 1 7 18 2565 542 53 43 52 er
5 1 1 1 7 19 2720 540 26 42 26 te
5 1 1 1 7 20 2801 546 12 17 91 &
5 1 1 1 7 21 2818 546 122 17 96 TECHNOLOGY
4 1 1 1 8 0 500 623 2463 46 -1
5 1 1 1 8 1 500 641 12 21 61 3
5 1 1 1 8 2 530 628 19 40 57 =
5 1 1 1 8 3 557 623 25 49 40 —
5 1 1 1 8 4 604 628 40 40 40 |[3]
5 1 1 1 8 5 664 639 147 17 15 amreFLECTOR
5 1 1 1 8 6 816 639 111 17 69 W/MODIFIED
5 1 1 1 8 7 933 639 46 17 95 FEED
5 1 1 1 8 8 984 639 51 17 92 BOOM
5 1 1 1 8 9 1041 639 12 17 92 &
5 1 1 1 8 10 1058 639 124 17 95 TRANSCEIVER
5 1 1 1 8 11 1406 624 51 45 24 ee
5 1 1 1 8 12 1472 624 38 44 30 ae
5 1 1 1 8 13 1644 624 37 17 75 ONE
5 1 1 1 8 14 1686 624 75 17 45 MARKER
5 1 1 1 8 15 1765 624 25 17 45 ON
5 1 1 1 8 16 1797 624 63 17 54 EITHER
5 1 1 1 8 17 2779 623 184 18 34 ees
4 1 1 1 9 0 500 677 379 28 -1
5 1 1 1 9 1 500 677 12 7 0 o
5 1 1 1 9 2 664 687 51 18 96 BOOM
5 1 1 1 9 3 722 687 87 18 96 MOUNTED
5 1 1 1 9 4 815 688 23 17 96 HP
5 1 1 1 9 5 844 687 35 18 95 BUC
4 1 1 1 10 0 500 723 1341 42 -1
5 1 1 1 10 1 500 727 12 7 81 N
5 1 1 1 10 2 605 725 39 40 50 [5]
5 1 1 1 10 3 664 737 50 16 80 FIBRE
5 1 1 1 10 4 719 736 98 18 89 INTERFACE
5 1 1 1 10 5 823 737 57 16 96 PANEL
5 1 1 1 10 6 1757 723 84 42 49 As
4 1 1 1 11 0 1755 761 95 14 -1
5 1 1 1 11 1 1755 761 5 12 66 i
5 1 1 1 11 2 1841 766 9 9 45 ‘,
4 1 1 1 12 0 605 765 1272 49 -1
5 1 1 1 12 1 605 774 39 40 24 [6]
5 1 1 1 12 2 664 785 121 17 58 DistRIBUTION
5 1 1 1 12 3 791 785 61 17 94 BOARD
5 1 1 1 12 4 1753 765 42 39 2 tk
5 1 1 1 12 5 1851 776 26 33 13 %
4 1 1 1 13 0 1741 804 145 18 -1
5 1 1 1 13 1 1741 804 39 18 31 7620
5 1 1 1 13 2 1793 806 7 11 31 _\
5 1 1 1 13 3 1878 810 8 11 41 \
4 1 1 1 14 0 1661 832 250 24 -1
5 1 1 1 14 1 1661 832 71 21 55 (OPTION
5 1 1 1 14 2 1739 832 6 17 55 1
5 1 1 1 14 3 1753 832 158 24 31 COMPOUND),
4 1 1 1 15 0 829 854 1864 32 -1
5 1 1 1 15 1 829 882 11 4 62 +
5 1 1 1 15 2 1763 854 12 32 92 \
5 1 1 1 15 3 1815 854 17 28 49 x
5 1 1 1 15 4 1911 858 16 22 75 \
5 1 1 1 15 5 2682 882 11 4 34 ry
4 1 1 1 16 0 825 881 1865 62 -1
5 1 1 1 16 1 825 889 110 54 0 Hee
5 1 1 1 16 2 1775 883 78 36 24 YN
5 1 1 1 16 3 1927 881 76 38 0 S.¢
5 1 1 1 16 4 2008 903 85 17 71 ANTENNA
5 1 1 1 16 5 2624 909 41 34 30 S|
5 1 1 1 16 6 2677 889 13 40 0 hn
4 1 1 1 17 0 857 910 1836 65 -1
5 1 1 1 17 1 857 917 88 30 33 RSS
5 1 1 1 17 2 1553 910 33 65 10 G7]
5 1 1 1 17 3 1787 922 89 34 10 RO
5 1 1 1 17 4 2567 917 126 38 21 Sees
4 1 1 1 18 0 806 919 1843 76 -1
5 1 1 1 18 1 806 919 146 76 0 rreSee
5 1 1 1 18 2 1236 938 34 34 15 A
5 1 1 1 18 3 1566 943 9 16 0 z
5 1 1 1 18 4 1776 940 123 53 0 wX\
5 1 1 1 18 5 1970 956 7 11 79 >
5 1 1 1 18 6 2566 939 83 49 32 RRS
4 1 1 1 19 0 880 975 1768 70 -1
5 1 1 1 19 1 880 984 71 48 28 SN
5 1 1 1 19 2 1066 1005 31 40 19 ‘|
5 1 1 1 19 3 1779 1000 33 14 51 rm
5 1 1 1 19 4 1900 994 106 39 0 Sh
5 1 1 1 19 5 2127 975 17 63 38 DB
5 1 1 1 19 6 2567 982 81 50 0 atcote
4 1 1 1 20 0 991 1004 1137 100 -1
5 1 1 1 20 1 991 1030 33 33 75 =
5 1 1 1 20 2 1075 1016 21 88 66 I
5 1 1 1 20 3 1118 1056 22 18 15 e
5 1 1 1 20 4 1415 1056 21 18 61 =
5 1 1 1 20 5 1776 1004 45 83 35 I
5 1 1 1 20 6 1852 1026 45 53 6 XS
5 1 1 1 20 7 1926 1024 31 59 44 “hey
5 1 1 1 20 8 2005 1035 13 40 92 \
5 1 1 1 20 9 2060 1028 68 46 67 a
4 1 1 1 21 0 816 1052 1877 89 -1
5 1 1 1 21 1 816 1064 27 52 46 LU
5 1 1 1 21 2 1119 1076 20 30 11 9
5 1 1 1 21 3 1577 1052 47 89 27 |
5 1 1 1 21 4 1727 1100 143 4 52 jt
5 1 1 1 21 5 1893 1070 188 38 39 Oe”
5 1 1 1 21 6 2658 1102 35 2 36 HLL
4 1 1 1 22 0 829 1084 1864 46 -1
5 1 1 1 22 1 829 1108 24 15 24 ED
5 1 1 1 22 2 969 1084 59 41 66 [6]
5 1 1 1 22 3 1112 1103 5 11 3 *
5 1 1 1 22 4 1501 1106 25 16 40 Pa
5 1 1 1 22 5 1712 1100 13 12 27 c
5 1 1 1 22 6 1872 1100 48 12 44 a
5 1 1 1 22 7 1925 1108 17 22 0 q
5 1 1 1 22 8 1988 1100 48 27 20 we
5 1 1 1 22 9 2669 1108 24 20 64 T=
4 1 1 1 23 0 545 1104 2442 67 -1
5 1 1 1 23 1 545 1121 11 42 47 Cc
5 1 1 1 23 2 730 1146 16 19 0 g
5 1 1 1 23 3 815 1104 34 67 26 ba
5 1 1 1 23 4 1075 1105 22 28 0 U
5 1 1 1 23 5 1123 1112 16 47 47 |
5 1 1 1 23 6 1501 1124 2 41 31 |
5 1 1 1 23 7 1626 1140 26 15 30 tay
5 1 1 1 23 8 1712 1113 3 42 57 |
5 1 1 1 23 9 1920 1111 59 49 77 NE
5 1 1 1 23 10 1992 1125 20 17 44 ee
5 1 1 1 23 11 2658 1108 37 44 27 i
5 1 1 1 23 12 2973 1134 14 21 58 c
4 1 1 1 24 0 730 1157 1239 27 -1
5 1 1 1 24 1 730 1165 16 18 37 |
5 1 1 1 24 2 782 1161 57 17 0 915mm'x
5 1 1 1 24 3 860 1161 66 17 12 120mm
5 1 1 1 24 4 932 1161 53 17 95 MOON
5 1 1 1 24 5 1112 1161 5 3 0 ;
5 1 1 1 24 6 1648 1157 4 27 38 iy
5 1 1 1 24 7 1882 1157 3 27 55 i
5 1 1 1 24 8 1956 1160 13 8 32 7
4 1 1 1 25 0 782 1161 1103 54 -1
5 1 1 1 25 1 782 1188 48 17 96 FOOT
5 1 1 1 25 2 834 1187 95 18 96 PLATFORM
5 1 1 1 25 3 934 1189 23 16 56 Wi
5 1 1 1 25 4 1122 1161 17 54 9 |
5 1 1 1 25 5 1501 1181 2 26 49 i
5 1 1 1 25 6 1648 1186 4 27 48 ty
5 1 1 1 25 7 1882 1186 3 27 53 :
4 1 1 1 26 0 782 1205 1866 37 -1
5 1 1 1 26 1 782 1215 83 17 56 H-FRAME.
5 1 1 1 26 2 870 1215 60 17 92 REFER
5 1 1 1 26 3 934 1215 24 18 95 TO
5 1 1 1 26 4 963 1215 58 18 95 SHEET
5 1 1 1 26 5 1112 1205 40 34 0 \s
5 1 1 1 26 6 1501 1210 2 26 64 |
5 1 1 1 26 7 1648 1215 67 27 45 ryt
5 1 1 1 26 8 1882 1215 3 27 32 1
5 1 1 1 26 9 2567 1223 81 16 26 SKS
4 1 1 1 27 0 782 1232 1867 68 -1
5 1 1 1 27 1 782 1243 34 17 83 T2-1
5 1 1 1 27 2 823 1243 37 17 95 FOR
5 1 1 1 27 3 865 1243 72 17 90 DETAILS
5 1 1 1 27 4 1119 1232 291 28 20 a!
5 1 1 1 27 5 1416 1242 19 58 0 n
5 1 1 1 27 6 1603 1261 27 6 8 TT
5 1 1 1 27 7 1712 1244 3 27 50 |
5 1 1 1 27 8 1881 1244 4 27 37 {
5 1 1 1 27 9 2567 1233 82 50 11 S558
4 1 1 1 28 0 829 1264 1864 36 -1
5 1 1 1 28 1 829 1268 68 26 0 TTR
5 1 1 1 28 2 1510 1272 44 25 0 ah
5 1 1 1 28 3 1557 1264 80 36 0 eget
5 1 1 1 28 4 1712 1272 56 26 1 L_}
5 1 1 1 28 5 1796 1265 37 44 74 |
5 1 1 1 28 6 1828 1272 57 26 72 4
5 1 1 1 28 7 2577 1277 60 16 27 $5505
5 1 1 1 28 8 2658 1269 35 2 89 |
4 1 1 1 29 0 515 1254 2475 99 -1
5 1 1 1 29 1 515 1273 83 80 0 KI
5 1 1 1 29 2 825 1275 126 69 55 mss
5 1 1 1 29 3 1090 1250 74 98 7 |]
5 1 1 1 29 4 1141 1254 473 90 30 HS
5 1 1 1 29 5 1654 1287 123 49 36 ee
5 1 1 1 29 6 2567 1275 127 69 30 See]
5 1 1 1 29 7 2972 1282 18 33 10 D
4 1 1 1 30 0 700 1329 2122 57 -1
5 1 1 1 30 1 700 1347 51 19 38 Ba
5 1 1 1 30 2 858 1357 8 12 62 ,
5 1 1 1 30 3 866 1332 251 34 26 BAA
5 1 1 1 30 4 1141 1347 198 19 36 Se
5 1 1 1 30 5 1343 1347 71 19 49 aay
5 1 1 1 30 6 1425 1335 75 44 52 Bal
5 1 1 1 30 7 1515 1329 126 39 34 degen
5 1 1 1 30 8 1611 1325 30 50 0 2F
5 1 1 1 30 9 1652 1335 26 31 32 Oe
5 1 1 1 30 10 1843 1348 67 17 25 =
5 1 1 1 30 11 2115 1332 553 36 30 aa
5 1 1 1 30 12 2671 1349 41 37 19 1).
5 1 1 1 30 13 2735 1347 87 19 53 Bee
4 1 1 1 31 0 700 1364 2120 21 -1
5 1 1 1 31 1 700 1364 79 16 16 BIE
5 1 1 1 31 2 890 1364 224 16 31 SAAS
5 1 1 1 31 3 1141 1360 73 28 36 ee
5 1 1 1 31 4 1221 1364 87 16 0 ESS
5 1 1 1 31 5 1307 1364 23 16 0 IE
5 1 1 1 31 6 1332 1364 82 16 0 PPE
5 1 1 1 31 7 1438 1364 63 16 0 PRS
5 1 1 1 31 8 1514 1364 76 20 19 se
5 1 1 1 31 9 1602 1364 27 19 0 e
5 1 1 1 31 10 1653 1366 22 14 0 Be
5 1 1 1 31 11 1850 1365 43 20 20 TU
5 1 1 1 31 12 1897 1365 16 18 12 cae
5 1 1 1 31 13 1921 1364 58 16 20 RPS
5 1 1 1 31 14 2000 1364 25 16 20 RP
5 1 1 1 31 15 2039 1360 23 29 41 SP
5 1 1 1 31 16 2061 1364 26 16 25 RS
5 1 1 1 31 17 2090 1364 28 16 22 BP
5 1 1 1 31 18 2121 1364 28 16 32 FP
5 1 1 1 31 19 2152 1364 28 16 12 BP
5 1 1 1 31 20 2184 1364 27 16 48 OP
5 1 1 1 31 21 2215 1364 26 16 22 OS
5 1 1 1 31 22 2247 1360 30 29 12 Bed
5 1 1 1 31 23 2276 1364 28 16 22 OP
5 1 1 1 31 24 2307 1364 27 16 26 EP
5 1 1 1 31 25 2339 1360 57 29 27 OPES
5 1 1 1 31 26 2401 1360 30 29 21 SIP
5 1 1 1 31 27 2430 1364 28 16 36 EP
5 1 1 1 31 28 2462 1364 27 16 32 EP
5 1 1 1 31 29 2491 1360 80 29 25 EEE
5 1 1 1 31 30 2571 1364 60 16 25 PEE
5 1 1 1 31 31 2743 1364 77 16 0 FSS
4 1 1 1 32 0 701 1373 2116 53 -1
5 1 1 1 32 1 701 1384 78 25 21 RARE
5 1 1 1 32 2 793 1378 36 28 24 I
5 1 1 1 32 3 840 1373 22 32 46 be:
5 1 1 1 32 4 868 1384 210 27 3 URECKRAAG
5 1 1 1 32 5 1089 1384 139 38 0 OA
5 1 1 1 32 6 1230 1384 63 26 0 KK
5 1 1 1 32 7 1391 1380 98 46 40 CES
5 1 1 1 32 8 1515 1378 114 31 0 Pieri
5 1 1 1 32 9 1652 1384 23 25 70 Y
5 1 1 1 32 10 1857 1380 775 30 0 SONRAKKKKKKKKRKRKKRRKRRGA
5 1 1 1 32 11 2654 1378 51 29 9 a
5 1 1 1 32 12 2726 1384 91 26 0 IRRG
4 1 1 1 33 0 702 1384 973 55 -1
5 1 1 1 33 1 702 1393 107 45 16 RS
5 1 1 1 33 2 866 1384 634 55 19 RRR
5 1 1 1 33 3 1868 1392 814 47 23 OIRO
5 1 1 1 33 4 2646 1362 46 92 34 1
5 1 1 1 33 5 2693 1392 128 47 55 RS
4 1 1 1 34 0 715 1425 2100 30 -1
5 1 1 1 34 1 715 1426 64 29 22 RIS
5 1 1 1 34 2 811 1431 41 23 36 1.
5 1 1 1 34 3 890 1425 610 30 0 NKKASASASKASSAKKKKKK{KKKKKKAKS
5 1 1 1 34 4 1514 1432 119 20 0 HEEEIED
5 1 1 1 34 5 1871 1426 109 29 0 HEA
5 1 1 1 34 6 2021 1421 74 43 0 ASD
5 1 1 1 34 7 2110 1425 115 29 0 AAAS
5 1 1 1 34 8 2236 1426 137 29 0 MAM
5 1 1 1 34 9 2386 1421 101 43 0 AAMAS
5 1 1 1 34 10 2638 1431 44 18 0 MMH
5 1 1 1 34 11 2743 1426 72 29 51 DSS
4 1 1 1 35 0 703 1441 2119 31 -1
5 1 1 1 35 1 703 1441 76 30 39 CRU
5 1 1 1 35 2 790 1450 39 13 17 Mt
5 1 1 1 35 3 840 1445 43 27 11 Vi
5 1 1 1 35 4 890 1442 224 29 0 ROR
5 1 1 1 35 5 1452 1442 68 29 40 VRE
5 1 1 1 35 6 1877 1445 38 26 27 Ht
5 1 1 1 35 7 1921 1442 59 30 11 ROI
5 1 1 1 35 8 1984 1441 647 30 0 RORORORORORRORCRRR
5 1 1 1 35 9 2364 1437 133 44 4 RRR
5 1 1 1 35 10 2544 1437 85 44 4 RR
5 1 1 1 35 11 2669 1445 27 27 50 NN
5 1 1 1 35 12 2722 1442 100 30 52 RRG
4 1 1 1 36 0 715 1458 2101 30 -1
5 1 1 1 36 1 715 1459 64 28 36 BSS
5 1 1 1 36 2 794 1475 19 10 56 =
5 1 1 1 36 3 825 1464 20 23 55 1
5 1 1 1 36 4 864 1477 8 6 42 E
5 1 1 1 36 5 890 1458 190 30 0 SSAAHSHS
5 1 1 1 36 6 1503 1459 172 29 45 SES
5 1 1 1 36 7 1884 1458 408 30 0 SSAA
5 1 1 1 36 8 2268 1454 78 44 45 AS
5 1 1 1 36 9 2437 1458 84 30 69 MM
5 1 1 1 36 10 2525 1474 135 12 36 Mw
5 1 1 1 36 11 2669 1464 45 22 31 EE
5 1 1 1 36 12 2743 1458 73 29 45 SSS
4 1 1 1 37 0 703 1473 2129 39 -1
5 1 1 1 37 1 703 1475 76 28 34 POY
5 1 1 1 37 2 794 1479 85 25 17 Zh
5 1 1 1 37 3 890 1475 163 29 53 RRRRRY
5 1 1 1 37 4 1503 1473 172 39 0 RRR
5 1 1 1 37 5 1907 1475 293 28 0 ‘QRARRRRE
5 1 1 1 37 6 2205 1475 36 22 3 ERT
5 1 1 1 37 7 2401 1474 248 29 11 PRIOR
5 1 1 1 37 8 2668 1479 33 22 36 NN
5 1 1 1 37 9 2723 1475 109 30 53 RAR
4 1 1 1 38 0 715 1491 2123 30 -1
5 1 1 1 38 1 715 1492 64 27 67 SS
5 1 1 1 38 2 796 1493 120 27 18 BEES
5 1 1 1 38 3 947 1491 67 30 18 SSS
5 1 1 1 38 4 1174 1497 103 17 96 COMPOUND
5 1 1 1 38 5 1282 1497 61 17 87 FINISH.
5 1 1 1 38 6 1350 1497 58 17 94 REFER
5 1 1 1 38 7 1600 1491 75 29 77 SS
5 1 1 1 38 8 1921 1498 142 23 13 ESSA
5 1 1 1 38 9 2074 1491 54 30 30 HY
5 1 1 1 38 10 2485 1491 215 30 0 SIA!
5 1 1 1 38 11 2730 1491 108 29 45 BSS
4 1 1 1 39 0 704 1507 2128 30 -1
5 1 1 1 39 1 704 1508 75 28 39 VAY
5 1 1 1 39 2 799 1520 15 10 23 ts
5 1 1 1 39 3 825 1522 4 13 76 |
5 1 1 1 39 4 840 1517 17 13 34 IS
5 1 1 1 39 5 890 1507 136 30 43 RRR
5 1 1 1 39 6 1616 1514 37 22 48 ROR
5 1 1 1 39 7 1984 1507 117 30 19 QRARRA.
5 1 1 1 39 8 2499 1507 132 30 10 RRR
5 1 1 1 39 9 2678 1517 22 18 26 NT
5 1 1 1 39 10 2727 1507 105 30 71 RRR
4 1 1 1 40 0 715 1513 2129 56 -1
5 1 1 1 40 1 715 1523 73 39 27 GEN.
5 1 1 1 40 2 797 1530 76 26 0 #1
5 1 1 1 40 3 890 1523 130 46 36 IOS
5 1 1 1 40 4 1175 1513 55 54 96 SHEET
5 1 1 1 40 5 1238 1513 14 54 61 SO
5 1 1 1 40 6 1261 1524 45 18 25 NOTE
5 1 1 1 40 7 1310 1513 10 54 25 7
5 1 1 1 40 8 1603 1524 72 44 0 OW
5 1 1 1 40 9 1921 1524 108 45 35 OMS
5 1 1 1 40 10 2519 1523 186 45 39 SYN
5 1 1 1 40 11 2717 1523 127 46 40 DOs
4 1 1 1 41 0 722 1554 2093 35 -1
5 1 1 1 41 1 722 1554 282 35 6 NSSSSrorrn~
5 1 1 1 41 2 1174 1566 123 17 96 ELECTRONICS
5 1 1 1 41 3 1302 1566 108 17 96 ENCLOSURE
5 1 1 1 41 4 1603 1557 72 28 28 RRA
5 1 1 1 41 5 1927 1557 37 29 69 NS
5 1 1 1 41 6 2553 1556 98 33 21 RRA
5 1 1 1 41 7 2702 1554 113 35 18 ISARY
4 1 1 1 42 0 724 1572 2075 56 -1
5 1 1 1 42 1 724 1573 273 40 72 RRRRRRRRR
5 1 1 1 42 2 1175 1593 83 17 95 SUPPORT
5 1 1 1 42 3 1264 1593 119 18 96 FOUNDATION.
5 1 1 1 42 4 1388 1594 60 16 96 REFER
5 1 1 1 42 5 1452 1593 23 17 95 TO
5 1 1 1 42 6 1616 1573 61 55 39 SA
5 1 1 1 42 7 1686 1588 22 28 21 ce
5 1 1 1 42 8 1921 1572 50 53 37 AY
5 1 1 1 42 9 2591 1573 208 39 0 RRRRRAGO
4 1 1 1 43 0 1175 1615 1186 55 -1
5 1 1 1 43 1 1175 1621 58 17 68 SHEET
5 1 1 1 43 2 1237 1621 20 16 46 T2
5 1 1 1 43 3 1263 1621 36 17 84 FOR
5 1 1 1 43 4 1304 1621 72 17 84 DETALS
5 1 1 1 43 5 1632 1615 43 46 42 SS
5 1 1 1 43 6 1696 1616 29 30 14 ee
5 1 1 1 43 7 1828 1643 13 2 62 -
5 1 1 1 43 8 1921 1615 28 55 24 SS
5 1 1 1 43 9 2043 1644 31 16 82 N12x
5 1 1 1 43 10 2093 1644 29 17 87 450
5 1 1 1 43 11 2128 1644 47 17 96 LONG
5 1 1 1 43 12 2182 1644 86 17 95 INSERTED
5 1 1 1 43 13 2274 1644 87 17 96 THROUGH
4 1 1 1 44 0 1649 1646 439 19 -1
5 1 1 1 44 1 1649 1651 4 4 66 7
5 1 1 1 44 2 1682 1648 27 17 9 OE
5 1 1 1 44 3 1721 1654 6 7 29 wa
5 1 1 1 44 4 1921 1646 27 12 68 Ox
5 1 1 1 44 5 2079 1649 9 11 93 x
4 1 1 1 45 0 1175 1643 1168 77 -1
5 1 1 1 45 1 1175 1654 67 53 25 SCOR
5 1 1 1 45 2 1246 1654 62 53 0 ETARS
5 1 1 1 45 3 1321 1659 59 16 96 REFER
5 1 1 1 45 4 1385 1658 23 17 93 TO
5 1 1 1 45 5 1414 1658 57 17 91 SHEET-
5 1 1 1 45 6 1643 1648 33 55 38 y
5 1 1 1 45 7 1689 1662 19 33 35 8
5 1 1 1 45 8 1716 1643 54 59 7 wal
5 1 1 1 45 9 1921 1649 32 71 4 De
5 1 1 1 45 10 2043 1672 36 16 90 CHS
5 1 1 1 45 11 2085 1672 24 16 95 TO
5 1 1 1 45 12 2115 1672 81 16 96 PREVENT
5 1 1 1 45 13 2202 1672 48 16 95 MAST
5 1 1 1 45 14 2254 1672 89 16 96 ROTATION
4 1 1 1 46 0 498 1704 1446 79 -1
5 1 1 1 46 1 498 1740 10 24 56 ‘
5 1 1 1 46 2 1658 1705 39 78 13 iS
5 1 1 1 46 3 1745 1705 83 78 51 NS
5 1 1 1 46 4 1829 1704 115 79 50 SS
4 1 1 1 47 0 1959 1753 18 20 -1
5 1 1 1 47 1 1959 1753 18 20 88 8
4 1 1 1 48 0 498 1766 1478 19 -1
5 1 1 1 48 1 498 1766 10 19 63 2
5 1 1 1 48 2 1959 1775 17 6 54 =
4 1 1 1 49 0 498 1783 1125 35 -1
5 1 1 1 49 1 498 1788 10 24 5 &
5 1 1 1 49 2 1215 1783 205 35 96 EQUIPMENT
5 1 1 1 49 3 1432 1783 191 33 96 ELEVATION
4 1 1 1 50 0 498 1816 2419 32 -1
5 1 1 1 50 1 498 1816 10 24 77 }
5 1 1 1 50 2 1213 1824 57 16 95 SCALE
5 1 1 1 50 3 1277 1824 32 16 95 1:25
5 1 1 1 50 4 2557 1816 72 32 96 FOR
5 1 1 1 50 5 2639 1816 278 32 96 CONSTRUCTION
4 1 1 1 51 0 498 1842 1696 55 -1
5 1 1 1 51 1 498 1842 10 55 0 ;
5 1 1 1 51 2 1186 1847 39 39 90 500
5 1 1 1 51 3 1331 1852 10 17 77 9
5 1 1 1 51 4 1439 1852 29 30 59 500
5 1 1 1 51 5 1558 1852 37 17 25 1000
5 1 1 1 51 6 1608 1866 56 16 0 coare
5 1 1 1 51 7 1670 1866 33 16 21 4225
5 1 1 1 51 8 1723 1857 23 17 58 TO
5 1 1 1 51 9 1751 1857 23 17 58 BE
5 1 1 1 51 10 1779 1857 48 17 58 READ
5 1 1 1 51 11 1833 1858 16 16 88 IN
5 1 1 1 51 12 1855 1857 125 17 96 CONJUNCTION
5 1 1 1 51 13 1986 1857 44 17 96 WITH
5 1 1 1 51 14 2036 1857 69 17 93 SHEETS
5 1 1 1 51 15 2110 1857 19 17 81 S1
5 1 1 1 51 16 2137 1858 11 16 89 &
5 1 1 1 51 17 2153 1857 41 17 82 S1-1.
4 1 1 1 52 0 504 1887 1995 29 -1
5 1 1 1 52 1 504 1899 2 4 20 ;
5 1 1 1 52 2 1220 1898 41 17 90 FALL
5 1 1 1 52 3 1266 1898 48 18 90 BACK
5 1 1 1 52 4 1318 1898 66 18 95 OPTION
5 1 1 1 52 5 1389 1898 104 18 93 COMPOUND
5 1 1 1 52 6 1498 1898 46 18 89 LAYO
5 1 1 1 52 7 1709 1883 70 41 71 (ORDER
5 1 1 1 52 8 1781 1883 76 41 73 |DRAWN|
5 1 1 1 52 9 1860 1883 42 41 69 CHKD
5 1 1 1 52 10 1901 1883 14 41 46 |
5 1 1 1 52 11 2044 1883 97 41 32 AMENDMENT.
5 1 1 1 52 12 2143 1883 141 41 30 =|
5 1 1 1 52 13 2283 1883 35 41 41 EXAM
5 1 1 1 52 14 2324 1883 8 41 41 |
5 1 1 1 52 15 2338 1883 56 41 27 APPD|
5 1 1 1 52 16 2396 1883 107 41 0 DATES)
4 1 1 1 53 0 498 1892 2308 59 -1
5 1 1 1 53 1 498 1905 13 44 74 i
5 1 1 1 53 2 1214 1898 5 21 36 }
5 1 1 1 53 3 1545 1894 28 55 3 me
5 1 1 1 53 4 1728 1906 54 43 68 783829
5 1 1 1 53 5 1906 1906 30 43 85 FOR
5 1 1 1 53 6 1938 1922 99 17 56 CONSTRUCTION
5 1 1 1 53 7 2041 1922 226 17 16 -SPANSTHOOIEDOWN
5 1 1 1 53 8 2189 1906 15 43 48 -
5 1 1 1 53 9 2203 1922 59 17 48 SATELLITE
5 1 1 1 53 10 2395 1906 65 44 67 18.06.21
5 1 1 1 53 11 2642 1892 78 59 24 Gel
5 1 1 1 53 12 2719 1894 87 57 95 stra
4 1 1 1 54 0 498 1952 2467 32 -1
5 1 1 1 54 1 498 1952 13 22 25 i
5 1 1 1 54 2 1650 1974 17 10 0 S
5 1 1 1 54 3 2504 1955 128 24 93 SATELLITE
5 1 1 1 54 4 2638 1955 101 24 96 ACCESS
5 1 1 1 54 5 2748 1955 68 24 96 NODE
5 1 1 1 54 6 2824 1955 53 23 95 SITE
5 1 1 1 54 7 2887 1955 78 24 43 183929)
4 1 1 1 55 0 498 1970 2362 63 -1
5 1 1 1 55 1 498 1975 13 58 45 i
5 1 1 1 55 2 623 1970 94 50 91 NOTES:
5 1 1 1 55 3 1388 1974 198 34 96 OMPLIANCE
5 1 1 1 55 4 1598 1975 48 32 87 BO.
5 1 1 1 55 5 2610 1992 108 24 96 POMONA
5 1 1 1 55 6 2725 1992 135 24 96 EXCHANGE
4 1 1 1 56 0 498 2004 2491 59 -1
5 1 1 1 56 1 498 2036 10 27 52 j
5 1 1 1 56 2 621 2026 12 16 58 1.
5 1 1 1 56 3 666 2026 36 16 37 FOR
5 1 1 1 56 4 707 2026 38 16 37 SITE
5 1 1 1 56 5 751 2026 79 16 96 SPECIFIC
5 1 1 1 56 6 836 2026 59 16 96 NOTES
5 1 1 1 56 7 901 2026 59 16 96 REFER
5 1 1 1 56 8 964 2026 24 16 96 TO
5 1 1 1 56 9 993 2026 69 16 93 SHEETS
5 1 1 1 56 10 1068 2026 21 16 73 S0
5 1 1 1 56 11 1094 2026 12 16 91 &
5 1 1 1 56 12 1111 2026 41 16 35 S0-1.
5 1 1 1 56 13 1340 2013 130 20 96 COMPLETED
5 1 1 1 56 14 1475 2013 28 20 96 AS
5 1 1 1 56 15 1510 2013 42 20 96 PER
5 1 1 1 56 16 1559 2013 78 20 96 DESIGN
5 1 1 1 56 17 1637 2004 56 47 11 is
5 1 1 1 56 18 2658 2032 46 16 95 EAST
5 1 1 1 56 19 2708 2032 97 16 95 ELEVATION
5 1 1 1 56 20 2977 2037 12 20 93 F
4 1 1 1 57 0 498 2039 2411 61 -1
5 1 1 1 57 1 498 2064 10 12 1 z
5 1 1 1 57 2 621 2050 14 18 79 2.
5 1 1 1 57 3 666 2044 78 53 0 Siineg
5 1 1 1 57 4 750 2050 53 18 95 SIGNS
5 1 1 1 57 5 809 2050 60 18 93 NOTED
5 1 1 1 57 6 874 2047 114 27 22 ASRAYREFER
5 1 1 1 57 7 992 2050 25 18 95 TO
5 1 1 1 57 8 1021 2050 59 18 91 005486
5 1 1 1 57 9 1085 2050 111 18 96 DOCUMENTS
5 1 1 1 57 10 1201 2050 38 18 96 FOR
5 1 1 1 57 11 1326 2044 53 52 76 an
5 1 1 1 57 12 1454 2044 31 56 39 lag
5 1 1 1 57 13 1491 2048 19 20 96 IN
5 1 1 1 57 14 1518 2048 44 20 96 RED
5 1 1 1 57 15 1667 2039 10 40 59 oO
5 1 1 1 57 16 2555 2061 19 16 96 25
5 1 1 1 57 17 2579 2061 78 16 95 RAILWAY
5 1 1 1 57 18 2662 2061 75 20 96 PARADE,
5 1 1 1 57 19 2743 2061 81 20 96 POMONA,
5 1 1 1 57 20 2830 2061 35 17 95 QLD
5 1 1 1 57 21 2871 2061 38 16 95 4568
4 1 1 1 58 0 621 2082 2140 51 -1
5 1 1 1 58 1 621 2101 13 18 74 3,
5 1 1 1 58 2 666 2101 32 17 23 ALL
5 1 1 1 58 3 703 2085 105 44 78 DIMENSIONS
5 1 1 1 58 4 807 2085 38 44 85 ARE
5 1 1 1 58 5 859 2101 16 18 85 IN
5 1 1 1 58 6 881 2101 115 18 86 MILLIMETRES
5 1 1 1 58 7 1002 2101 68 18 96 UNLESS
5 1 1 1 58 8 1076 2101 105 18 94 OTHERWISE
5 1 1 1 58 9 1186 2101 72 18 96 STATED,
5 1 1 1 58 10 1332 2084 90 43 94 SIGNATURE
5 1 1 1 58 11 1556 2082 49 44 96 DATE
5 1 1 1 58 12 2508 2098 33 30 32 R=
5 1 1 1 58 13 2594 2099 167 34 27 QC100259
4 1 1 1 59 0 498 2143 2468 20 -1
5 1 1 1 59 1 498 2151 10 6 25 e
5 1 1 1 59 2 692 2143 1057 20 19 PBN
5 1 1 1 59 3 2351 2139 33 33 5 ee
5 1 1 1 59 4 2734 2156 2 2 71 I
5 1 1 1 59 5 2963 2148 3 6 37 4
4 1 1 1 60 0 512 2139 2219 54 -1
5 1 1 1 60 1 512 2167 21 22 90 The
5 1 1 1 60 2 532 2167 48 22 75 copyright
5 1 1 1 60 3 581 2167 20 22 90 and
5 1 1 1 60 4 602 2167 48 22 66 ownership
5 1 1 1 60 5 651 2167 12 22 90 of
5 1 1 1 60 6 666 2167 17 22 48 hiv
5 1 1 1 60 7 682 2167 38 22 88 drewing
5 1 1 1 60 8 721 2167 10 22 39 iv
5 1 1 1 60 9 732 2167 43 22 49 eesigned
5 1 1 1 60 10 776 2167 12 22 91 fo
5 1 1 1 60 11 790 2167 32 22 8 Tetrire
5 1 1 1 60 12 822 2167 22 22 91 and
5 1 1 1 60 13 844 2167 24 22 84 must
5 1 1 1 60 14 869 2167 18 22 86 not
5 1 1 1 60 15 886 2167 15 22 94 be
5 1 1 1 60 16 902 2167 30 22 79 copied
5 1 1 1 60 17 935 2167 12 22 85 or
5 1 1 1 60 18 950 2167 28 22 53 served
5 1 1 1 60 19 979 2167 49 22 4 skeewhare
5 1 1 1 60 20 1029 2167 35 22 63 without
5 1 1 1 60 21 1065 2167 31 22 13 writen
5 1 1 1 60 22 1098 2167 53 22 26 permiesion
5 1 1 1 60 23 1152 2167 21 22 58 from
5 1 1 1 60 24 1177 2167 40 22 0 Teter.
5 1 1 1 60 25 1728 2139 39 51 56 SZ
5 1 1 1 60 26 1779 2144 74 14 36 ae
5 1 1 1 60 27 1908 2149 7 13 42 :
5 1 1 1 60 28 2611 2140 120 53 0 —_E_r
4 1 1 1 61 0 1918 2288 289 44 -1
5 1 1 1 61 1 1918 2288 105 44 95 Page
5 1 1 1 61 2 2039 2289 41 34 95 31
5 1 1 1 61 3 2104 2288 40 35 96 of
5 1 1 1 61 4 2159 2289 48 34 96 96Section 32
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Page 32 of 96
“0
2o
i. 2
— 3
te ’
qo NOTES:
5 7620 1. REFER TO DRAWING 017886P201 SHEET 4
od Oy 7 : f ; ; ; ; . c , ; ; 7 __ ; : , 7 p : : FOR ADDITIONAL CONNECTION DETAILS.
q = “\ ge CONNECTION FENCE CONNECTION fT 2 Te sore act ene
qi \ ‘- “ays
aS C ) MINIMUM DEPTH OF 500mm.
gq S et RR ER Bh Bh 3. TELSTRA EXCHANGE SITES WILL HAVE AN
- EXISTING EARTHING SYSTEM PRESENT.
7 7 \_—SEBISPC SHALL BE MOUNTED / 7} CHECK RECORDS FOR LOCATION. NOTE
V/ATLOWERLEVEL ON f= — 35mm* GY CABLE / THAT THERE MAY BE AN OBSOLETE SYSTEM
N I m '}HERAMEMAINSIRATORS 4 CONDUIT xe 4 _INSITU, TESTING WILL BE REQUIRED TO
x ! 7 ENSURE THAT EARTHING SYSTEM IS IN
| a» i SUPPORT POST: | SERVICE.
ik a _TD-EARTH SRID aw"? 4, SEBISPC FOR SAN INSTALLATION SHALL BE
y 4 ioN I aco ne CONNECTED TO EXISTING SERVICE EARTH
| I re]! , wT f ate gat | VIAA BOLTED CONNECTION THAT CAN BE
‘ ue + LH a i Coa eory AER ~ _ BONDIS TO BE UNDERTAKEN EXTERNAL TO
}——— Alina BROKEN FOR EARTH SYSTEM TESTING. THE
Fir UY ERE EA
fe FT , oO i ful ep tgeidhs EN THE BUILDING AND MUST NOT RUN VIA
7 1 d et fi EQUIPMENT AREAS.
8 a I | / AeA | | 5. STANDARD ELECTRODES TO BE STAINLESS
| ! / ate ete a doa STEEL CLAD ROD (S/ 448/16) 1440mm LONG
Fito rf iy aE eae Feet AT SPACING OF MINIMUM 2 ELECTRODES
— L—7 esha ee PA mss,
] F OT OES SUES Te Cee ARE TO BE INSTALLED AND
é | ie | eer Lea | PLACED WITHIN PIP2INSPECTIONPTT, |,
LA Giese nd AS SP a
. i \ AAS ee ‘7. 19/.6amm GREEN AND YELLOW COPPER
“* « 7” yy, CABLE SHALL RUN FROM THE PROPOSED
” / CERRY SEBYSPC FOR SAN INSTALL, TERMINATE AT
L at ” Su {ELECTRODE AND CONTINUE TO EXISTING
=e" Fea SERVICE EARTH SYSTEM.
ke _- - 8. REFER TO EARTHING GUIDELINES SHEET
- ’ G42 AND G43.
; Ee a 9. ALL CONNECTIONS TO EARTH ELECTRODES
| / / | AND JOINTS ARE TO BE TREATED WITH
! v DENSO PASTE AND TAPE.
~ / 40, WHERE ELECTRODES CAN NOT BE DRIVEN
—— ————- hr —¢~-—p—t OR EARTH RESISTIVITY IS HIGH, DRILLING
‘ MAY BE REQUIRED, PRE-DRILLED HOLES
TO TELSTRA | SHALL BE BACK FILLED WITH EARTH
icoe } PLAN VIEW ENHANCING COMPOUND (E.G CALCIUM
/ BENTONITE AND GYPSUM SLURRY)
(WHICHEVER IS CLOSER) / 1, WHERE FENCING IS REQUIRED,
/ SCALE 1:25 INTERCONNECT TO FENCE POSTS AT GATE.
REFER DRAWING 017866P201 SHEET 1.
EARTH ELECTRODE SCHEDULE
P TYPE _| DIAMETER] QUANTITY] DEPTH]
[vm |_|
ROD :
EARTH GRID SCHEDULE
[__DIMENSIONS _|
HOT DIPPED GALVANISED MSFLAT | 50xamm_ —_| FOR CONSTRUCTION
LEGEND NOTE: THIS DRAWING TO BE READ IN CONJUNCTION WITH SHEET G4-2
SS (ORDER |DRAWN| CHKD | AMENDMENT. =| EXAM | PPD DATE_| 8)
EARTH STRAP 2 = 783829 FOR CONSTRUCTION -SPANSETHHOOISDOWN - SATELLITE 18.06.21
35mmrf GY INSULATED CABLE (19/1.53), —--—e—— OMPLIANCE HOR SATELLITE ACCESS NODE SITE 183929
EARTH INSPECTIONPIT (_e_) IANCE BO POMONA EXCHANGE
COMPLETED AS PER DESIGN 4
SITE FENCING. —/——7———r——_— SITE EARTHING - OPTION 1 F
ALTERATIONS IN RED O 25 RAILWAY PARADE, POMONA, QLD 4568
EARTH ELECTRODE @ NAME (PRINT) ”
SERVICE EARTH BAR oes SEB — a EneaiiemaroneeTase Menem dee QC100259
Od NE Gad ir OCTOOD eg A
The copyright and ownership of hiv drewing iv eesigned fo Tetrire and must not be copied or served skeewhare without writen permiesion from Teter.
Page 32 of 96Section 33
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Page 33 of 96
q
m
=
m
a
>
-
‘ a 0/90 (2JBO UOISJaA * | UOISIaA, Q
| =
| =
; =-
i =
2 m
j m
=
i m
i m
i a
=
©
5
zg a lz m
| a2 2 lbgs0328 >
i F acnears >
” sem 282q0 &
a Bega" &
m eo
ze a ee —t— et ¢—— 1 + — 2
Te nl se [\ | | Ul Tal
2 a2 oo | \ | a
fae Pe ae 3g tage }lCU\ | of gg g
3a
5 1 1 1 32 2 562 1418 42 34 46 23
5 1 1 1 32 3 725 1414 31 38 40 =!
5 1 1 1 32 4 960 1418 93 38 0 4Ete
5 1 1 1 32 5 1221 1423 12 9 43 4
5 1 1 1 32 6 1414 1425 12 9 93 +
5 1 1 1 32 7 1578 1388 2 63 96 |
5 1 1 1 32 8 1704 1395 17 47 26 é
5 1 1 1 32 9 1873 1395 40 36 20 eS
4 1 1 1 33 0 413 1410 1503 75 -1
5 1 1 1 33 1 413 1440 88 45 0 Zo4
5 1 1 1 33 2 554 1436 15 60 0 3s
5 1 1 1 33 3 727 1447 42 28 79 23
5 1 1 1 33 4 960 1444 92 35 0 Bag8
5 1 1 1 33 5 1230 1436 22 37 92 \
5 1 1 1 33 6 1282 1443 148 29 48 ess
5 1 1 1 33 7 1472 1435 114 35 31 tk
5 1 1 1 33 8 1679 1410 37 49 0 F
5 1 1 1 33 9 1898 1431 18 27 60 Z
4 1 1 1 34 0 413 1459 1503 55 -1
5 1 1 1 34 1 413 1475 93 39 20 2a5]
5 1 1 1 34 2 562 1461 16 47 35 &
5 1 1 1 34 3 726 1459 43 49 40 28
5 1 1 1 34 4 960 1469 93 45 44 Bega
5 1 1 1 34 5 1164 1488 13 15 26 /\
5 1 1 1 34 6 1252 1465 273 38 16 ‘Get
5 1 1 1 34 7 1679 1460 42 36 0 “:
5 1 1 1 34 8 1898 1459 18 26 76 3
4 1 1 1 35 0 413 1491 1308 63 -1
5 1 1 1 35 1 413 1510 93 27 33 awe
5 1 1 1 35 2 562 1513 16 37 0 g
5 1 1 1 35 3 725 1509 44 45 72 33
5 1 1 1 35 4 984 1491 31 51 11 5M
5 1 1 1 35 5 1180 1505 20 28 0 \,
5 1 1 1 35 6 1267 1506 51 28 52 “A
5 1 1 1 35 7 1421 1504 26 9 33 ay
5 1 1 1 35 8 1513 1501 12 16 34 3
5 1 1 1 35 9 1704 1497 17 19 53 8
4 1 1 1 36 0 413 1526 1173 47 -1
5 1 1 1 36 1 413 1533 93 40 50 S20)
5 1 1 1 36 2 562 1550 16 22 92 2
5 1 1 1 36 3 752 1555 17 12 28 3
5 1 1 1 36 4 984 1542 17 24 76 2
5 1 1 1 36 5 1035 1537 17 22 74 3
5 1 1 1 36 6 1202 1534 26 33 50 \
5 1 1 1 36 7 1299 1538 5 27 64 \E
5 1 1 1 36 8 1516 1526 4 26 0 |
4 1 1 1 37 0 365 1542 1215 70 -1
5 1 1 1 37 1 365 1568 15 37 0 s
5 1 1 1 37 2 448 1566 58 40 28 BM
5 1 1 1 37 3 726 1557 43 47 63 28
5 1 1 1 37 4 984 1567 18 35 27 5
5 1 1 1 37 5 1035 1560 17 11 32 =
5 1 1 1 37 6 1229 1567 75 19 4 ye
5 1 1 1 37 7 1516 1558 4 25 63 |
5 1 1 1 37 8 1578 1548 2 64 63 |
4 1 1 1 38 0 475 1581 1390 37 -1
5 1 1 1 38 1 475 1598 31 20 0 =
5 1 1 1 38 2 1066 1596 53 18 0 ~
5 1 1 1 38 3 1242 1585 11 11 50 *
5 1 1 1 38 4 1295 1581 117 25 1 Nu
5 1 1 1 38 5 1847 1591 18 4 87 =
4 1 1 1 39 0 448 1587 1468 92 -1
5 1 1 1 39 1 448 1607 58 39 46 86
5 1 1 1 39 2 984 1603 17 23 48 a
5 1 1 1 39 3 1122 1608 17 71 92 ]
5 1 1 1 39 4 1254 1597 30 30 25 \.
5 1 1 1 39 5 1292 1587 47 59 28 GRR
5 1 1 1 39 6 1363 1591 45 43 19 Fb
5 1 1 1 39 7 1513 1590 12 50 18 1
5 1 1 1 39 8 1847 1591 69 82 31 ie
4 1 1 1 40 0 406 1615 1484 78 -1
5 1 1 1 40 1 406 1661 67 32 83 oo
5 1 1 1 40 2 1244 1654 64 27 3 ABIES»,
5 1 1 1 40 3 1516 1649 4 26 71 |
5 1 1 1 40 4 1573 1615 13 77 54 ]
5 1 1 1 40 5 1873 1643 17 23 57 i
4 1 1 1 41 0 1242 1645 739 95 -1
5 1 1 1 41 1 1242 1645 283 95 0 o\s
5 1 1 1 41 2 1573 1696 13 10 89 |
5 1 1 1 41 3 1847 1667 68 52 0 su]
5 1 1 1 41 4 1959 1645 22 64 51 3
4 1 1 1 42 0 542 1699 1432 47 -1
5 1 1 1 42 1 542 1728 17 18 72 =
5 1 1 1 42 2 1261 1715 33 11 16 SB
5 1 1 1 42 3 1844 1703 72 32 20 oem
5 1 1 1 42 4 1955 1699 19 37 70 =x
4 1 1 1 43 0 319 1710 1728 99 -1
5 1 1 1 43 1 319 1737 19 33 71 N
5 1 1 1 43 2 937 1753 150 56 0 geaep
5 1 1 1 43 3 1127 1763 13 11 55 y
5 1 1 1 43 4 1303 1742 104 52 22 Ey
5 1 1 1 43 5 1513 1747 12 51 28 |
5 1 1 1 43 6 1578 1710 2 64 95 |
5 1 1 1 43 7 1898 1734 83 36 6 2/8
5 1 1 1 43 8 2027 1737 20 33 6 1p
4 1 1 1 44 0 962 1771 953 32 -1
5 1 1 1 44 1 962 1782 44 15 47 Ba
5 1 1 1 44 2 1331 1780 28 20 7 eer
5 1 1 1 44 3 1370 1776 46 27 28 es
5 1 1 1 44 4 1573 1776 13 10 10 -
5 1 1 1 44 5 1898 1771 17 11 33 8
4 1 1 1 45 0 962 1832 1019 38 -1
5 1 1 1 45 1 962 1842 125 28 28 gaeS
5 1 1 1 45 2 1326 1832 38 29 11 ae
5 1 1 1 45 3 1411 1853 10 17 21 A
5 1 1 1 45 4 1516 1836 4 26 90 |
5 1 1 1 45 5 1674 1834 47 25 61 BE
5 1 1 1 45 6 1873 1834 43 25 33 ae]
5 1 1 1 45 7 1959 1839 22 14 33 m
4 1 1 1 46 0 349 1847 1632 83 -1
5 1 1 1 46 1 349 1847 245 83 44 yale
5 1 1 1 46 2 937 1861 69 52 10 278
5 1 1 1 46 3 1054 1875 33 30 57 2
5 1 1 1 46 4 1133 1857 3 64 79 |
5 1 1 1 46 5 1351 1863 174 51 12 To:
5 1 1 1 46 6 1573 1856 13 12 55 |
5 1 1 1 46 7 1606 1843 42 82 84 |
5 1 1 1 46 8 1679 1858 42 47 41 Re
5 1 1 1 46 9 1873 1858 43 40 5 aa|
5 1 1 1 46 10 1959 1855 22 35 0 #
4 1 1 1 47 0 159 1892 1822 63 -1
5 1 1 1 47 1 159 1918 34 26 1 u
5 1 1 1 47 2 353 1921 14 29 24 3
5 1 1 1 47 3 542 1914 16 26 45 a
5 1 1 1 47 4 937 1899 69 56 0 a5@
5 1 1 1 47 5 1054 1909 33 24 86 @
5 1 1 1 47 6 1351 1895 169 48 36 ie
5 1 1 1 47 7 1679 1905 42 35 63 ae
5 1 1 1 47 8 1873 1893 42 33 0 g8
5 1 1 1 47 9 1917 1882 23 65 55 |
4 1 1 1 48 0 158 1923 2167 47 -1
5 1 1 1 48 1 158 1947 26 23 0 o
5 1 1 1 48 2 326 1964 3 2 0 :
5 1 1 1 48 3 937 1943 69 26 68 Ban
5 1 1 1 48 4 1054 1945 33 21 0 1
5 1 1 1 48 5 1348 1945 16 13 58 4
5 1 1 1 48 6 1430 1931 5 19 38 {
5 1 1 1 48 7 1516 1927 4 26 81 |
5 1 1 1 48 8 1675 1926 46 35 62 Bas
5 1 1 1 48 9 1873 1923 33 37 54 43d
5 1 1 1 48 10 2292 1937 33 14 30 _
4 1 1 1 49 0 149 1947 1890 60 -1
5 1 1 1 49 1 149 1973 35 23 0 <
5 1 1 1 49 2 353 1988 14 19 85 =
5 1 1 1 49 3 937 1955 69 38 0 Ba
5 1 1 1 49 4 1065 1962 11 38 63 oO
5 1 1 1 49 5 1429 1954 5 19 39 |
5 1 1 1 49 6 1516 1959 4 26 92 |
5 1 1 1 49 7 1704 1947 17 23 0 e
5 1 1 1 49 8 1869 1950 46 33 96 ag
5 1 1 1 49 9 2036 1965 3 1 17 i
4 1 1 1 50 0 158 1960 2167 63 -1
5 1 1 1 50 1 158 2000 26 23 50 ©
5 1 1 1 50 2 353 2008 14 10 0 s
5 1 1 1 50 3 937 1999 16 10 66 =
5 1 1 1 50 4 988 1987 18 25 75 8
5 1 1 1 50 5 1055 1994 32 20 53 Mm
5 1 1 1 50 6 1425 1977 10 31 85 !
5 1 1 1 50 7 1513 1993 12 16 0 s
5 1 1 1 50 8 1704 1975 17 25 35 &
5 1 1 1 50 9 1898 1969 17 22 41 5
5 1 1 1 50 10 2291 1960 34 23 54 2
4 1 1 1 51 0 353 1983 1561 55 -1
5 1 1 1 51 1 353 2021 14 16 47 8
5 1 1 1 51 2 542 2001 17 36 41 3
5 1 1 1 51 3 937 2009 150 29 47 $322
5 1 1 1 51 4 1428 2013 7 20 45 \
5 1 1 1 51 5 1573 2017 13 11 18 -
5 1 1 1 51 6 1704 2006 17 13 35 5
5 1 1 1 51 7 1869 1983 45 32 21 ef
4 1 1 1 52 0 158 2001 2168 80 -1
5 1 1 1 52 1 158 2039 34 23 31 0
5 1 1 1 52 2 353 2041 14 21 65 g
5 1 1 1 52 3 542 2041 16 15 27 2
5 1 1 1 52 4 937 2027 70 38 53 a2
5 1 1 1 52 5 1055 2040 32 24 34 S
5 1 1 1 52 6 1133 2019 3 62 83 |
5 1 1 1 52 7 1432 2036 8 19 0 »
5 1 1 1 52 8 1516 2019 4 25 60 |
5 1 1 1 52 9 1704 2020 17 22 44 a
5 1 1 1 52 10 1898 2015 18 22 46 a
5 1 1 1 52 11 2292 2001 34 33 54 =
4 1 1 1 53 0 158 2032 2168 67 -1
5 1 1 1 53 1 158 2039 27 52 23 Oo
5 1 1 1 53 2 353 2067 14 24 0 :
5 1 1 1 53 3 937 2070 16 29 53 Z
5 1 1 1 53 4 1051 2041 36 52 20 ag
5 1 1 1 53 5 1437 2050 83 38 33 Li
5 1 1 1 53 6 1578 2032 2 63 96 |
5 1 1 1 53 7 1704 2043 17 34 46 &
5 1 1 1 53 8 1894 2039 21 44 62 al
5 1 1 1 53 9 2292 2038 34 31 95 >
4 1 1 1 54 0 158 2070 2168 58 -1
5 1 1 1 54 1 158 2104 26 24 12 °
5 1 1 1 54 2 353 2095 14 24 22 3
5 1 1 1 54 3 1054 2092 33 34 90 5
5 1 1 1 54 4 1132 2086 8 10 46 4
5 1 1 1 54 5 1462 2071 11 42 23 yn
5 1 1 1 54 6 1516 2082 4 26 14 |
5 1 1 1 54 7 1573 2099 13 10 14 od
5 1 1 1 54 8 1898 2074 18 22 90 3
5 1 1 1 54 9 2292 2070 34 27 84 <
4 1 1 1 55 0 159 2097 2166 87 -1
5 1 1 1 55 1 159 2131 34 13 0 °
5 1 1 1 55 2 350 2129 17 55 64 :
5 1 1 1 55 3 937 2104 16 46 9 5
5 1 1 1 55 4 1036 2101 42 56 41 bs
5 1 1 1 55 5 1133 2099 2 64 96 |
5 1 1 1 55 6 1465 2110 60 33 62 \s
5 1 1 1 55 7 1898 2097 17 24 68 $
5 1 1 1 55 8 2292 2113 33 23 73 N
4 1 1 1 56 0 157 2113 1533 73 -1
5 1 1 1 56 1 157 2142 23 44 44 ©o
5 1 1 1 56 2 364 2154 3 3 49 I
5 1 1 1 56 3 931 2147 12 22 3 ~
5 1 1 1 56 4 1494 2143 10 10 36 *
5 1 1 1 56 5 1578 2113 2 64 95 |
5 1 1 1 56 6 1659 2153 31 21 0 oAa@Z
4 1 1 1 57 0 158 2138 2167 102 -1
5 1 1 1 57 1 158 2161 26 50 47 oO
5 1 1 1 57 2 353 2187 14 53 70 i
5 1 1 1 57 3 542 2150 16 71 61 :
5 1 1 1 57 4 937 2168 16 57 43 4
5 1 1 1 57 5 1127 2166 13 11 71 y
5 1 1 1 57 6 1506 2142 34 54 71 4
5 1 1 1 57 7 1573 2179 13 10 35 .
5 1 1 1 57 8 1611 2153 35 51 0 |
5 1 1 1 57 9 1653 2157 68 43 0 B55
5 1 1 1 57 10 1898 2157 18 42 0 z
5 1 1 1 57 11 2291 2138 34 49 26 ©
4 1 1 1 58 0 353 2189 1972 63 -1
5 1 1 1 58 1 353 2241 3 3 0 :
5 1 1 1 58 2 1527 2193 194 59 33 YE)
5 1 1 1 58 3 2292 2189 33 23 36 8
4 1 1 1 59 0 542 2221 1374 46 -1
5 1 1 1 59 1 542 2221 16 46 26 E
5 1 1 1 59 2 1191 2239 11 13 0 4
5 1 1 1 59 3 1208 2231 59 32 0 —_
5 1 1 1 59 4 1271 2231 71 32 10 /—_
5 1 1 1 59 5 1351 2239 12 13 45 3
5 1 1 1 59 6 1371 2231 56 32 20 —__
5 1 1 1 59 7 1504 2239 19 13 28 +
5 1 1 1 59 8 1653 2225 68 37 18 aaa
5 1 1 1 59 9 1898 2238 18 15 75 =
4 1 1 1 60 0 1653 2254 262 35 -1
5 1 1 1 60 1 1653 2255 42 34 19 aod
5 1 1 1 60 2 1898 2254 17 35 42 a
4 1 1 1 61 0 1679 2328 236 20 -1
5 1 1 1 61 1 1679 2338 16 10 48 a
5 1 1 1 61 2 1898 2328 17 11 83 z
4 1 1 1 62 0 378 2328 1538 85 -1
5 1 1 1 62 1 378 2332 186 81 38 Ls
5 1 1 1 62 2 1653 2328 68 74 0 azk
5 1 1 1 62 3 1898 2341 18 38 51 g
4 1 1 1 63 0 523 2383 1172 112 -1
5 1 1 1 63 1 523 2383 57 112 25 ee
5 1 1 1 63 2 1653 2380 263 55 15 Bl:
4 1 1 1 64 0 542 2432 1373 28 -1
5 1 1 1 64 1 542 2454 16 6 3 R
5 1 1 1 64 2 1653 2432 42 22 65 36
5 1 1 1 64 3 1902 2432 8 32 42 eC
4 1 1 1 65 0 378 2446 1538 69 -1
5 1 1 1 65 1 378 2447 206 68 43 [sig
5 1 1 1 65 2 1653 2453 42 38 0 v
5 1 1 1 65 3 1898 2446 18 27 64 3
4 1 1 1 66 0 353 2474 1563 79 -1
5 1 1 1 66 1 353 2508 30 33 71 ‘a
5 1 1 1 66 2 502 2504 24 48 49 3
5 1 1 1 66 3 581 2484 23 90 26 |)
5 1 1 1 66 4 1653 2491 17 23 0 °
5 1 1 1 66 5 1898 2474 18 25 0 :
4 1 1 1 67 0 323 2575 1592 50 -1
5 1 1 1 67 1 323 2594 97 26 9 aAQ|=E
5 1 1 1 67 2 466 2601 60 24 83 wo
5 1 1 1 67 3 633 2586 35 27 92 A
5 1 1 1 67 4 1873 2575 42 45 59 as
4 1 1 1 68 0 323 2599 1567 62 -1
5 1 1 1 68 1 323 2617 203 44 0 HQ|2e2>
5 1 1 1 68 2 633 2624 36 26 49 Q
5 1 1 1 68 3 1873 2599 17 35 33 a
4 1 1 1 69 0 321 2635 1568 55 -1
5 1 1 1 69 1 321 2644 61 46 57 Alo
5 1 1 1 69 2 404 2656 45 22 56 2a
5 1 1 1 69 3 466 2638 123 49 0 5o\@j
5 1 1 1 69 4 645 2648 11 40 51 oO
5 1 1 1 69 5 1873 2635 16 11 93 =
4 1 1 1 70 0 335 2668 241 53 -1
5 1 1 1 70 1 335 2668 30 39 72 WS
5 1 1 1 70 2 404 2672 45 49 34 ze
5 1 1 1 70 3 482 2669 47 34 28 ee)
5 1 1 1 70 4 551 2678 25 27 11 @o
4 1 1 1 71 0 322 2684 346 49 -1
5 1 1 1 71 1 322 2694 60 39 0 IN|
5 1 1 1 71 2 399 2688 26 49 67 8
5 1 1 1 71 3 433 2696 16 25 45 5
5 1 1 1 71 4 466 2692 60 30 92 >
5 1 1 1 71 5 497 2688 46 49 9 G3]
5 1 1 1 71 6 552 2705 32 15 48 sm
5 1 1 1 71 7 633 2684 35 23 41 =
4 1 1 1 72 0 323 2711 346 46 -1
5 1 1 1 72 1 323 2722 126 19 64 [alte
5 1 1 1 72 2 467 2723 59 34 39 me
5 1 1 1 72 3 551 2719 25 23 13 w|
5 1 1 1 72 4 633 2711 36 24 34 |”
4 1 1 1 73 0 311 2732 357 56 -1
5 1 1 1 73 1 311 2732 38 45 0 iz]
5 1 1 1 73 2 404 2738 179 45 0 gaazia
5 1 1 1 73 3 633 2736 35 52 35 x
4 1 1 1 74 0 400 2762 268 62 -1
5 1 1 1 74 1 400 2774 126 50 66 8259
5 1 1 1 74 2 551 2762 25 46 85 a|
5 1 1 1 74 3 633 2791 35 23 26 |e
4 1 1 1 75 0 433 2813 1603 44 -1
5 1 1 1 75 1 433 2822 93 23 52 “On
5 1 1 1 75 2 632 2813 34 44 40 CD
5 1 1 1 75 3 2031 2815 5 5 0 :
4 1 1 1 76 0 353 2826 315 68 -1
5 1 1 1 76 1 353 2826 67 68 57 a|6
5 1 1 1 76 2 467 2841 58 53 32 al
=
| |B = Oo
g s =
I> <
7 pe NZSection 34
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Page 34 of 96
LO FOE Le
= ;
2| 8 ,P.
© rf Sle
5 5o 2
: o a2 3
| |B\8s2
F| | |22 be loly
on) | Bie W Sw Lol
Z| |o | 5 82/8)
Oo hg|2 8 2s (Op
iC <2 215;
Ci] jf *
a Eg
|
n 5 | ©
3 5 i ®
S 2 —_
> : |] 8
gE st
z oo 5 o
f 2
© bs & ik 2
™ PWN B i a.
ORV
oA FF = a.
DAK
x ml] El D
PA cee oe ee eae g
Roy se ae als! O
Ba S18) oe po
ROY EE uREESS Ae ES eS
PO EE eee fz ms
eRe pea a
Chr Fs Oo
EN bk — ae
x= DANA q Es B =n &
BMRA gd 382 8 ig
ze BRA ® £6 38 g a
si 2,22 8 Be afi 6
5 RON 5522 £ Be Ee
3 Sea 5 25 Or ee
8 S288 8 38 a 5%6
i
5
< |
a '
= i
o i
g }
©
9 5
< i
ty i
Lu &
= i
= :
wi i
Lu €
E i
E i
2 !
oO Version Verston Date: 06705720
_
<q
a
lu
=
lu
OoSection 35
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Page 35 of 96
<9
go
a2
8
43 LOSS ds G
49
y= NOTES:
@ Sy | 1. ALLLOWVOLTAGE AND ELECTRICAL INSTALLATION SIREN LATON TO
N SHALL BE IN ACCORDANCE WITH THESE SPECIFICATION, Re RTA co aa GARTOS
Gs TELSTRA CIVIL DESIGN MANUAL, TELSTRA EARTHING TEEECWER WOR
78 MANUAL, ALL REFERENCED TELSTRA STANDARD S2AMP
4= DOCUMENTATION ALONG WITH ASINZS3000, ASINZS3008, BY TELEPOWER
tS ‘ASINZS3015, ASINZS3017, ASINZS1768, AS/ACIF $006, ~----------- fe
9 RELEVANT STATE/TERRITORY SPECIFIC INSTALLATION PROPOSED 2C+E 10mm MAINS.
RULES AND ALL OTHER RELEVANT AUSTRALIAN BY SAN TEAM APPROX. CABLE RUN 40m
c STANDARDS AS APPLICABLE TO PROPOSED WORKS,
2. ALLLOW VOLTAGE AC POWER WORKS SHALL BE
COMPLETED BY LICENSED ELECTRICIAN IN PROVIDE AN EXTERNAL LEAVER TO
ACCORDANCE WITH INSTALLATION RULES AND PTO IA gaaV TaROLE TTT ALLOW DISCONNECTION OF THIS MAIN SETA EELC On INERT TORALLY
RELEVANT SAFETY PRACTICES APPLICABLE TO SITE. \ CONE | SWITCH, WITHOUT OPENING THE
| DISTRIBUTION BOARD ' MOUNTED ENCLOSURE ON THE H-FRAME
3. ALL WORKS SHALL BE LIAISED AND COORDINATED WITH | 1P66 RATED. LOCKABLE. | DISTRIBUTION BOARD ADJACENT TO DISTRIBUTION BOARD
RELEVANT PERSONNEL, SITE REPRESENTATIVES, I O0A1PH |
LANDOWNER, SITE PROVIDER AND/OR POWER | ISOLATOR} [ra----- 22 $= === == === == 5
AUTHORITY AS APPLICABLE. | \ | |
4. ALL WORKS SHALL BE AS PER TELSTRA SPECIFICATIONS | 32a | !
AND APPROVED MOPS INCLUDING LABELLING, | Tom aan SPARE MCB 1—SURGE PROTECTION DEVICE !
5, CONTRACTOR SHALL MAKE THEMSELVES AWARE OF ALL t SPACES {WITH FAIL INDICATION \
SITE CONDITIONS AND SAFETY REQUIREMENTS PRIOR |, RGBO\ ROBO ! I i
TO COMMENCING ANY WORK ON SITE, ! ah As ! | |
6. CONTRACTOR TO VALIDATE ALL APPROVALS AND | power Lt POWER ! 1
OUTAGES REQUIRED TO CONDUCT PROPOSED WORKS. | ourier Loumet { i
c THIS INCLUDES BUT IS NOT LIMITED TO ANY DONOR eo eauemesweemecewee yee ee I | Ic
SITES ANDIOR FAR END SITES WHICH MAY BE IMPACTED | | | '
DUE TO PROPOSED WORKS. POWERPLUG 1 1 ! \
7. ALL CONTRACTORS WORKING ON TELSTRA FACILITIES {AUSTRALIAN STANDARD) I I L.. -b------------------------4-4-+--J
SHALL BE TELSTRA ACCREDITED AS PER TELSTRA | | MFR.AC SATELLITE DISH
PROTOCOLS. | peer neneeeenee | POWER CABLE ANTENNA
K |] & ALLLVCABLES SHALL BE INSTALLED IN CONDUITS. ANY ie POU Eu) (XCVR, HP BUC, y
EXPOSED CONDUITS SHALL BE UV PROTECTED. 1% POWER SUPPLY LNB & FEED)
9. NO SEPARATE METERING IS REQUIRED FOR SAN FR,ACPOWERCABLE = |L--~-------------| | mR DC MFR.DC
INSTALLATION UNLESS SPECIFIED AND DIRECTED BY [ramones ao" | BOWER CABLE POWER GAZE
TELIA FIBER
40. NEUTRAL AND ELECTRICAL SAFETY EARTH FOR SAN TE n SUPE | MFR. DC
INSTALLATION SHALL BE TAKEN FROM EXCHANGE WRT POWER CABLE
EXISTING MEN. CONDUIT W/ | | wey
FIBER ! ! ee
[ |
corr
noo ee
OAN CABINET | i
i \ (CABLE MANAGEMENT HOOD/AC UNIT | \
Lege NOT SHOWN FOR CLARITY) \
FIBER INTERFACE \—MFR, AC DATA CABLE “ELECTRONICS”
nt eo ENCLOSURE
AC POWER CONNECTION
NOT TO SCALE FOR CONSTRUCTION
FOR SITE SPECIFIC NOTES REFER TO SHEET 0,
(onneR [DRAWN] CHRD] AMENDWENT | EXAM | APD | DATE _[K8)
7183929 FOR CONSTRUCTION -SPSNSDASTWOOTEDOWN- SATELLITE 18.06.21 €el stra
“OMPLIANCE BOX SATELLITE ACCESS NODE SITE 183929
hd POMONA EXCHANGE
COMPLETED AS PER DESIGN [_] AC POWER CONNECTION F
re IN RED O 25 RAILWAY PARADE, POMONA, QLD 4568
seus oe [ CratecapeeintnreN TES Migrant sd QC 100259
PBN ZS Gad fer QCT00259.dwy A
The copyright and ownership of hiv drewing iv eesigned fo Tetrire and must not be copied or served skeewhare without writen permiesion from Teter.
Page 35 of 96Section 36
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Page 36 of 96
<9
2o
a2
s
a7 a . as GENERAL NOTES:
y= REFER SITE-SPECIFIC DRAWINGS FOR SET-OUT DIMENSIONS OMPLIAN BO GENERAL
oO On ‘ ‘ COMPLETED AS PER DESIGN bes G1. THIS DRAWING TO BE READ IN CONJUNCTION WITH SITE-SPECIFIC DRAWINGS.
N ALTERATIONS IN RED Oo G2, FOR GENERAL CONSTRUCTION & FABRICATION NOTES REFER TO TELSTRA STANDARD
Yd © = ine ibe DRAWING 017866P05.
aS ‘ < LO [[\ PEDESTAL ‘A. \ aouicice ae G3, FOOTINGS TO BE FOUNDED ON UNDISTURBED, NATURALLY CONSOLIDATED SOIL WITH
dz ft a dates REFER DETAIL MINIMUM ALLOWABLE VERTICAL BEARING CAPACITY 100kPa (U.N.O). A SUITABLY
FS at Ce Belen EXPERIENCED PERSON SHALL CONFIRM THE BEARING CAPACITY ON-SITE PRIOR TO
o 4 Ber ates
8 oe — a a INSTALLING THE CONCRETE/EQUIPMENT,
chew ch ey G4, BASE OF EXCAVATION SHALL BE CLEAN, FLAT & FREE OF SOFT/ORGANIC MATERIAL,
q a —— be SESS G5, SUBGRADE OF CRUSHED AGGREGATE OR ROAD BASE SHALL BE USED AS NECESSARY
%. BH \ [- \/ XN TO ACHIEVE THE BEARING CAPACITY REQUIREMENT.
G6, CONCRETE AT TOP OF POLE MUST BE LEVEL AND NOT PROTRUDING FROM TOP SO AS
MOON FOOT | NOT TO INTERFERE WITH MOUNTING OF DISH.
| BLATFORM, REFER PEDESTAL'B { G7, SAFE WORK PRACTICES SHALL BE IMPLEMENTED IN ACCORDANCE WITH LOCAL
SHEET T2-4 REFER DETAIL MOUNTING POLE REGULATORY REQUIREMENTS & AS2159-2009,
| 9168,3x7.1 CHS
4 1 _ _ — fy (GR950).REFERNOTEGS CONCRETE
} are C1. CONCRETE WORKS TO BE COMPETED IN ACCORDANCE WITH AS3600-2018.
/ ra C2. CONCRETE STRENGTH TO BE MIN fc = 32MPa AT 28 DAYS.
ae 3. COVER TO REINFORCEMENT TO BE MIN. 75mm {TYP ALL SIDES).
TYPICAL COMPOUND - PLAN VIEW By CA. CAST-IN PROPRIETARY ITEMS TO BE INSTALLED TO MANUFACTURERS
SCALE 1:50 th SPECIFICATIONS,
1000 MOUNTING POLE CAST INTO FOOTING g fe STEEL
ay $1. STEELWORK TO BE FABRICATED IN ACCORDANCE WITH AS4100-2020.
c 4 one OUR UA ROI, ey ge 82. ALL STEELWORK TO BE HOT DIP GALVANISED TO AS4680-2006 U.N.O. c
STO MAS | Ey 3 $3. ALL HOLLOW SECTIONS TO BE GRADE 350 TO AS1163-2016 U.N.O.
( MASS CONCRETE FOOTING Be
LA rh a bk 1% FALL TOWARDS EDGES TYP.
ea, g Eh CRUSHED ROCK COMPOUND FINISH
VL Bh
Kt & Pe EL. 0.0m y
CS Ri 2th eee CAGE CAST INTO
RX es Ee Rx, MASS CONCRETE FOOTING
PEDESTAL 'A' - PLAN VIEW 4 roomne
SCALE 1:25 Pe: “s4 BACKFILL MOUNTING SL72 MESH (ALL SIDES)
610 NOM, 8 2 ie 7a
(@OOMIN, 615 MAX) = pv g ; CONCRETE PEDESTAL
HOLD-DOWN BOLT CAGE CAST INTO . Bt | >a: Ean
am FOOTING (DIMENSIONS TO BE hen Pe Ni2x450LONG =| pee | HE FINISHED GRADE
gor CONFIRMED) ee + INSERTED THROUGH gals | tee
go | dhe comer (at | ie
“ | x SL72 MESH AE at 8 MAST ROTATION eS \ REFER NOTES G3,
(8 ff \ _« SR eee te
/ \ (ALL SIDES) SR kta, \
CJ tr a SECTION (RY rerernorescs, SECTION /B
\ } CONCRETE PEDESTAL G4&G65
\ ji SCALE 1:25 Ey, SCALE 1:25 Ye)
x i Z a
“6 ge FOR CONSTRUCTION
ORIENTATE HOLD-DOWN BOLTS THIS SHEET TO BE READ IN CONJUNCTION WITH SHEET T2-1.
~imiaiinnen (cron [Own] GOT ————ENDMENT == EX PO] OWE [RS
r 7183929 FOR CONSTRUCTION -SPSNSDASTWOOTEDOWN- SATELLITE 18.06.21 €el stra
f———~ ~~~ === a=~4~~ ~~ ~~~ aaa aa naan SATELLITE ACCESS NODE SITE 183929
= 3 UNISTRUT (REFER SITE LAYOUT) POMONA EXCHANGE
z
ae CONCRETE FOUNDATION DETAILS F
25 RAILWAY PARADE, POMONA, QLD 4568
PEDESTAL 'B' - PLAN VIEW
sca *0 [Cian caininmaronm Tae Meaeneme i QC 100259
ss020 EE wee. aaSeaeeem. D0: DI Cal ie COTOOEE Ay A
The copyright and ownership of hiv drewing iv eesigned fo Tetrire and must not be copied or served skeewhare without writen permiesion from Teter.
Page 36 of 96Section 37
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Page 37 of 96
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
20
go
8.2
s
io
1 2
ot Sy
N BACK PLATE TO SUPPORT
Yd © METER PANEL, DISTRIBUTION
a1 8 BOARD AND FIBRE BOX,
42 SHALL BE MINIMUM
HD ff 4 4500mm WIDE x 800mm HEIGHT
Sj A=
OF he
a All
APPROX DIMENSIONS wo)
605mm WIDTH x 680mm my e P
HEIGHT x 280mm DEEP ! x 4 kee 1 [|
THIS WILL VARY IN EACH eo e 7
STATE/TERRITORY (1) Il fa |
(2) <f c] | H-FRAME INSTALLED IN ioe
Peers Bee <L MANUFACTURER SPECIFICATIONS |
340mm WIDTH x 260mm SS p oo
ACCI CE WITH
(3) > sal Pye
SS : + +
[1 | 4 ken LB MIN 100 THICK COMPOUND FINISH a
— | >
Che Z|
S Ne Nek RRRRRRRRR
— Y> - ARRARARARRRRRANNNRA .
im = III HOODS
[3 | Se PREPARE GROUND BELOW PLATFORM
FEET IN ACCORDANCE WITH SHEET T2
i oe NOTES G3, G4 & C8,
NN St GROUND PREPARATION SHALL BE
: COMPLETED BELOW PLATFORM FEET TO
ACHIEVE 150kPa ALLOWABLE VERTICAL
BEARING CAPACITY
EQUIPMENT PLATFORM - H-FRAME DETAIL H-FRAME FOUNDATION
NTS SCALE: 1:20
CLIENT EQUIPMENT KEYED NOTES:
([1_] FIBRE INTERFACE PANEL
[2] OAN CABINET W/EXTERNAL AC UNIT
[2] eavewenr crowvo an FOR CONSTRUCTION
THIS SHEET TO BE READ IN CONJUNCTION WITH SHEET T2.
ELECTRICAL SITE EQUIPMENT KEYED NOTES: (ono [Draw] cio enwenr xa | a0 | DATE 88 €elstra
cients 183929 FOR CONSTRUCTION - SPSS2THOUTEDOWN - SATELLITE 18.06.21
& SIZE OF THE ENCLOSURE SHALL SUIT THE POWER UTILITY STAN v SATELLITE ACCESS NODE SITE 183929
REQUIREMENTS IN THE RELEVANT STATES AND TERRITORIES O I E BO POMONA EXCHANGE
COMPLETED AS PERDESIGN [_]
(3) 1004 DISTRIBUTION BOARD WITH EXTERNAL aomatlacieiiaeee oq EQUIPMENT PLATFORM-H-FRAMEDETAL = |r
SURGE PROTECTION DEVICE NAME (PRINT) 25 RAILWAY PARADE, POMONA, QLD 4568
Seu ee [ CratecapeeintnreN TERS Migrant «dS QC 100259
PBN ZS Gad file: QC100259.deg A
The copyright and ownership of hiv drewing iv eesigned fo Tetrire and must not be copied or served skeewhare without writen permiesion from Teter.
Page 37 of 96Section 38
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Page 38 of 96
m
za
m
>
Z ~
4 OZ/SO/90 :212O UOISJaA ‘| :UOISIa/A, QO
: ° 9PL0Z61Z,,0 18S jupuINoog Oo
i Ss
Z ESIDKO> 7 —
i] am 65 GATE POST 9 oN, Watetes OOH |
= = AG KK oh
i}| 82 = je RO [rcecesecess ExSKOH mi
| 80 KO WN SKE ROOT m
1 Sta zee ae kKOOY one IISISSEEE DSR SSOCOCOH
i fi 8s Bx x<> com PR: Fa POOOOO S555 OH
i Bas 28 hx Ea eee ek net —=— $4 =
g go aun 2zKxX oe ——— COOK
i Q 7s Balk ae Oe i mn
3 eerie teT | SMD iH
=z #3 g wre ae ~ 2 |
i] mer #3 $3 am POW XK XoXo 4
8 3 SH SBF RSS SRR =
Oo = Miglz\ OE NSS SERS =
i SE £_N RE BSS SOS
| m a5 N N Wi Weeetets SKS oO
a m= QW ga IRS SNH
ll & FD nt e Siar gas Mae 5
a gz cy Hh
Wy ° BS @ $222 | ges ae @
i > Eom 38 38 | Sze g m
i FE if 8 gh so] cee 5 z
i nm (2 § £8 o2| Bes 5 o
mf 6 Pees) gz * >
So ff ue R
3 Fe
a5 Ee), BED 9
nag = CF RQ | BSH 222 322 832
= HEIRS? a3 a Kes Beg
| wm iE PK ORS2 SF ye°2 ROK S 328
SBu NRX. SE218 2<eKHe 2
259 . Ai BkSoees eek EXSSXOHR =
a PI YO BRKSRN'G S SOSH 5
a5 — SRRRREG FE PPQARRD* FS SOSH
@ mH PET Pes a | RRO fo KOVAL
y aoe oo = eS — —— —— |
= Boy ce @ nan oO esas ee FF
eS Sides vai 4
=x x TERY
20 6 O09 8 wy
oO <9= 2 gs eA
= Qcy a 1000
9 23> 0 oo
g aoe é D
od @} S$ z aS
i ¢® 3 3 #8
oD 2 z as
SoS oO z e 52
L =< = S m cz
a : z Fo z mg
a i 4 2X2 2 z 4 ee
1 = D
© 5 5 © oS z BRS | a
8 HAR i aq
& ; é SK oH BRE
0 3 QZ RRS oH gm =
° i Seen eh 8g 5
Gi i Ss
= A ~ oe og RRA A PRESS SH Sy <
8 : g Seragas a an OS Seg nN
BRED GE ‘
; ma a at Se ass Th So
f)| 223bR2s g a — 8
oss @ ae ol aacsaock™ Daaaaaae a NO
Le SotoR sorte ORK IKE
ee eee be ° POY RiSeKoacuncomerrions
Us Boz5 $m CR ROSS oS oe KSA PCS
& BB2ee rd AR, I eSeSceee RR ano
3 S o RG ISOSPIN
ad op&see oO gs Nl eetetetatetetenn ti Se etetatetatates
& egses m ARG POOR OCIRRE RRR RR
a EBABO 2 WE [ROO BRK KR
= a $2 oH 2 Yi tetetetetetetetenitere seteten <2
= 22a LG iii: RRR KK RRR
2 R 25556 = * Or EERE
R = Rime = cH RRRRAIS | PSC RS SSSR RIO
= Smog 5550505 S555 ORR 50)
[el 2 25u8¢ me TA 2a RRR RAPA
53 S = = 8 3 B22 AP aaae OSE ————————
= 52-25 Le pots sat ee. SSF I
3 Sete cgi ETD Ho] er
Re m & Showa? at eee, ; Weraee Fe
mm g GRATE AS55062 QSooesesoHd
doles 5] | Fe agece ~ FRR RES Rg
zegm z agsgn RGF RSS S82 SOSH 3
AQ| 28 o> OZ 38625 8 yee SOK «g
oles SS |O 2 2825 4 ASX Sex
7SlsZZQlo| SB 228a5 FIRS SSH
IS|BR> Bl el ll 2 a228z k\ xh
: < MOQ t= M
BIO] 3s 3 =| =| 8 £283= 8 eBH L
eessia| Eye 2ggng ¢ 5 aa
a2oa| | lod esse § 833 a3
za e ma a 2 gage nt ee ae
52) 22 m aS 5 208 S$ #3 5 c
$5 = =|” 3 #88 § fag 3
bs 2 oO a $ zs = 2 8
8 =z 5 2 =z
. bs x 8
a Or 2Section 39
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Page 39 of 96
DE .
py PARA : 25
(LW ¢ al | = Sy Ealg
RA _ g Alcs Salee Blees ssi
Re Ba) «ess «=A BIE 5
5 sty / BI. ale ele Q Flee R\E EE 2/2 1
— \ 3 GH: Bisss o@8es eeeg uBlES
g - 18/5
ae z & ds lee | fe? | fs gzlew
t 3s = Sls SS gah Bea om
ce 3 z [AY Bs) BE BFS ges © on
8 o Sag =< | / i ° al 7: BERS 3
A 2 = nas a ‘i s El iz 5 ois 2 .
= 2 5 «Zw = go Zig} 2) Zsike |
Ge Z2 Ofr wih = =«Sla) Sigil. «= | BEG S| ,
' ge g <a0 ats el] oe ELFEE Ege; Mista
a | wet S as Ela] 2S elyigia S/S lis Eig £3]
as ae O00 ‘e 4 a? Sli] S algsle Bese Seees %
' 25 : i oo Ge ToT. Soke ale bs |
a3 alls get 1 Si eke Beegt Be lhe ol =e
i Seca Xt gg i Ose Sle Dsiecs 2 Gslge Sis i
a2 Z wey 4 “ ap i) Sigel? MSIE Piz 82
Bevis m Ay is O 8s Qe] Tease Toes Dose
SSX. Sal 3 Za Ble] Dsltee WE elie 25 83
pe Lae - y es Zt All walee GREE Sige
! Pi Lot + ne - aS 5ag Ww Offs a8 ier = Bi2 53 Zz
! 7 -~ A ‘ie Nn ‘Yo 2B ay W le © [acid Salas Be heaek 9°
i ‘ on Ak rE es he ee a Coe] falgee BS -s22 Sizlf 2s =
\ io PQ OSag ' 1 ag ats Fels) SLeat HL Fase <x
5 1 1 1 30 2 813 1001 22 14 73 -
5 1 1 1 30 3 1129 1000 3 1 20 ~
5 1 1 1 30 4 2016 960 39 8 20 foie)
4 1 1 1 31 0 783 960 1421 67 -1
5 1 1 1 31 1 783 994 141 33 12 eR
5 1 1 1 31 2 977 1006 83 15 12 GN
5 1 1 1 31 3 1148 1009 3 3 50 SO
5 1 1 1 31 4 1468 991 16 14 30 se
5 1 1 1 31 5 2161 960 43 16 57 <x
4 1 1 1 32 0 696 975 1508 83 -1
5 1 1 1 32 1 696 1033 52 25 14 -o
5 1 1 1 32 2 811 1028 28 18 26 ee
5 1 1 1 32 3 911 1023 62 23 21 sees
5 1 1 1 32 4 1003 1024 3 10 16 ay:
5 1 1 1 32 5 1066 1019 11 8 36 =
5 1 1 1 32 6 1156 1015 42 18 34 Sa
5 1 1 1 32 7 1415 999 9 24 2 t
5 1 1 1 32 8 1467 1001 44 18 83 wf
5 1 1 1 32 9 2161 975 43 29 9 £G
4 1 1 1 33 0 641 997 1563 90 -1
5 1 1 1 33 1 641 1055 48 32 65 r*
5 1 1 1 33 2 830 1053 57 22 26 Ser
5 1 1 1 33 3 985 1048 14 22 42 y
5 1 1 1 33 4 1108 1038 92 21 6 oe
5 1 1 1 33 5 1413 1031 8 21 64 t
5 1 1 1 33 6 1476 1026 1 21 91 |
5 1 1 1 33 7 2041 1018 11 11 33 2
5 1 1 1 33 8 2152 997 52 36 42 Oe
4 1 1 1 34 0 638 1028 1566 89 -1
5 1 1 1 34 1 638 1096 10 21 4 !
5 1 1 1 34 2 838 1079 18 15 0 -
5 1 1 1 34 3 961 1072 24 22 13 “
5 1 1 1 34 4 1198 1067 5 16 78 \
5 1 1 1 34 5 1409 1059 10 24 55 i
5 1 1 1 34 6 1895 1042 8 24 21 ae:
5 1 1 1 34 7 2041 1035 11 26 51 z
5 1 1 1 34 8 2145 1028 59 29 0 gg
4 1 1 1 35 0 887 1047 1341 62 -1
5 1 1 1 35 1 887 1106 12 3 41 ol
5 1 1 1 35 2 917 1106 13 3 66 gh
5 1 1 1 35 3 1202 1088 2 6 0 '
5 1 1 1 35 4 1350 1088 22 13 0 e
5 1 1 1 35 5 1822 1069 5 10 34 EP:
5 1 1 1 35 6 1861 1069 7 11 26 y
5 1 1 1 35 7 1896 1058 48 25 77 By
5 1 1 1 35 8 2041 1062 11 14 88 a
5 1 1 1 35 9 2145 1047 83 15 0 gFO.
4 1 1 1 36 0 636 1078 1569 74 -1
5 1 1 1 36 1 636 1126 27 26 0 Bt
5 1 1 1 36 2 1198 1106 6 24 57 }
5 1 1 1 36 3 1406 1090 58 28 31 Be
5 1 1 1 36 4 1698 1088 88 22 49 Pah
5 1 1 1 36 5 1822 1084 7 23 9 ob
5 1 1 1 36 6 1861 1080 83 27 7 eae
5 1 1 1 36 7 2041 1078 11 24 38 3
5 1 1 1 36 8 2189 1079 16 17 36 3
4 1 1 1 37 0 518 1092 1698 98 -1
5 1 1 1 37 1 518 1167 18 23 69 >
5 1 1 1 37 2 633 1158 9 22 35 I
5 1 1 1 37 3 769 1155 18 23 87 2
5 1 1 1 37 4 1403 1121 33 25 38 t
5 1 1 1 37 5 1698 1114 9 21 9 3
5 1 1 1 37 6 1750 1107 37 25 44 ogee
5 1 1 1 37 7 1820 1109 9 16 47 of
5 1 1 1 37 8 1861 1110 20 21 47 ge
5 1 1 1 37 9 1896 1103 48 24 20 eed
5 1 1 1 37 10 2040 1092 10 39 42 Zz
5 1 1 1 37 11 2161 1096 55 22 0 iHa.
4 1 1 1 38 0 1183 1116 1031 42 -1
5 1 1 1 38 1 1183 1154 4 4 52 f
5 1 1 1 38 2 1405 1147 1 6 0 '
5 1 1 1 38 3 1524 1150 2 2 0 :
5 1 1 1 38 4 1701 1136 19 11 70 ts
5 1 1 1 38 5 1753 1133 34 14 17 Fig
5 1 1 1 38 6 1822 1129 7 10 90 §
5 1 1 1 38 7 1859 1129 22 14 67 28
5 1 1 1 38 8 1895 1124 63 18 2 5282
5 1 1 1 38 9 2041 1129 11 8 53 3
5 1 1 1 38 10 2164 1116 50 16 0 yigeaa
4 1 1 1 39 0 518 1122 1697 89 -1
5 1 1 1 39 1 518 1191 13 16 90 2
5 1 1 1 39 2 630 1189 9 22 1 Lu
5 1 1 1 39 3 742 1181 40 18 50 gs
5 1 1 1 39 4 1159 1161 20 20 26 we
5 1 1 1 39 5 1386 1154 24 22 32 “|
5 1 1 1 39 6 1701 1147 19 19 58 FE
5 1 1 1 39 7 1750 1148 37 21 34 Gee
5 1 1 1 39 8 1820 1140 22 25 58 og.
5 1 1 1 39 9 1861 1143 22 20 83 ER
5 1 1 1 39 10 1895 1136 62 26 0 Bease
5 1 1 1 39 11 2041 1140 11 13 49 =
5 1 1 1 39 12 2163 1122 52 39 0 iaiids
4 1 1 1 40 0 518 1150 1698 81 -1
5 1 1 1 40 1 518 1208 13 23 56 g
5 1 1 1 40 2 738 1199 44 26 26 g5
5 1 1 1 40 3 1126 1186 21 9 28 ac
5 1 1 1 40 4 1401 1178 11 18 28 go
5 1 1 1 40 5 1698 1166 22 14 41 si
5 1 1 1 40 6 1753 1165 33 20 21 FS
5 1 1 1 40 7 1822 1159 59 25 36 Phe,
5 1 1 1 40 8 1895 1156 63 20 0 see3?
5 1 1 1 40 9 2041 1152 11 18 63 3
5 1 1 1 40 10 2161 1150 55 20 31 Hue
4 1 1 1 41 0 514 1163 1702 80 -1
5 1 1 1 41 1 514 1233 17 10 83 =
5 1 1 1 41 2 627 1220 9 22 40 I
5 1 1 1 41 3 738 1220 44 23 64 go
5 1 1 1 41 4 1083 1204 14 32 44 ii
5 1 1 1 41 5 1398 1185 27 23 0 b
5 1 1 1 41 6 1701 1184 19 19 16 fe
5 1 1 1 41 7 1753 1182 36 22 34 ERE
5 1 1 1 41 8 1820 1184 22 15 58 GF
5 1 1 1 41 9 1859 1181 22 18 51 23
5 1 1 1 41 10 1895 1176 63 26 36 gente
5 1 1 1 41 11 2041 1175 11 20 78 a
5 1 1 1 41 12 2169 1163 47 32 0 geese
4 1 1 1 42 0 514 1187 1702 86 -1
5 1 1 1 42 1 514 1245 17 11 53 2
5 1 1 1 42 2 623 1251 10 22 68 i
5 1 1 1 42 3 738 1242 44 14 12 F@
5 1 1 1 42 4 1395 1214 10 27 52 t
5 1 1 1 42 5 1512 1221 11 4 34 ne
5 1 1 1 42 6 1700 1211 20 14 67 gi
5 1 1 1 42 7 1750 1203 36 20 34 BS
5 1 1 1 42 8 1820 1200 22 21 25 fe
5 1 1 1 42 9 1859 1196 22 22 0 £F
5 1 1 1 42 10 1895 1196 63 22 53 22353
5 1 1 1 42 11 2041 1197 11 14 47 =
5 1 1 1 42 12 2164 1187 52 22 23 copies
4 1 1 1 43 0 518 1203 1699 90 -1
5 1 1 1 43 1 518 1264 40 29 0 2g
5 1 1 1 43 2 742 1256 45 22 76 oP
5 1 1 1 43 3 1064 1263 2 3 79 i
5 1 1 1 43 4 1701 1226 19 18 73 EL
5 1 1 1 43 5 1753 1223 33 19 68 ERE
5 1 1 1 43 6 1822 1219 20 22 44 o£;
5 1 1 1 43 7 1859 1219 22 21 0 2
5 1 1 1 43 8 1896 1211 62 28 0 f383¢
5 1 1 1 43 9 2041 1208 11 29 69 g
5 1 1 1 43 10 2162 1203 55 25 22 Hugh
4 1 1 1 44 0 156 1230 2050 99 -1
5 1 1 1 44 1 156 1296 33 23 91 N
5 1 1 1 44 2 514 1290 44 39 63 ae
5 1 1 1 44 3 621 1282 10 28 27 of
5 1 1 1 44 4 738 1278 75 33 37 gi.
5 1 1 1 44 5 1392 1248 9 24 33 J
5 1 1 1 44 6 1701 1245 101 28 5 oe
5 1 1 1 44 7 1861 1241 20 26 26 Gp
5 1 1 1 44 8 1895 1238 63 29 0 ebete
5 1 1 1 44 9 2041 1240 11 22 39 3
5 1 1 1 44 10 2163 1230 43 28 34 Lin
4 1 1 1 45 0 156 1256 2069 88 -1
5 1 1 1 45 1 156 1321 33 23 92 N
5 1 1 1 45 2 514 1316 17 26 26 3
5 1 1 1 45 3 618 1313 10 22 45 1
5 1 1 1 45 4 738 1305 44 22 33 28
5 1 1 1 45 5 1063 1301 5 15 10 ‘
5 1 1 1 45 6 1389 1278 9 22 49 t
5 1 1 1 45 7 1480 1296 4 1 0 t
5 1 1 1 45 8 1701 1274 19 19 31 ia
5 1 1 1 45 9 1750 1270 49 23 0 ghz
5 1 1 1 45 10 1820 1272 22 16 30 fF
5 1 1 1 45 11 1861 1268 20 18 43 be
5 1 1 1 45 12 1895 1266 63 22 13 Gnade
5 1 1 1 45 13 2041 1263 11 17 70 =
5 1 1 1 45 14 2163 1256 62 20 0 HIE
4 1 1 1 46 0 160 1276 2065 100 -1
5 1 1 1 46 1 160 1341 19 35 52 oO
5 1 1 1 46 2 546 1330 12 12 26 %
5 1 1 1 46 3 615 1345 10 22 79 I
5 1 1 1 46 4 738 1329 44 13 54 ww
5 1 1 1 46 5 1386 1308 27 24 63 ie
5 1 1 1 46 6 1770 1289 16 4 48 BER
5 1 1 1 46 7 1820 1287 22 7 50 fe
5 1 1 1 46 8 1859 1287 22 6 64 GH
5 1 1 1 46 9 1895 1283 63 12 0 ERBR
5 1 1 1 46 10 2041 1282 11 18 74 g
5 1 1 1 46 11 2177 1276 48 22 8 eee:
4 1 1 1 47 0 156 1301 2167 94 -1
5 1 1 1 47 1 156 1372 33 23 87 N
5 1 1 1 47 2 1082 1348 9 10 89 \
5 1 1 1 47 3 1383 1326 81 37 24 rn
5 1 1 1 47 4 1872 1322 62 13 35 SEBS
5 1 1 1 47 5 2041 1304 11 24 48 =
5 1 1 1 47 6 2161 1296 64 28 34 2
4 1 1 1 48 0 155 1326 2168 112 -1
5 1 1 1 48 1 155 1410 34 28 94 >
5 1 1 1 48 2 539 1375 82 22 19 SF
5 1 1 1 48 3 777 1397 8 8 0 \
5 1 1 1 48 4 1100 1371 23 22 53 Ss
5 1 1 1 48 5 1380 1367 10 27 30 i
5 1 1 1 48 6 1947 1344 3 3 4 y
5 1 1 1 48 7 2041 1333 11 29 0 z
5 1 1 1 48 8 2145 1327 80 33 46 gu
5 1 1 1 48 9 2256 1322 23 46 55 =
5 1 1 1 48 10 2289 1326 34 23 61 OD
4 1 1 1 49 0 570 1356 1655 72 -1
5 1 1 1 49 1 570 1406 48 22 30 Sd
5 1 1 1 49 2 823 1416 52 5 0 =>
5 1 1 1 49 3 1127 1395 23 15 28 SS
5 1 1 1 49 4 1416 1396 1 3 0 :
5 1 1 1 49 5 1442 1383 32 5 39 pee
5 1 1 1 49 6 1802 1368 126 16 22 se
5 1 1 1 49 7 1988 1371 9 9 17 y
5 1 1 1 49 8 2041 1364 11 10 84 8
5 1 1 1 49 9 2145 1367 7 5 18 3
5 1 1 1 49 10 2163 1356 62 19 0 gekgaze
4 1 1 1 50 0 155 1364 2167 106 -1
5 1 1 1 50 1 155 1439 34 31 91 <
5 1 1 1 50 2 807 1425 16 8 27 ‘
5 1 1 1 50 3 884 1421 115 15 0 wersschs
5 1 1 1 50 4 1174 1421 2 2 23 5
5 1 1 1 50 5 1377 1395 36 30 71 i
5 1 1 1 50 6 1802 1382 17 35 71 ts:
5 1 1 1 50 7 1882 1386 2 11 49 |
5 1 1 1 50 8 1980 1383 16 5 24 rw
5 1 1 1 50 9 2041 1375 11 16 18 OB
5 1 1 1 50 10 2138 1365 15 35 22 gj
5 1 1 1 50 11 2161 1372 64 19 0 aie288:
5 1 1 1 50 12 2288 1364 34 13 64 =
4 1 1 1 51 0 606 1376 1707 84 -1
5 1 1 1 51 1 606 1437 28 23 22 1)
5 1 1 1 51 2 820 1439 2 5 58 4
5 1 1 1 51 3 1008 1432 16 9 60 =)
5 1 1 1 51 4 1208 1429 47 14 0 eee
5 1 1 1 51 5 1386 1436 4 1 0 z
5 1 1 1 51 6 1492 1427 3 2 0 s
5 1 1 1 51 7 1798 1398 36 23 84 {=
5 1 1 1 51 8 1980 1401 6 9 0 )
5 1 1 1 51 9 2041 1395 11 18 46 8
5 1 1 1 51 10 2145 1389 8 17 36 B
5 1 1 1 51 11 2161 1383 64 31 0 bateeas
5 1 1 1 51 12 2304 1376 9 34 2 °o
4 1 1 1 52 0 155 1414 2053 93 -1
5 1 1 1 52 1 155 1474 34 33 43 S
5 1 1 1 52 2 604 1468 41 23 6 rh
5 1 1 1 52 3 797 1438 105 50 17 rien,
5 1 1 1 52 4 1053 1454 27 20 10 aR
5 1 1 1 52 5 1262 1427 148 35 17 rede
5 1 1 1 52 6 1802 1422 82 20 18 Loe
5 1 1 1 52 7 2041 1414 11 26 83 3
5 1 1 1 52 8 2184 1418 24 16 43 a5
4 1 1 1 53 0 156 1472 2167 99 -1
5 1 1 1 53 1 156 1557 33 14 47 =
5 1 1 1 53 2 598 1530 28 30 32 i.
5 1 1 1 53 3 708 1547 18 18 13 .
5 1 1 1 53 4 789 1534 25 20 18 i
5 1 1 1 53 5 845 1519 26 15 31 wo
5 1 1 1 53 6 893 1515 31 37 39 teh
5 1 1 1 53 7 976 1524 10 17 78 {7
5 1 1 1 53 8 1006 1513 30 28 25 ay
5 1 1 1 53 9 1069 1513 16 15 56 oy
5 1 1 1 53 10 1112 1537 18 3 0 _
5 1 1 1 53 11 1244 1511 13 24 46 i
5 1 1 1 53 12 1369 1496 9 22 64 t
5 1 1 1 53 13 1454 1499 3 1 21 -
5 1 1 1 53 14 1909 1494 3 6 41 A
5 1 1 1 53 15 2041 1478 33 29 15 23
5 1 1 1 53 16 2184 1472 43 32 32 208
5 1 1 1 53 17 2297 1485 26 23 63 ©
4 1 1 1 54 0 595 1505 1737 79 -1
5 1 1 1 54 1 595 1562 10 22 36 1
5 1 1 1 54 2 809 1568 4 7 37 \
5 1 1 1 54 3 935 1547 18 18 57 ON
5 1 1 1 54 4 973 1561 49 14 30 ft)
5 1 1 1 54 5 1067 1566 3 1 29 ee
5 1 1 1 54 6 1229 1550 14 9 31 at
5 1 1 1 54 7 1366 1526 9 24 35 I
5 1 1 1 54 8 1877 1533 29 10 0 *
5 1 1 1 54 9 2037 1515 46 21 31 aes
5 1 1 1 54 10 2184 1505 43 23 60 ei
5 1 1 1 54 11 2297 1512 35 23 34 CH
4 1 1 1 55 0 592 1536 1731 80 -1
5 1 1 1 55 1 592 1593 10 23 32 '
5 1 1 1 55 2 806 1581 3 20 13 Pe
5 1 1 1 55 3 1001 1575 73 20 24 Big
5 1 1 1 55 4 1107 1575 20 10 20 a
5 1 1 1 55 5 1174 1580 4 2 26 it
5 1 1 1 55 6 1221 1573 31 5 4 Al
5 1 1 1 55 7 1362 1555 31 28 4 ie
5 1 1 1 55 8 1885 1558 11 4 7 :
5 1 1 1 55 9 2040 1536 46 22 53 ep
5 1 1 1 55 10 2297 1538 26 23 0 G
4 1 1 1 56 0 589 1557 1722 88 -1
5 1 1 1 56 1 589 1623 9 22 39 !
5 1 1 1 56 2 804 1612 37 22 43 BA
5 1 1 1 56 3 998 1607 66 21 44 Her
5 1 1 1 56 4 1095 1620 19 3 17 uy
5 1 1 1 56 5 1159 1598 19 25 18 fa
5 1 1 1 56 6 1359 1588 40 28 37 Le
5 1 1 1 56 7 2059 1565 4 1 0 /
5 1 1 1 56 8 2184 1579 7 6 69 4
5 1 1 1 56 9 2287 1557 24 45 50 oa
4 1 1 1 57 0 586 1596 1622 81 -1
5 1 1 1 57 1 586 1654 29 23 0 r
5 1 1 1 57 2 778 1657 24 12 0 nt
5 1 1 1 57 3 995 1648 19 13 41 i
5 1 1 1 57 4 1124 1645 43 10 0 ‘
5 1 1 1 57 5 1349 1620 17 23 24 a
5 1 1 1 57 6 2184 1596 24 20 26 23
4 1 1 1 58 0 800 1618 1408 63 -1
5 1 1 1 58 1 800 1676 1 5 42 1
5 1 1 1 58 2 871 1677 1 4 73 i
5 1 1 1 58 3 894 1673 1 4 50 §
5 1 1 1 58 4 965 1662 34 13 51 it
5 1 1 1 58 5 1122 1667 3 4 89 1
5 1 1 1 58 6 1155 1656 12 9 64 =
5 1 1 1 58 7 1209 1653 36 15 49 rai
5 1 1 1 58 8 1416 1658 26 3 39 rae
5 1 1 1 58 9 1675 1645 7 8 47 c
5 1 1 1 58 10 2184 1618 24 16 68 a?
4 1 1 1 59 0 580 1660 1647 79 -1
5 1 1 1 59 1 580 1716 10 23 0 §
5 1 1 1 59 2 647 1713 68 26 67 336
5 1 1 1 59 3 821 1706 10 39 16 _—
5 1 1 1 59 4 985 1708 25 13 30 2
5 1 1 1 59 5 1077 1708 43 16 46 iis
5 1 1 1 59 6 1151 1704 10 6 36 a
5 1 1 1 59 7 1228 1701 13 19 0 ods
5 1 1 1 59 8 1314 1708 3 1 0 .
5 1 1 1 59 9 1351 1682 9 22 0 E
5 1 1 1 59 10 1480 1708 4 3 0 ’
5 1 1 1 59 11 1635 1682 61 23 69 gids
5 1 1 1 59 12 1720 1679 41 23 0 ig2,
5 1 1 1 59 13 1791 1677 64 23 29 $2382
5 1 1 1 59 14 1874 1672 36 26 5 S32
5 1 1 1 59 15 1948 1673 19 18 13 ce
5 1 1 1 59 16 2184 1660 43 26 25 a
4 1 1 1 60 0 577 1685 1650 84 -1
5 1 1 1 60 1 577 1747 30 22 47 fi
5 1 1 1 60 2 643 1736 153 29 0 peercts
5 1 1 1 60 3 996 1726 123 16 29 oe
5 1 1 1 60 4 1347 1711 52 24 60 foe
5 1 1 1 60 5 1633 1706 22 24 41 by
5 1 1 1 60 6 1674 1706 22 21 18 2
5 1 1 1 60 7 1717 1700 57 27 37 2288
5 1 1 1 60 8 1793 1697 62 28 0 g2078
5 1 1 1 60 9 1877 1694 33 28 14 Get
5 1 1 1 60 10 1948 1694 19 25 18 GP
5 1 1 1 60 11 1995 1694 10 23 0 g
5 1 1 1 60 12 2184 1685 43 27 46 a
4 1 1 1 61 0 643 1704 1584 84 -1
5 1 1 1 61 1 643 1756 45 32 37 ana
5 1 1 1 61 2 791 1767 2 5 44 '
5 1 1 1 61 3 856 1760 6 2 42 7
5 1 1 1 61 4 988 1757 11 5 29 n=
5 1 1 1 61 5 1201 1745 36 16 39 eld
5 1 1 1 61 6 1636 1728 19 14 48 Gs
5 1 1 1 61 7 1675 1728 20 16 52 93
5 1 1 1 61 8 1720 1732 5 5 40 2
5 1 1 1 61 9 1741 1723 32 18 42 $84
5 1 1 1 61 10 1794 1721 61 15 0 CHESR
5 1 1 1 61 11 1877 1717 33 32 43 22:
5 1 1 1 61 12 1959 1719 45 9 27 mc
5 1 1 1 61 13 2184 1704 43 15 49 feu
4 1 1 1 62 0 574 1725 1653 76 -1
5 1 1 1 62 1 574 1779 10 22 0 }
5 1 1 1 62 2 643 1779 72 14 63 gua
5 1 1 1 62 3 789 1752 56 42 34 cc
5 1 1 1 62 4 844 1786 98 1 35 ices
5 1 1 1 62 5 992 1764 82 23 23 PY
5 1 1 1 62 6 1096 1777 27 6 18 I
5 1 1 1 62 7 1152 1762 83 14 27 eT
5 1 1 1 62 8 1344 1744 10 23 52 {
5 1 1 1 62 9 1634 1742 24 21 15 ei
5 1 1 1 62 10 1674 1745 21 15 15 Gh
5 1 1 1 62 11 1718 1739 55 22 26 GSE:
5 1 1 1 62 12 1793 1734 62 24 0 ehe32
5 1 1 1 62 13 1874 1735 36 18 21 43!
5 1 1 1 62 14 1948 1730 56 22 24 Git?
5 1 1 1 62 15 2218 1725 9 14 37 5
4 1 1 1 63 0 571 1740 1656 92 -1
5 1 1 1 63 1 571 1800 144 32 39 pest
5 1 1 1 63 2 891 1787 145 12 11 SSS
5 1 1 1 63 3 1106 1782 41 16 14 ee
5 1 1 1 63 4 1204 1777 30 14 24 es
5 1 1 1 63 5 1342 1776 9 22 66 I
5 1 1 1 63 6 1633 1765 22 18 35 ip
5 1 1 1 63 7 1674 1759 22 24 41 ad
5 1 1 1 63 8 1720 1757 54 25 0 yap
5 1 1 1 63 9 1795 1755 60 18 0 fe8hs
5 1 1 1 63 10 1875 1754 34 21 26 Gh
5 1 1 1 63 11 1945 1749 59 23 10 agi’
5 1 1 1 63 12 2185 1740 42 7 34 ce
4 1 1 1 64 0 651 1772 1353 69 -1
5 1 1 1 64 1 651 1820 1 21 84 |
5 1 1 1 64 2 1324 1807 6 6 63 :
5 1 1 1 64 3 1633 1783 22 20 21 ee
5 1 1 1 64 4 1674 1783 22 23 45 BE
5 1 1 1 64 5 1717 1785 9 20 61 a
5 1 1 1 64 6 1741 1780 32 24 5 yf:
5 1 1 1 64 7 1877 1775 33 24 48 gua
5 1 1 1 64 8 1945 1772 59 22 47 gti
5 1 1 1 64 9 1986 1768 14 39 0 e
4 1 1 1 65 0 793 1803 1028 61 -1
5 1 1 1 65 1 793 1857 1 3 48 2
5 1 1 1 65 2 993 1840 68 24 0 ea8
5 1 1 1 65 3 1336 1807 68 53 50 Lz
5 1 1 1 65 4 1633 1806 140 32 41 Ha
5 1 1 1 65 5 1818 1803 3 9 16 yy.
5 1 1 1 65 6 1874 1801 50 28 47 Ge
5 1 1 1 65 7 1945 1799 74 26 45 link
4 1 1 1 66 0 566 1825 1452 73 -1
5 1 1 1 66 1 566 1871 9 23 62 !
5 1 1 1 66 2 748 1885 21 13 41 “
5 1 1 1 66 3 993 1858 68 23 21 aes
5 1 1 1 66 4 1633 1835 62 11 41 zeae
5 1 1 1 66 5 1724 1835 49 8 0 Sak
5 1 1 1 66 6 1820 1843 2 2 0 [/”
5 1 1 1 66 7 1876 1830 48 14 22 fuss
5 1 1 1 66 8 1945 1825 73 19 0 deed
4 1 1 1 67 0 563 1869 862 56 -1
5 1 1 1 67 1 563 1903 9 22 51 !
5 1 1 1 67 2 989 1888 72 31 21 Sze
5 1 1 1 67 3 1333 1869 9 22 13 ia
4 1 1 1 68 0 560 1883 1324 73 -1
5 1 1 1 68 1 560 1932 9 24 66 1
5 1 1 1 68 2 989 1919 72 14 41 <oa
5 1 1 1 68 3 1164 1916 40 21 38 29
5 1 1 1 68 4 1331 1900 8 22 32 I
5 1 1 1 68 5 1450 1903 16 5 56 ”
5 1 1 1 68 6 1849 1883 35 14 17 Zr
4 1 1 1 69 0 555 1913 1278 78 -1
5 1 1 1 69 1 555 1947 11 44 47 ni
5 1 1 1 69 2 989 1941 44 11 22 +O
5 1 1 1 69 3 1164 1930 40 29 23 g2
5 1 1 1 69 4 1327 1931 10 21 0 t
5 1 1 1 69 5 1536 1939 1 3 17 :
5 1 1 1 69 6 1831 1913 2 2 0 p
4 1 1 1 70 0 554 1954 1380 64 -1
5 1 1 1 70 1 554 1996 10 22 43 I
5 1 1 1 70 2 891 1980 26 36 49 SSS
5 1 1 1 70 3 1164 1979 40 23 18 2o
5 1 1 1 70 4 1352 1974 54 20 12 Tait
5 1 1 1 70 5 1459 1984 4 1 0 .
5 1 1 1 70 6 1517 1978 13 8 0 -
5 1 1 1 70 7 1879 1954 5 19 0 Ur
5 1 1 1 70 8 1932 1962 2 2 0 Le
4 1 1 1 71 0 551 1992 1334 57 -1
5 1 1 1 71 1 551 2027 10 22 33 J
5 1 1 1 71 2 797 2021 10 10 90 \
5 1 1 1 71 3 1160 2005 44 25 51 zg
5 1 1 1 71 4 1401 2002 42 20 29 PA
4 1 1 1 72 0 548 2024 917 58 -1
5 1 1 1 72 1 548 2058 29 23 0 '
5 1 1 1 72 2 652 2065 40 16 2 ea
5 1 1 1 72 3 703 2054 17 28 2 5
5 1 1 1 72 4 1160 2032 44 25 51 ie
5 1 1 1 72 5 1319 2024 9 22 6 '
5 1 1 1 72 6 1463 2028 2 3 44 t
4 1 1 1 73 0 546 2055 809 60 -1
5 1 1 1 73 1 546 2090 9 22 75 I
5 1 1 1 73 2 652 2078 13 23 79 8
5 1 1 1 73 3 680 2072 45 43 14 32>
5 1 1 1 73 4 1316 2055 39 21 80 I.
4 1 1 1 74 0 543 2077 917 65 -1
5 1 1 1 74 1 543 2121 8 21 46 I
5 1 1 1 74 2 648 2102 73 31 68 £26
5 1 1 1 74 3 1313 2086 9 22 60 !
5 1 1 1 74 4 1458 2077 2 3 31 ;
4 1 1 1 75 0 648 2073 1513 72 -1
5 1 1 1 75 1 648 2130 73 15 12 a0
5 1 1 1 75 2 928 2134 1 3 73 i
5 1 1 1 75 3 1076 2117 21 14 42 a
5 1 1 1 75 4 1395 2105 42 12 18 ae
5 1 1 1 75 5 1905 2088 43 14 19 Py
5 1 1 1 75 6 2041 2092 11 6 87 =
5 1 1 1 75 7 2146 2073 15 30 0 mR
4 1 1 1 76 0 540 2095 1628 78 -1
5 1 1 1 76 1 540 2151 9 22 19 !
5 1 1 1 76 2 648 2153 72 11 46 RRS
5 1 1 1 76 3 1310 2117 9 22 4 t
5 1 1 1 76 4 1909 2104 39 13 46 LX
5 1 1 1 76 5 2041 2099 11 14 88 =
5 1 1 1 76 6 2145 2095 23 16 0 Q
4 1 1 1 77 0 565 2100 1599 85 -1
5 1 1 1 77 1 565 2182 1 3 58 '
5 1 1 1 77 2 648 2165 72 11 79 EES
5 1 1 1 77 3 1307 2148 9 23 54 I
5 1 1 1 77 4 2041 2119 11 18 52 x
5 1 1 1 77 5 2131 2100 33 38 15 fon)
4 1 1 1 78 0 537 2131 1631 74 -1
5 1 1 1 78 1 537 2183 9 22 58 I
5 1 1 1 78 2 1303 2176 10 25 93 i
5 1 1 1 78 3 1464 2177 31 3 30 wih
5 1 1 1 78 4 1950 2149 2 2 3 ;
5 1 1 1 78 5 2041 2143 11 17 67 3
5 1 1 1 78 6 2145 2131 23 33 52 3
4 1 1 1 79 0 534 2166 1634 70 -1
5 1 1 1 79 1 534 2214 28 22 34 I.
5 1 1 1 79 2 1174 2202 68 23 27 Zo
5 1 1 1 79 3 1483 2201 2 2 38 2
5 1 1 1 79 4 1810 2184 6 13 0 t
5 1 1 1 79 5 1936 2169 66 18 0 <—
5 1 1 1 79 6 2040 2166 12 22 67 5
5 1 1 1 79 7 2145 2172 23 8 47 -
4 1 1 1 80 0 531 2175 1625 91 -1
5 1 1 1 80 1 531 2245 9 21 24 I
5 1 1 1 80 2 757 2237 21 11 16 <
5 1 1 1 80 3 1174 2221 68 29 59 aag
5 1 1 1 80 4 1301 2209 10 28 29 dh
5 1 1 1 80 5 1363 2224 2 2 21 3
5 1 1 1 80 6 1732 2217 7 9 0 »
5 1 1 1 80 7 1813 2198 4 33 23 ft
5 1 1 1 80 8 1997 2193 21 23 0 2,
5 1 1 1 80 9 2041 2189 11 21 48 3
5 1 1 1 80 10 2144 2175 12 45 47 uw
4 1 1 1 81 0 528 2214 1640 84 -1
5 1 1 1 81 1 528 2270 113 28 23 fone
5 1 1 1 81 2 1170 2245 72 43 58 Szu
5 1 1 1 81 3 1298 2241 10 22 0 f
5 1 1 1 81 4 1416 2254 2 2 0 .
5 1 1 1 81 5 1519 2250 5 11 0 y
5 1 1 1 81 6 1731 2229 8 28 0 §
5 1 1 1 81 7 1997 2215 55 35 38 HE
5 1 1 1 81 8 2145 2214 23 25 0 E
4 1 1 1 82 0 381 2243 1787 86 -1
5 1 1 1 82 1 381 2318 3 1 0 .
5 1 1 1 82 2 525 2307 10 22 29 '
5 1 1 1 82 3 1170 2272 135 36 43 <ga.!
5 1 1 1 82 4 1731 2258 22 30 34 fy
5 1 1 1 82 5 1864 2269 36 6 80 SA
5 1 1 1 82 6 1997 2252 78 28 67 Hos
5 1 1 1 82 7 2088 2239 32 46 16 |
4 1 1 1 83 0 158 2273 2068 96 -1
5 1 1 1 83 1 158 2324 23 45 71 <x
5 1 1 1 83 2 823 2321 2 2 42 .
5 1 1 1 83 3 942 2322 2 2 44 :
5 1 1 1 83 4 1171 2315 16 6 61 =
5 1 1 1 83 5 1198 2310 15 11 61 0
5 1 1 1 83 6 1226 2310 13 11 54 0
5 1 1 1 83 7 1293 2304 8 21 40 I
5 1 1 1 83 8 1395 2303 9 4 30 *t
5 1 1 1 83 9 1732 2289 21 15 26 8a
5 1 1 1 83 10 1831 2295 2 2 62 K
5 1 1 1 83 11 1996 2275 22 12 67 a5
5 1 1 1 83 12 2041 2274 11 18 67 g
5 1 1 1 83 13 2068 2289 6 2 48 8
5 1 1 1 83 14 2145 2275 30 3 87 —
5 1 1 1 83 15 2217 2273 9 11 0 i
4 1 1 1 84 0 155 2285 2071 106 -1
5 1 1 1 84 1 155 2363 34 28 92 a
5 1 1 1 84 2 522 2338 9 22 0 !
5 1 1 1 84 3 1732 2301 21 25 40 ae
5 1 1 1 84 4 1842 2306 2 2 0 ‘
5 1 1 1 84 5 2041 2293 11 21 0 -
5 1 1 1 84 6 2154 2275 11 41 61 Oo
5 1 1 1 84 7 2217 2285 9 27 48 =
4 1 1 1 85 0 155 2308 2070 116 -1
5 1 1 1 85 1 155 2396 34 28 87 >
5 1 1 1 85 2 520 2369 8 21 48 I
5 1 1 1 85 3 1290 2334 8 22 30 I
5 1 1 1 85 4 1450 2351 2 2 27 ‘
5 1 1 1 85 5 1528 2335 16 18 74 2
5 1 1 1 85 6 1732 2327 21 21 29 Ee
5 1 1 1 85 7 1816 2325 65 13 76 AES
5 1 1 1 85 8 2041 2316 33 17 20 ea
5 1 1 1 85 9 2145 2308 23 33 84 Q
5 1 1 1 85 10 2217 2316 8 13 80 =
4 1 1 1 86 0 1136 2331 1090 51 -1
5 1 1 1 86 1 1136 2379 2 3 0 ,
5 1 1 1 86 2 1526 2353 44 16 42 ay
5 1 1 1 86 3 1731 2349 22 15 39 3:
5 1 1 1 86 4 2037 2336 45 15 11 how)
5 1 1 1 86 5 2217 2331 9 15 0 £
4 1 1 1 87 0 155 2344 2013 110 -1
5 1 1 1 87 1 155 2429 34 25 33 i
5 1 1 1 87 2 516 2400 9 22 0 f
5 1 1 1 87 3 1287 2365 9 23 18 :
5 1 1 1 87 4 1526 2364 44 37 81 ge
5 1 1 1 87 5 1731 2361 25 26 31 Me
5 1 1 1 87 6 2037 2345 48 30 30 cep
5 1 1 1 87 7 2153 2344 10 16 0 y
5 1 1 1 87 8 2217 2347 9 23 72 ¢
4 1 1 1 88 0 155 2371 2071 121 -1
5 1 1 1 88 1 155 2461 35 31 72 O
5 1 1 1 88 2 510 2431 13 53 43 i
5 1 1 1 88 3 666 2442 25 23 37 «
5 1 1 1 88 4 885 2456 3 2 2 i?
5 1 1 1 88 5 1033 2415 58 35 0 i
5 1 1 1 88 6 1280 2397 13 52 92 i
5 1 1 1 88 7 1526 2395 44 40 59 28
5 1 1 1 88 8 2059 2371 109 37 40 “7S
5 1 1 1 88 9 2217 2371 9 26 91 3
4 1 1 1 89 0 662 2408 1566 66 -1
5 1 1 1 89 1 662 2467 2 2 60 4
5 1 1 1 89 2 874 2456 24 14 21 ge
5 1 1 1 89 3 1530 2422 18 32 20 Ff
5 1 1 1 89 4 2217 2408 11 15 83 =
4 1 1 1 90 0 154 2412 2071 119 -1
5 1 1 1 90 1 154 2487 23 44 21 <q
5 1 1 1 90 2 507 2494 10 21 49 1
5 1 1 1 90 3 876 2458 114 37 27 Ory
5 1 1 1 90 4 1265 2458 22 23 22 |
5 1 1 1 90 5 1530 2440 40 53 64 32
5 1 1 1 90 6 2145 2412 80 38 32 cf
4 1 1 1 91 0 609 2453 1559 65 -1
5 1 1 1 91 1 609 2516 2 2 59 /
5 1 1 1 91 2 943 2494 45 15 33 RSF
5 1 1 1 91 3 1330 2497 2 3 0 :
5 1 1 1 91 4 1418 2491 2 1 0 i
5 1 1 1 91 5 1554 2473 16 18 87 2
5 1 1 1 91 6 1845 2473 8 12 13 ,
5 1 1 1 91 7 2145 2446 83 29 25 a
4 1 1 1 92 0 155 2476 2013 97 -1
5 1 1 1 92 1 155 2542 34 31 61 S
5 1 1 1 92 2 402 2556 13 12 27 go
5 1 1 1 92 3 505 2524 90 30 48 bcd
5 1 1 1 92 4 1272 2490 12 53 56 i
5 1 1 1 92 5 1536 2472 20 76 49 oa
5 1 1 1 92 6 1661 2507 9 16 24 oi
5 1 1 1 92 7 1722 2487 69 36 24 gd
5 1 1 1 92 8 2145 2476 23 19 16 z
4 1 1 1 93 0 155 2499 2070 106 -1
5 1 1 1 93 1 155 2577 34 28 69 2
5 1 1 1 93 2 398 2563 45 28 55 23
5 1 1 1 93 3 502 2555 8 23 64 !
5 1 1 1 93 4 585 2561 73 23 23 Que
5 1 1 1 93 5 1526 2528 44 15 13 £u
5 1 1 1 93 6 1661 2520 9 18 26 e
5 1 1 1 93 7 1722 2524 9 15 27 z¢
5 1 1 1 93 8 1783 2512 8 28 5 &€
5 1 1 1 93 9 1824 2508 20 38 31 @&
5 1 1 1 93 10 2145 2499 23 22 82 O
5 1 1 1 93 11 2217 2501 8 19 58 ¢
4 1 1 1 94 0 430 2520 1795 89 -1
5 1 1 1 94 1 430 2588 13 10 93 2
5 1 1 1 94 2 499 2586 9 23 64 I
5 1 1 1 94 3 589 2577 69 18 75 2365
5 1 1 1 94 4 1305 2566 1 4 0 :
5 1 1 1 94 5 1411 2552 2 2 0 ,
5 1 1 1 94 6 1528 2543 42 18 74 BS
5 1 1 1 94 7 1661 2539 9 15 0 e
5 1 1 1 94 8 1723 2540 8 7 29 ®
5 1 1 1 94 9 1783 2540 8 7 39 5
5 1 1 1 94 10 1842 2529 8 30 26 zt
5 1 1 1 94 11 2145 2525 23 22 84 =
5 1 1 1 94 12 2217 2520 8 13 0 «
4 1 1 1 95 0 155 2539 2071 79 -1
5 1 1 1 95 1 155 2611 34 7 83 —
5 1 1 1 95 2 402 2599 41 11 0 os
5 1 1 1 95 3 617 2589 14 11 44 a
5 1 1 1 95 4 1526 2556 44 10 48 2S
5 1 1 1 95 5 1661 2551 9 16 10 g
5 1 1 1 95 6 1725 2551 6 13 79 3
5 1 1 1 95 7 1783 2551 8 9 50 a
5 1 1 1 95 8 1847 2557 5 3 0 E
5 1 1 1 95 9 2217 2539 9 8 11 s
4 1 1 1 96 0 157 2548 2068 99 -1
5 1 1 1 96 1 157 2620 32 27 42 —
5 1 1 1 96 2 398 2606 45 18 66 38
5 1 1 1 96 3 585 2595 69 28 7 2—<4
5 1 1 1 96 4 1531 2567 39 13 61 xo
5 1 1 1 96 5 1661 2569 9 16 33 é
5 1 1 1 96 6 1722 2564 9 12 0 s
5 1 1 1 96 7 1783 2563 8 7 0 e
5 1 1 1 96 8 1844 2557 2 13 0 p
5 1 1 1 96 9 2220 2548 5 8 0 z
4 1 1 1 97 0 398 2551 1830 89 -1
5 1 1 1 97 1 398 2624 45 15 39 Bo
5 1 1 1 97 2 460 2610 33 36 0 é(€U«&f
5 1 1 1 97 3 585 2615 45 16 2 ar
5 1 1 1 97 4 1267 2583 52 22 56 i
5 1 1 1 97 5 1484 2590 1 3 32 ,
5 1 1 1 97 6 1526 2580 44 12 77 ws
5 1 1 1 97 7 1661 2578 9 18 0 &
5 1 1 1 97 8 1723 2578 8 17 27 ¢
5 1 1 1 97 9 1783 2572 8 16 86 &
5 1 1 1 97 10 1844 2572 9 15 73 &
5 1 1 1 97 11 2156 2547 9 36 56 Oo
5 1 1 1 97 12 2217 2561 11 15 13 ¢
4 1 1 1 98 0 141 2576 2085 103 -1
5 1 1 1 98 1 141 2619 45 60 34 tu
5 1 1 1 98 2 399 2637 44 21 72 ge
5 1 1 1 98 3 585 2631 45 13 19 ae
5 1 1 1 98 4 637 2606 21 42 19 ai
5 1 1 1 98 5 1260 2614 12 22 46 1m
5 1 1 1 98 6 1661 2598 2 5 44 i
5 1 1 1 98 7 1725 2589 66 14 20 ROR
5 1 1 1 98 8 1844 2588 9 15 20 OE
5 1 1 1 98 9 2154 2564 10 39 30 ao
5 1 1 1 98 10 2217 2581 9 10 71 7
4 1 1 1 99 0 402 2591 1824 85 -1
5 1 1 1 99 1 402 2651 41 24 59 3g
5 1 1 1 99 2 493 2647 9 23 11 7
5 1 1 1 99 3 586 2653 72 23 64 hor
5 1 1 1 99 4 1214 2626 29 5 14 «3
5 1 1 1 99 5 1315 2634 2 4 73 i
5 1 1 1 99 6 1427 2622 48 16 7 Ss
5 1 1 1 99 7 2165 2607 7 3 43 ~
4 1 1 1 100 0 151 2615 2075 108 -1
5 1 1 1 100 1 151 2676 24 47 64 uw
5 1 1 1 100 2 402 2678 41 32 74 go
5 1 1 1 100 3 490 2679 9 23 81 f
5 1 1 1 100 4 1260 2645 10 29 37 1
5 1 1 1 100 5 1368 2656 2 16 28 Bey
5 1 1 1 100 6 1427 2666 2 2 43 Re
5 1 1 1 100 7 1477 2662 3 3 28 ay
5 1 1 1 100 8 2145 2615 51 20 81 Wz
5 1 1 1 100 9 2217 2622 9 19 50 =
4 1 1 1 101 0 155 2636 2041 109 -1
5 1 1 1 101 1 155 2712 34 33 95 =
5 1 1 1 101 2 399 2709 49 17 45 ee
5 1 1 1 101 3 1256 2676 31 22 33 MR,
5 1 1 1 101 4 1344 2677 1 1 31 8
5 1 1 1 101 5 1380 2651 54 72 26 UB
5 1 1 1 101 6 2145 2636 80 26 9 oat
4 1 1 1 102 0 402 2657 1821 91 -1
5 1 1 1 102 1 402 2726 41 22 72 2s
5 1 1 1 102 2 487 2711 10 22 3 '
5 1 1 1 102 3 1254 2707 10 22 50 I
5 1 1 1 102 4 1360 2692 2 2 67 ;
5 1 1 1 102 5 1413 2680 16 34 22 se
5 1 1 1 102 6 2145 2657 51 43 22 So
5 1 1 1 102 7 2217 2664 6 11 19 g
4 1 1 1 103 0 398 2675 1828 85 -1
5 1 1 1 103 1 398 2750 17 3 51 =
5 1 1 1 103 2 422 2737 18 23 51 ae
5 1 1 1 103 3 1411 2707 7 4 4 2
5 1 1 1 103 4 2220 2675 6 14 41 =
4 1 1 1 104 0 155 2686 2071 114 -1
5 1 1 1 104 1 155 2750 26 50 48 wu
5 1 1 1 104 2 398 2754 45 23 76 es
5 1 1 1 104 3 484 2742 10 22 79 !
5 1 1 1 104 4 1315 2725 44 17 38 Yip
5 1 1 1 104 5 2179 2686 47 28 27 bE
4 1 1 1 105 0 403 2702 1823 93 -1
5 1 1 1 105 1 403 2778 40 12 52 x3
5 1 1 1 105 2 481 2772 10 23 30 yf
5 1 1 1 105 3 1252 2738 9 22 62 I
5 1 1 1 105 4 1349 2747 15 9 15 -
5 1 1 1 105 5 2145 2702 81 27 48 tif
4 1 1 1 106 0 162 2726 2064 96 -1
5 1 1 1 106 1 162 2789 9 33 70 Ww
5 1 1 1 106 2 398 2790 45 12 75 ws
5 1 1 1 106 3 913 2763 14 35 45 be
5 1 1 1 106 4 1160 2754 27 34 13 a?
5 1 1 1 106 5 1330 2754 20 15 32 a
5 1 1 1 106 6 1973 2748 77 1 47 =
5 1 1 1 106 7 2145 2726 52 19 33 Oo
4 1 1 1 107 0 155 2748 2071 101 -1
5 1 1 1 107 1 155 2822 34 27 0 E
5 1 1 1 107 2 479 2803 115 27 9 hae
5 1 1 1 107 3 1249 2769 8 23 24 :
5 1 1 1 107 4 1676 2764 9 23 84 4
5 1 1 1 107 5 1738 2765 8 15 60 2
5 1 1 1 107 6 1799 2765 9 13 56 a
5 1 1 1 107 7 1859 2765 9 15 56 4
5 1 1 1 107 8 1946 2757 6 7 74 4
5 1 1 1 107 9 2145 2748 81 27 0 >3!
4 1 1 1 108 0 626 2764 1599 80 -1
5 1 1 1 108 1 626 2814 30 30 24 son
5 1 1 1 108 2 664 2814 23 30 46 ee
5 1 1 1 108 3 1207 2812 3 1 27 sic
5 1 1 1 108 4 1674 2778 8 30 0 Eg
5 1 1 1 108 5 1738 2783 8 18 0 z
5 1 1 1 108 6 1799 2779 9 15 51 3
5 1 1 1 108 7 1847 2772 21 30 33 Fa
5 1 1 1 108 8 2009 2772 37 18 43 Leo
5 1 1 1 108 9 2067 2765 16 30 29 WV
5 1 1 1 108 10 2179 2764 46 15 47 Qs
4 1 1 1 109 0 145 2775 2080 106 -1
5 1 1 1 109 1 145 2846 12 35 19 |
5 1 1 1 109 2 675 2826 44 31 6 -——
5 1 1 1 109 3 727 2826 24 31 21 so
5 1 1 1 109 4 750 2833 62 17 47 oe
5 1 1 1 109 5 786 2826 25 31 56 me
5 1 1 1 109 6 1239 2820 5 1 0 r
5 1 1 1 109 7 1677 2802 8 11 36 a
5 1 1 1 109 8 1738 2798 8 21 42 4
5 1 1 1 109 9 1802 2795 6 15 51 ?
5 1 1 1 109 10 1859 2795 2 6 67 q
5 1 1 1 109 11 1964 2785 27 19 52 PS
5 1 1 1 109 12 2009 2791 37 16 23 p28
5 1 1 1 109 13 2145 2775 80 22 33 Loe
4 1 1 1 110 0 155 2794 2071 94 -1
5 1 1 1 110 1 155 2881 34 7 42 —
5 1 1 1 110 2 821 2844 23 10 49 —
5 1 1 1 110 3 1226 2831 26 22 62 a
5 1 1 1 110 4 1353 2845 3 1 11 :
5 1 1 1 110 5 1676 2810 9 28 26 ge
5 1 1 1 110 6 1738 2820 8 14 46 Fo
5 1 1 1 110 7 1799 2812 9 19 54 3
5 1 1 1 110 8 1859 2810 9 16 8 Af
5 1 1 1 110 9 1964 2805 27 21 57 ag
5 1 1 1 110 10 2009 2802 51 24 37 eee
5 1 1 1 110 11 2145 2794 51 32 61 Sw
5 1 1 1 110 12 2217 2801 9 14 74 é
4 1 1 1 111 0 155 2820 2040 106 -1
5 1 1 1 111 1 155 2893 34 33 96 =
5 1 1 1 111 2 1050 2859 42 18 16 a
5 1 1 1 111 3 1091 2851 31 49 37 al
5 1 1 1 111 4 1334 2852 2 2 45 ;
5 1 1 1 111 5 1676 2835 9 24 84 2
5 1 1 1 111 6 1722 2831 24 26 55 <2
5 1 1 1 111 7 1783 2832 25 21 53 yf
5 1 1 1 111 8 1843 2827 25 19 63 32
5 1 1 1 111 9 1964 2823 27 24 15 g8
5 1 1 1 111 10 2009 2820 51 25 16 gees
5 1 1 1 111 11 2145 2820 50 22 28 Fe
5 1 1 1 111 12 2217 2819 9 18 23 i
4 1 1 1 112 0 1131 2835 1066 56 -1
5 1 1 1 112 1 1131 2862 118 29 0 aoat
5 1 1 1 112 2 1663 2860 22 17 53 af
5 1 1 1 112 3 1721 2854 25 19 33 2k
5 1 1 1 112 4 1783 2853 25 22 29 a2
5 1 1 1 112 5 1843 2850 25 22 67 EE
5 1 1 1 112 6 1964 2848 27 20 65 a2
5 1 1 1 112 7 2009 2843 51 26 31 fees]
5 1 1 1 112 8 2088 2822 37 55 84 |
5 1 1 1 112 9 2145 2835 52 30 0 SS
5 1 1 1 112 10 2217 2845 7 10 33 =
4 1 1 1 113 0 155 2853 2041 111 -1
5 1 1 1 113 1 155 2931 34 33 68 S
5 1 1 1 113 2 634 2916 55 22 27 Sed
5 1 1 1 113 3 1663 2878 22 29 32 di
5 1 1 1 113 4 1721 2877 25 22 43 ge
5 1 1 1 113 5 1783 2873 25 20 72 ge
5 1 1 1 113 6 1843 2871 25 24 29 ie
5 1 1 1 113 7 1964 2865 27 26 42 Be
5 1 1 1 113 8 2009 2862 51 24 25 regs
5 1 1 1 113 9 2145 2853 51 27 38 SB
5 1 1 1 113 10 2220 2862 6 18 0 §
4 1 1 1 114 0 654 2876 1542 76 -1
5 1 1 1 114 1 654 2950 2 2 28 :
5 1 1 1 114 2 751 2951 3 1 3 .
5 1 1 1 114 3 1663 2899 22 22 53 a
5 1 1 1 114 4 1721 2899 25 18 55 ge
5 1 1 1 114 5 1783 2894 25 23 72 ge
5 1 1 1 114 6 1843 2891 25 26 24 gf
5 1 1 1 114 7 1964 2893 27 19 32 ee
5 1 1 1 114 8 2009 2885 51 26 20 been
5 1 1 1 114 9 2145 2876 51 37 84 ro
4 1 1 1 115 0 1663 2897 562 42 -1
5 1 1 1 115 1 1663 2918 15 21 32 ae
5 1 1 1 115 2 1721 2917 25 22 49 ge
5 1 1 1 115 3 1783 2918 25 17 41 oak
5 1 1 1 115 4 1843 2911 18 21 40 of
5 1 1 1 115 5 1964 2907 27 17 65 oe
5 1 1 1 115 6 2009 2907 51 19 29 bebe
5 1 1 1 115 7 2220 2897 5 12 0 é
4 1 1 1 116 0 166 2909 2060 103 -1
5 1 1 1 116 1 166 2965 13 47 69 oO
5 1 1 1 116 2 673 2987 2 2 21 i
5 1 1 1 116 3 717 2973 25 13 0 BY
5 1 1 1 116 4 1663 2932 22 15 26 2B
5 1 1 1 116 5 1722 2935 22 12 23 2)
5 1 1 1 116 6 1783 2932 25 16 34 Ba
5 1 1 1 116 7 1843 2925 25 23 12 OBB
5 1 1 1 116 8 1964 2917 27 30 40 32
5 1 1 1 116 9 2009 2916 51 32 50 2530
5 1 1 1 116 10 2145 2909 51 33 73 as
5 1 1 1 116 11 2217 2910 9 33 21 i
4 1 1 1 117 0 158 2947 1833 100 -1
5 1 1 1 117 1 158 3001 24 46 52 Oo
5 1 1 1 117 2 1541 2970 12 15 37 ar
5 1 1 1 117 3 1623 2971 15 13 55 og
5 1 1 1 117 4 1645 2951 34 45 74 [.
5 1 1 1 117 5 1964 2947 27 23 36 gE
5 1 1 1 117 6 2009 2947 51 23 0 FSce
4 1 1 1 118 0 1566 2967 681 40 -1
5 1 1 1 118 1 1566 3003 1 4 25 “=
5 1 1 1 118 2 1623 2986 15 13 57 2
5 1 1 1 118 3 1678 2981 7 22 50 18
5 1 1 1 118 4 1964 2967 27 22 19 gz
5 1 1 1 118 5 2009 2966 51 26 0 bsee
5 1 1 1 118 6 2245 2972 2 2 42 .
4 1 1 1 119 0 155 2983 2095 90 -1
5 1 1 1 119 1 155 3050 34 23 76 z
5 1 1 1 119 2 1622 3001 16 28 60 6
5 1 1 1 119 3 1675 3003 10 22 7 |&
5 1 1 1 119 4 1964 2990 27 21 31 da
5 1 1 1 119 5 2009 2986 51 25 54 Eee
5 1 1 1 119 6 2244 2983 6 20 68 3
4 1 1 1 120 0 158 3003 2092 115 -1
5 1 1 1 120 1 158 3073 23 45 56 <x
5 1 1 1 120 2 1513 3033 2 5 0 *
5 1 1 1 120 3 1623 3031 15 11 29 om
5 1 1 1 120 4 1675 3029 10 7 12 |*
5 1 1 1 120 5 1964 3011 27 10 12 to
5 1 1 1 120 6 2009 3008 37 24 74 fee
5 1 1 1 120 7 2086 3018 2 3 9 DB,
5 1 1 1 120 8 2169 3007 34 19 45 wn
5 1 1 1 120 9 2232 3003 18 25 40 i:
4 1 1 1 121 0 155 3025 2096 114 -1
5 1 1 1 121 1 155 3112 34 27 53 a
5 1 1 1 121 2 1623 3044 15 10 13 a
5 1 1 1 121 3 2169 3027 33 30 42 as
4 1 1 1 122 0 155 3099 2095 104 -1
5 1 1 1 122 1 155 3175 34 28 87 z
5 1 1 1 122 2 2232 3099 18 20 39 iSection 40
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
7 OPW22/0029 DEVELOPMENT APPLICATION FOR OPERATIONAL WORKS
(PRESCRIBED TIDAL WORKS – NOOSA RIVER OYSTER HABITAT
RESTORATION) FOR NOOSA RIVER
Author Coordinator Engineering, Mark Lewis
(drafted by Marine Approval Specialists, Tonia Richard)
Index ECM/ Application/ OPW22/0029
Attachments 1. Report by Marine Approval Specialists (80 page attachment
provided separately to this agenda)
2. Noosa Oyster Ecosystem Restoration Project - Project
Restoration Plan (75 page attachment provided separately to this
agenda)
APPLICATION DETAILS
Application No. OPW22/0029
Applicant The Nature Conservancy (TNC)
Proposal Development Permit for Operational Works - Prescribed Tidal
Works – Habitat restoration/enhancement
Properly Made Date 25 January 2022
Information Request Date NA
Information Response Date NA
Decision Due Date 1 June 2022
PROPERTY DETAILS
Property Address Goat Island Noosa North Shore Qld 4565
RP Description SP 103385, BUP 13469, Lot 1 RP 92804, Lot 7 RP 107007, BUP
2048, Lot 3 RP 106422, Lot 2 RP 106422, Lot 1 RP 97493, BUP
8432, Lot 604 SP 188270, Lot 326 CP 855842, Lot 35 MCH
4795, Lot 5 SP 234718
Land Area Adjacent to above listed lots
Existing Use of Land Noosa River
STATUTORY DETAILS
SEQRP Designation Regional Landscape and Rural Production Area
Zone Not Applicable
Precinct Not Applicable
Local Plan Area Noosaville
Overlays Acid Sulfate Soils, Biodiversity, Waterways and Wetlands,
Bushfire Hazard, Coastal Protection and Scenic Amenity, Flood
Hazard, Heritage and Character Areas, Landslide Hazard
Assessment Type Code
Page 40 of 96
Section 41
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
EXECUTIVE SUMMARY
This report considers a development application for the proposed Noosa Oyster Ecosystem
Restoration Project. The Noosa Oyster Ecosystem Restoration Project is a partnership
between The Nature Conservancy (TNC) and Noosa Shire Council (NSC) formed to deliver
oyster ecosystem restoration in the Noosa River at 4 sites, being Tewantin, Goat Island and
Noosa Sound East and West.
Council has engaged external consultants Marine Approval Specialists to undertake external
specialist assessment of the application and provide an assessment of the Project against
the Noosa Plan 2020 and the Coastal Protection & Management Regulation 2017. Marine
Approval Specialists conclude that the Project complies with the Noosa Plan 2020 and
relevant codes, in addition to relevant codes of the Coastal Protection & Management
Regulation 2017.
The site is contained within tidal waters and subject to detailed assessment by State
government agencies. The State Referral and Assessment Agency (SARA) recommends
approval of the project subject to referral agency conditions.
The report from Marine Approval Specialists additionally recommends a Construction
Environmental Management Plan (CEMP) – the key document which will govern site
environmental management practices to be implemented by the appointed contractor for the
works. Conditions of approval have been proposed by SARA and Marine Approval
Specialists.
The approval is specifically confined to Phase 1 - Pilot Phase of the Project, which has four
defined sites and locations. Phase 2- Ongoing Projects will be subject to further evaluation
and approvals following the initial phase.
RECOMMENDATION
That Council note the report by Coordinator Engineering to the General Committee Meeting
dated 16 May 2022 regarding Application No. OPW22/0029 for Operational Works
(Prescribed Tidal Works – Noosa River Oyster Habitat Restoration for Noosa River and
A. Approve the application in accordance with Referral Agency Conditions provided by
SARA on 7 April 2022 and the following conditions:
Approved Plans
1. Phase 1 – Pilot Phase is only approved as part of this development approval.
2. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
NROR-2021-00 A General Notes & Site Selection 09/07/2021
NROR-2021-01 - Restoration Zones 20/05/2021
NROR-2021-02 A Module Designs 09/07/2021
NROR-2021-03 A Goat Island Restoration Site 09/07/2021
NROR-2021-04 A Tewantin Island Restoration Site 09/07/2021
NROR-2021-05 A Noosa Sound West Restoration Site 09/07/2021
NROR-2021-06 A Noosa Sound East Restoration Site 09/07/2021
Currency Period
3. The development approval lapses if the works have not been substantially
started by 19 May 2024, unless an application to extend the currency period is
approved by Council.
General Conditions
4. All works must be undertaken in accordance with the Noosa Oyster Restoration
Page 41 of 96
Section 42
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Project – Project Restoration Plan prepared by The Nature Conservancy dated
January 2022.
5. All works must be undertaken in accordance with Maritime Safety Queensland
(MSQ) and Department of Agriculture and Fisheries (DAF) requirements relating
to signage and aids to navigation as detailed in the Noosa Oyster Restoration
Project – Project Restoration Plan (Section 7) prepared by The Nature
Conservancy dated January 2022.
6. All works must be undertaken in accordance with DAF requirements relating to
notifications, marking of approved boundary areas and restoration of marine
plants/tidal profiles that are temporarily impacted as a result of the works as
detailed in the SARA Decision Notice.
7. All works must be undertaken in accordance with Best Practice Erosion and
Sediment Control (BPESC) guidelines for Australia (International Erosion Control
Association).
8. All works must be undertaken in accordance with Sections 6.1 and 6.4 of Noosa
Oyster Ecosystem Restoration Project - Project Restoration Plan prepared by
The Nature Conservancy Australia dated January 2022.
9. All works must be undertaken in accordance with the current Queensland Acid
Sulfate Soil Technical Manual: Soil management guidelines, prepared by the
Department of Science, Information Technology, Innovation and the Arts, 2014.
10. All materials used for construction works must be clean materials to ensure that
the works do not contaminate the waterway.
11. All structures must be designed and constructed such that they are free standing
within the waterway and are not connected to or behind the revetment wall.
12. All structures must have no detrimental effects on stormwater drains and/or
easements.
13. In the event of collapse or failure of structural integrity of the oyster restoration
substrates, the works must be removed from the waterway or reconstructed in
accordance with this development approval.
14. All works must be undertaken in accordance with an approved Construction
Environmental Management Plan (CEMP) which consolidates the commitments
and management measures described in the Noosa Oyster Ecosystem
Restoration Project – Project Restoration Plan including, but not limited to:
a. A Site Management Plan which describes environmental management
measures at the proposed load out site including details of stockpile
management;
b. An Erosion and Sediment Control Plan (ESCP) in accordance with BPESC
guidelines;
c. A Marine Plant and Water Quality Monitoring Plan designed to monitor the
composition of marine plant assemblages at habitat restoration sites and
appropriate sites upstream and downstream; and
d. A Marine Biosecurity Management Plan for construction vessels.
The CEMP should be submitted to Council for approval 20 business days prior
to the commencement of works.
15. A monitoring report must be provided to Council on a six-monthly basis for the
first year (and annually for the following 4 years) following completion of
construction works which details the results of restoration monitoring and
evaluation, including adaptive management measures taken and the success or
otherwise of those measures.
Page 42 of 96
Section 43
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
16. Upon completion of construction works, any construction debris or waste must
be removed from site and disposed of appropriately.
17. Lighting associated with the construction phase must be designed, installed,
operated and maintained in accordance with Section 3 of AS4282 Control of the
Obtrusive Effects of Outdoor Lighting.
18. Wastewater and sullage must only be disposed of at approved pumpout facilities.
19. Any construction and post construction activity must not impact on the condition
of the waterway, and is to be conducted so as not to breach the Environmental
Protection Act EPA (1994) and the Environmental Protection (Water) Policy
2009.
20. Certification by a Registered Professional Engineer of Queensland that states
that the oyster habitat restoration substrates are constructed in accordance with
best practice methods and is structurally sound must be submitted to Council.
This certification must be submitted to Council within three (3) months of the
completion of the works.
21. After completion, the proposed works must be maintained in a sound state of
repair in accordance with the approved plans
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
REPORT
6. PROPOSAL
The purpose of the proposed Noosa Oyster Ecosystem Restoration Project (the Project) is
to restore rock oyster ecosystems to the Noosa River estuary and therefore improve overall
ecosystem function through improving fish habitats and fisheries resources.
The applicant proposes the following benefits will be achieved as a result of the Project:
- Provision of complex habitat types for marine species.
- Filtering of water and removal of suspended sediment and pollution.
- Nutrient processing.
- Bank stabilisation and protection.
- Provision of complex vertical and horizontal living spaces and feeding grounds, for a
multitude of intertidal and marine species.
- Enhancing marine and coastal lifestyle and tourism activities such as fishing, diving
and bird watching.
Phase 1 works (the subject of this Development Application) include deploying oyster bed
restoration substrates i.e., rock (augmented with small volumes of oyster shell and seeded
oyster ‘cultch’) at four restoration sites. These sites were selected based on habitat and
restoration suitability in addition to marine habitat mapping.
The proposed four sites and the indicative size of the restoration footprints are:
1) Tewantin (restoration footprint = 2,254m2)
2) Goat Island (restoration footprint = 837m2)
3) Noosa Sound East (restoration footprint = 1,839m2)
4) Noosa Sound West (restoration footprint - 937m2)
These restoration sites are presented below in Figure 1.
Page 43 of 96
Section 44
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Figure 1 Location of proposed restoration sites (the Tewantin and Goat Island sites are within the Main
Channel Restoration Zone and the Noosa Sound West and East sites are within the Noosa Sound
Restoration Zone)
Figure 2 - Tewantin Site
Page 44 of 96
Section 45
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Figure 3 - Goat Island Site
Figure 4 - Noosa Sound East Site
Page 45 of 96
Section 46
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Figure 5: - Noosa Sound West Site
The proposed restoration sites have been subject to the following assessments and studies:
a) Bathymetric mapping
b) Marine and intertidal habitat mapping
c) River user analysis
d) Habitat suitability modelling
e) Restoration suitability modelling
f) Community consultation
g) Detailed site engineering
These assessments/reports were submitted by the applicant as part of the application and
where relevant have been reviewed by Marine Approval Specialists as part of the
Assessment Manager Development Assessment process.
The applicant has also submitted a comprehensive Project Restoration Plan and this is
included as Attachment 2 to this report.
The application material includes a range of environmental management and monitoring
commitments, primarily documented in the Noosa Oyster Ecosystem Restoration Project -
Project Restoration Plan. These management and monitoring commitments include:
- Installation of signage and aids to navigation to ensure public safety and safe passage
of vessels
- Minimising or completely avoiding impacts to intertidal vegetation (mangroves and
saltmarshes) and seabed vegetation (seagrass and macroalgae)
- Avoiding impacts to or buffering of existing tidal works
- Development of a Monitoring, Evaluation and Reporting (MER) System
- Development of a Construction Environmental Management Plan (CEMP)
Page 46 of 96
Section 47
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
7. ASSESSMENT
7.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
State Planning Policy;
South East Queensland Regional Plan;
Coastal Protection and Management Regulation 2017; and Noosa Plan 2020.
State Planning Policy
The Noosa Plan 2020 is generally consistent with the State Planning Policy July 2017 (SPP)
and the SPP raises no further issues relevant to the proposed development.
South East Queensland (SEQ) Regional Plan
The site is located within the Rural Living Area of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.
Planning Regulation 2017
The site is broadly identified as a Koala Priority Area. As the sites are in tidal areas and there
will be no clearing of Koala habitat trees to allow the proposed development, this does not
require further consideration.
7.2. Noosa Plan 2020
The following codes from the Noosa Plan 2020 are applicable to this development:
Noosaville Local Plan Code
Waterways Works Code
The proposed works are identified as consistent with the scheme and are required to follow
a code assessable application process.
7.3. Coastal Protection and Management Regulation 2017
The Coastal Protection and Management Regulation 2017 also applies to prescribed tidal
works in a local government tidal area. The Project therefore requires assessment against
Schedule 3 Code for Assessable Development that is prescribed tidal works.
The proposed works are identified as consistent with the regulation and are required to follow
a code assessable application process.
7.4. Assessment
The attached report was prepared by Marine Approval Specialists to provide an assessment
of the Project (OPW22/0029) against the Noosa Plan 2020 and the Coastal Protection &
Management Regulation 2017. Background information provided to Marine Approval
Specialists included all applicant material submitted to Council as the Assessment Manager.
An assessment of relevant codes of the Noosa Plan 2020 and the Coastal Protection &
Management Regulation 2017 was completed. The assessment found that the Project
satisfactorily complies with relevant codes and recommends that the Project is approved
subject to conditions.
The Code for Assessable Development that is Prescribed Tidal works is the primary
instrument for assessing the proposed works. The Project demonstrates compliance with the
code by:
Proposing habitat restoration works that are compatible with the character and amenity
of the Noosa River and surrounds;
Installing signage and navigation aids consistent with MSQ requirements;
Page 47 of 96
Section 48
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Completely avoiding disturbance to intertidal vegetation (mangroves and saltmarshes)
and minimising impacts to seabed vegetation including seagrass beds and
macroalgae;
Buffering of mangroves, including pneumatophores by 2m and seagrass beds by 10m;
Providing for ongoing public access to the foreshore, including at the proposed load-
out site at Noosaville;
Allowing for the safe passage of vessels at all tides through careful consideration of
gaps between restored reef habitats;
Engineering rock substrates in accordance with applicable standards, assured by an
RPEQ;
Buffering existing tidal works (e.g. jetties) by at least 30m;
Generally improving the stability of the seabed at the restoration sites, and monitoring
changes to the seabed and banks to ensure potential impacts are detected and
managed;
Using construction materials which are clearly compatible with the marine environment;
and
Minimisation and monitoring of seabed sediment disturbance as a result of the
proposed works.
The application material includes a range of environmental management and monitoring
commitments, primarily documented in the Noosa Oyster Ecosystem Restoration Project -
Project Restoration Plan. These measures should be consolidated in a Construction
Environmental Management Plan (CEMP).
Consultation
External Consultation - Community & Stakeholder
Since February 2020, the project team has met face-to-face with over 70 Noosa stakeholder
groups and including local recreational and active commercial fishers, tourism and
recreational groups and Noosa Council approved indigenous representatives to discuss the
project and to present the proposed restoration sites. The overwhelming feedback from these
meetings was supportive.
The Project also requires referral to the State Assessment and Referral Agency (SARA)
given that the following State referral triggers under the Planning Regulation 2017 are
relevant:
- Part 6 – Declared Fish Habitat Area and Marine Plants
- Part 17 – Tidal Works or Works in a Coastal Management District
The applicant referred the application to SARA on 10 February 2022 and subsequently SARA
approved the application (subject to conditions) on 7 April 2022. The SARA conditions
primarily relate to (but are not limited to) the following matters:
- ensuring works are undertaken in accordance with approved design drawings and
relevant engineering and environmental standards
- ensuring relevant notifications to State agencies are completed
- ensuring appropriate signage, navigation markers and work boundary markers are
deployed
- ensuring that any impacts to MSES (marine plants) are temporary and are restored
upon completion of works
- development and implementation of an Inspection and Monitoring program
Page 48 of 96
Section 49
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Internal Consultation
The application was referred internally to Council’s Environmental Services Manager (Acting)
who noted that the proposal was consistent with the documented partnership with The Nature
Conservancy, and comprehensive information has been provided in the technical reports and
restoration plan, no further information was required. It was also supported that the detailed
assessment of the application would be referred externally to provide objective and qualified
assessment.
8. CONCLUSION & REASONS FOR DECISION
The Project has been assessed as compliant with all relevant Codes of the Noosa Plan 2020
and the Coastal Protection and Management Regulation 2017.
The application material includes a range of comprehensive environmental management and
monitoring commitments, primarily documented in the Noosa Oyster Ecosystem Restoration
Project - Project Restoration Plan. These measures should be consolidated in a Construction
Environmental Management Plan (CEMP). We note that this has not been conditioned by
referral agencies. It is recommended that Noosa Council include a condition to capture this
requirement as an important component of the construction process.
It is therefore recommended that the application be approved subject to the Referral Agency
Conditions provided by SARA on 7 April 2022 and the Conditions provided above.
Departments/Sections Consulted:
Chief Executive Officer Community Services Corporate Services
Executive Support Director Director
Community Development Financial Services
Community Facilities Fleet
Libraries & Galleries ICT
Local Laws Procurement
Waste & Environmental Health Property
Revenue Services
Executive Services x Environment & Sustainable Development Infrastructure Services
Director Director Director
Community Engagement Building & Plumbing Services Asset Management
Customer Service x Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture x Environmental Services Disaster Management
Strategic Land Use Planning Infrastructure Planning,
Design and Delivery
Page 49 of 96
Section 50
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
8 FINANCIAL PERFORMANCE REPORT – APRIL 2022
Author Financial Services Manager (Acting), Pauline Coles
Corporate Services Department
Index ECM/ Subject / 22.09 – Monthly Financial Performance Report
Attachments 1. Statement of Income and Expenditure (Profit & Loss and
Capital)
2. Statement of Financial Position
3. Statement of Cash Flows
4. Summary of Materials and Services Expenditure
EXECUTIVE SUMMARY
Year-to-date (YTD) performance against current budget as at 30 April 2022 is positive with
operating revenues outperforming forecast and operating expenditure below budget. Capital
revenues are above forecast with capital expenditure behind budget due to impacts on
project delivery from the recent flood event and resource and supply chain delays.
YTD Financial Performance Summary
Budget Actual Variance Variance
Status
$m $m $m %
Above
Operating Revenue $103.4 $108.1 $4.7 4.6%
Budget
Operating Expense $86.9 $85.9 $0.9 1.1% On Track
Operating Position $16.5 $22.1 $5.7 34.4%
Above
Capital Revenue $13.0 $14.1 $1.1 8.3%
Budget
Capital Expenditure* $38.6 $26.1 $12.5 32.3% Below Budget
* Reflects constructed assets and intangibles only (excludes contributed)
Financial statements including Statement of Income & Expenditure, Statement of Financial
Position (balance sheet), and Statement of Cash Flows are included as attachments for
information for Council.
Figure 1: Actual Performance Compared to Budget
$120
$103.4 $108.1
$100
$86.9 $85.9
$80
$60
$40
$20
$-
Operating Revenue Operating Expenditure
YTD Budget ($m) YTD Actual ($m)
Page 50 of 96
Section 51
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Council’s performance against key measures of financial sustainability has been calculated
as at April 2022. These indicators enable the reader to assess Council’s success in managing
its budget, cash and debt as well as undertaking sustainable asset management. The table
below contains a snapshot of a number of key measures, with full detail included in the report.
YTD Measures of Financial Sustainability
Current Actual
Target Status
Budget YTD
Operating Surplus Ratio 0-10% -0.6% 20.5% Above Target
Net Financial Liabilities
Above Target
Ratio <60% -12.7% -44.8%
Cash Cover Ratio 3 months 8.8 months 13 months Above Target
Asset Sustainability Ratio > 90% 130.1% 66.0% Below Target
RECOMMENDATION
That Council note the report by the Financial Services Manager (Acting) to the General
Committee Meeting dated 16 May 2022 outlining April 2022 year to date financial
performance against budget, including changes to the financial performance report with the
inclusion of key financial sustainability indicators.
REPORT
Operating Revenue (YTD Benchmark 83.3%)
Council has received 99% ($108.1 million) of its operating revenue budget ($109.6 million).
Commentary on each revenue category is provided below.
Category Summary Comments
Rates and Levies $74.9 million (100.2%) Waste utility charges $355k above YTD budget
of the annual budget (101.7% or $13.5 million of $13.2 million annual
of $74.8 million has budget earned)
been earned General rate (net of discounts) $103k below YTD
budget (99.9% or $56.1 million of $56.2 million
annual budget earned)
Fees and $7.6 million (93%) of Development assessment fees $192k above
Charges the $8.2 million annual YTD budget (89.0% or $2.1 million of $2.4 million
budget has been annual budget earned)
earned Plumbing application fees $143k above YTD
budget (102.2% or $1.33 million of $1.30 million
annual budget earned)
Property and Facility fees $129k above YTD
budget (105.7% or $431k of $408k annual
budget earned)
Local Laws fees $92.9k above YTD budget
(92.9% or $1.45 million of $1.56 million annual
budget earned)
Building application fees $69k above YTD
budget (86.0% or $737k of $857k annual budget
earned)
Sale of Goods $10.8 million (97%) of Holiday Park sales $608k above YTD budget
and Services the $11.1 million (104.8% or $3.2 million of $3.1 million annual
annual budget has budget earned) – Positive revenue variances
been received
Page 51 of 96
Section 52
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Category Summary Comments
that hold through the financial year will be offset
in part by additional variable operating costs
Waste management sale of recoverable
materials $521k above YTD budget (132.4% or
$1.5 million of $1.1 million annual budget
earned)
Waste disposal fees $137k above YTD budget
(86.3% or $3.4 million of $4.0 million annual
budget earned)
Noosa Aquatic Centre revenue $89k above YTD
budget (91.5% or $1.6 million of $1.7 million
annual budget earned)
Interest $630k (94%) of the Interest revenues on cash invested will need
Received $670k annual budget ongoing monitoring to ensure returns on surplus
has been earned funds are maximised as investment rates begin
to increase.
Other Revenue $2.4m (77%) of the Waste sulo bin recoveries from Cleanaway
$3.1 million annual below YTD budget $125k (27.82% or $63k of
budget has been $226k annual budget earned) – correlates to
earned lower sulo bin purchases
Holiday Park electricity recoupment below YTD
budget $98k. No revenue recouped YTD due to
supplier delays from COVID. Works have now
commenced, and project is in implementation
phase.
Unbudgeted insurance proceeds received $52k
Operating $7.9 million (133%) of $1.4m in Community resilience and disaster
Grants, the $5.9 million annual management grants have been received in
Subsidies budget has been respect to the recent flood event. These funds
received have been recorded as operational grants until
the program of works has been finalised.
Council received $392k from the Black Summer
Bushfire Recovery Grant program for building
bushfire resilience through technology
innovation with $167k allocated for operational
projects.
75% of the 2023 financial assistance grant was
prepaid in April 2022. Historically only 50% of
this grant is prepaid in June so this may impact
on Council’s 2022/23 final operating position if
the prepayment approach is discontinued by the
Australian government.
Unitywater On track Unitywater distributions are fixed each year so
Distributions little budget variance risk
Page 52 of 96
Section 53
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Figure 2: Operating Revenue Position by Type (Excluding Rates)
Operating Expenditure (YTD Benchmark 83.3%)
Actual operating expenditure is currently 78% ($85.9 million) of full year budget ($110.1
million). Detailed commentary for each expenditure category is provided below.
Category Summary Comments
Employee Costs $29.6 million (78%) of YTD under expenditure for permanent staff
the annual budget of salaries and wages ($3.03 million) due to
$38.1 million has been position vacancies, partially offset by additional
expended spend on casual staff and external labour hire
($1.3 million).
Training costs $116k below YTD budget
(36.19% or $120k of $332k annual budget
spent)
Materials and $38.9 million (76%) of Environment Services costs $455k below YTD
Services the $51.1 million annual budget (39.9% or $1.43 million of $3.6 million
budget has been annual budget spent) – COVID-19 impacts on
expended. staff have delayed project delivery YTD.
Economic Development $255k below YTD
budget (87.76% or $3.0 million of $3.5 million
annual budget spent)
Beaches and Canals $147k below YTD budget
(30.5% or $272k of $891k annual budget
spent)
Holiday Parks $544k above YTD budget
(113.5% or $1.9 million of $1.67 million annual
budget spent) – offset by additional revenue.
Libraries & Galleries $159k below YTD budget
(59% or $1 million of $1.8 million annual
budget spent) – timing of heritage programs
and operational contract services
Waste Management $99k below YTD budget
(82.3% or $9.3 million of $11.3 million annual
budget spent)
Civil Operations $305k above YTD budget
(82.7% or $2.6 million of $3.1 million annual
budget spent). This variance relates
predominately to flood remediation works
undertaken to date and will be funded via
disaster recovery grants.
Page 53 of 96
Section 54
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Category Summary Comments
Finance Costs On track Nil
Depreciation On track Nil
Other Expenses On track Nil
Figure 3: Operating Expenditure Position by Type
$45.0
$39.0 $38.9 YTD Budget ($m)
$40.0
YTD Actual ($m)
$35.0
$30.4 $29.6
$30.0
$25.0
$20.0 $16.3 $16.3
$15.0
$10.0
$5.0 $0.9 $0.9 $0.2 $0.2
$0.0
Finance Costs
Materials
Depreciation
Employees
Other
Tourism and Economic Development Investment Summary
Council resolved to report on a monthly basis, investment details for tourism and economic
development. Expenditure at 30 April 2022 is outlined below:
Expenditure Annual Budget YTD Budget YTD Actual YTD Variance
$m $m $m
Payment to Tourism Noosa $2.52 $2.52 $2.52 -
Economic Development $1.06 $0.84 $0.53 $0.31
Total $3.58 $3.36 $3.05 $0.31
All instalments payable under the Tourism Noosa agreement for the 2021-22 financial year
have been made. Note, the current agreement which was due for renewal at 30 June 2022,
has been extended for a further 12 months.
YTD Economic Development expenditure is below budget due to lower employee costs
($78k), due the Branch Manager acting as Director of Environment & Sustainable
Development for part of the financial year and vacancies in the branch. This has also
impacted timing for delivery of initiatives under the Local Economic Plan ($192k).
Tourism and economic development activity is funded through the general rate, with 5.8% of
the annual general rate committed towards tourism and economic development. Should
actual general rate revenue fall below budget, this does not impact Council’s contractual
commitment to fully fund all tourism and economic development activity. Any general rate
revenue shortfall is funded through other general revenue sources to ensure all planned
activities are undertaken in full.
Disaster Recovery Works
Council continues to assess the remediation works resulting from the February 2022 flood
event. To date Council has incurred $631k in costs associated with the counter disaster
operations and immediate emergent works with a further $190k in commitments.
Page 54 of 96
Section 55
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
An external contractor has been engaged to assess and quantify the damage to infrastructure
and other Council assets and we are yet to receive their report outlining the works required.
$1.4 million in disaster recovery funding has been received to date and additional funding
will be sought once assessments are completed and the program of works finalised.
Capital Revenue
YTD capital revenue of $14.1 million received comprises cash contributions from developers
($1.9 million) and capital grants ($11.5 million). Note that the timing of capital grant receipts
are generally dependent on the timing of grant conditions and also capital delivery
performance, and that the timing of the receipt of developer contributions (both cash and
contributed) is unpredictable.
Figure 4: Capital Revenue by Type
$14.0
$11.5 YTD Budget ($m)
$12.0 $10.3
YTD Actual ($m)
$10.0
$8.0
$6.0
$4.0
$1.4 $1.9
$2.0 $1.3 $0.7
$0.0
Contributions
Subsidies
Contributed
Grants /
Assets
Cash
Capital Program
Actual capital expenditure (excluding commitments) is $26.1 million (YTD budget $38.6
million). Detailed discussion of progress in the delivery of the capital works program is
provided through a separate quarterly report by the Asset Planning Manager.
Figure 5: Capital Program Delivery Performance
$40.0
$34.0
$35.0 YTD Budget ($m)
$30.0 YTD Actual ($m)
$25.0 $23.0
$20.0
$15.0
$10.0
$5.0 $3.4 $1.9
$1.3 $1.3
$0.0
Capital works Other capital Loan redemption
Page 55 of 96
Section 56
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Cash Management and Investment Performance
Total cash on hand at the end of April was $97.2 million. Included in this balance are funds
held in trust and for restricted purposes (e.g. unexpended levy and grant funds), prepaid
grants including the financial assistance grant and other capital works grants, January rates
payments received, and unspent monies committed for funding capital projects which are
underway and will continue during the financial year.
The following pie charts present the mix of cash held at April 2022 by agency (graph on the
left) and by credit risk rating (graph on the right). All funds have been invested in accordance
with the Investment Policy and in consideration of the principles of ethical investment,
preservation of capital, return on investment and counterparty thresholds.
Figure 6: Closing Cash Held by Agency and Credit Rating
CBA
3% A1 +
(Commercial…
QTC A1 +
97% (Q…
The following chart monitors the 12 month trend on total cash and the agencies invested.
Payments received in February from bi-annual rates generated a significant increase in cash,
which have and will be invested in short term QTC deposits in line with Council’s Investment
Policy. The QTC cash rate currently offers the best available short term investment rate
when compared to rates being offered by the commercial institutions.
Figure 7: 12 Month Trend of Cash Invested by Agency
120,000,000
100,000,000
80,000,000
60,000,000
40,000,000
20,000,000
-
May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22 Apr-22
Bendigo TD Westpac TD NAB TD Suncorp TD CBA TD QTC CBA Operating
Page 56 of 96
Section 57
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Measures of Financial Sustainability
The following table incorporates a set of financial sustainability indicators to further assist in
managing Council financial performance. There are no current emerging risks regarding
performance noting the early stage of the financial year.
Category Comments
Operating Surplus Ratio Intent: Identifies the extent
to which revenues cover
operational expenses, to
ensure community equity is
not degraded
Target: 0 – 10%
Result: 20.5%
Comment: This ratio will
slowly decline as
expenditure on operations
occurs through to the end of
the financial year at 30 June
2022.
Cash Expense Cover Intent: Indicates how long
council can continue paying
its day-to-day expenses
from cash at bank without
needing additional cash
flows
Target: > 3 months
Result: 13.0 months
Comment: Council is
forecast to remain above
target for the financial year.
Business as usual
expenditure through to 30
June 2022 will continue to
diminish Council’s cash
holdings, albeit not below
the target range of 3 – 6
months.
Page 57 of 96
Section 58
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Category Comments
Asset Sustainability Ratio Intent: Measures the extent
to which assets are being
replaced as their condition
degrades to ensure service
potential is maintained
Target: 90% of depreciation
budget spent on renewals
annually
Result: Below budget
Comment: The capital
works program has been
impacted by flood events
and ongoing supply chain
issues which has result in
delays in the delivery of the
capital program. This ratio
will continue to increase
each month as expenditure
on renewals continues
however it may fall short of
the target as at 30 June
2022.
Net Financial Liabilities Ratio Intent: Outlines the level
that net Council debt can be
serviced by operating
revenues. A ratio below
zero implies that liabilities
are less than cash (and
other current assets) and
there is adequate borrowing
capacity available if
needed.
Target: less than 60%
Result: -45%
Comment: Council has low
debt levels and strong cash
holdings.
Page 58 of 96
The text continues on section 59.