Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2022-05-16 General Committee Meeting Agenda

of 96

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2022




                                   Page 35 of 96

<9
go
a2
8
43                                  LOSS ds                                                                                                                                                               G
49
 y=         NOTES:
@ Sy | 1. ALLLOWVOLTAGE AND ELECTRICAL INSTALLATION                                                                 SIREN LATON TO
   N          SHALL BE IN ACCORDANCE WITH THESE SPECIFICATION,                                                      Re RTA co aa GARTOS
Gs            TELSTRA CIVIL DESIGN MANUAL, TELSTRA EARTHING                                                         TEEECWER WOR
 78           MANUAL, ALL REFERENCED TELSTRA STANDARD                                                   S2AMP
4=            DOCUMENTATION ALONG WITH ASINZS3000, ASINZS3008,       BY TELEPOWER
tS            ‘ASINZS3015, ASINZS3017, ASINZS1768, AS/ACIF $006,     ~----------- fe
9             RELEVANT STATE/TERRITORY SPECIFIC INSTALLATION                                                        PROPOSED 2C+E 10mm MAINS.
              RULES AND ALL OTHER RELEVANT AUSTRALIAN               BY SAN TEAM                                     APPROX. CABLE RUN 40m
c             STANDARDS AS APPLICABLE TO PROPOSED WORKS,
            2. ALLLOW VOLTAGE AC POWER WORKS SHALL BE
              COMPLETED BY LICENSED ELECTRICIAN IN                                                                  PROVIDE AN EXTERNAL LEAVER TO
              ACCORDANCE WITH INSTALLATION RULES AND                 PTO IA gaaV TaROLE TTT                         ALLOW DISCONNECTION OF THIS MAIN     SETA EELC On INERT TORALLY
              RELEVANT SAFETY PRACTICES APPLICABLE TO SITE.          \        CONE                              |   SWITCH, WITHOUT OPENING THE
                                                                     | DISTRIBUTION BOARD                       '                                        MOUNTED ENCLOSURE ON THE H-FRAME
            3. ALL WORKS SHALL BE LIAISED AND COORDINATED WITH       | 1P66 RATED. LOCKABLE.                    |   DISTRIBUTION BOARD                   ADJACENT TO DISTRIBUTION BOARD
              RELEVANT PERSONNEL, SITE REPRESENTATIVES,              I                                   O0A1PH |
              LANDOWNER, SITE PROVIDER AND/OR POWER                  |                                  ISOLATOR}                                       [ra----- 22    $=         === == ===      == 5
              AUTHORITY AS APPLICABLE.                               |                                          \                                       |                                                |
            4. ALL WORKS SHALL BE AS PER TELSTRA SPECIFICATIONS      |                                     32a |                                        !
              AND APPROVED MOPS INCLUDING LABELLING,                 |  Tom    aan          SPARE          MCB 1—SURGE PROTECTION DEVICE                !
            5, CONTRACTOR SHALL MAKE THEMSELVES AWARE OF ALL         t                    SPACES                {WITH FAIL INDICATION                   \
              SITE CONDITIONS AND SAFETY REQUIREMENTS PRIOR          |,  RGBO\  ROBO                            !                                       I                                                i
              TO COMMENCING ANY WORK ON SITE,                        ! ah   As                                  !                                       |                                                |
            6. CONTRACTOR TO VALIDATE ALL APPROVALS AND              | power Lt POWER                                                                   !                                                1
              OUTAGES REQUIRED TO CONDUCT PROPOSED WORKS.            | ourier    Loumet                         {                                       i
    c         THIS INCLUDES BUT IS NOT LIMITED TO ANY DONOR          eo            eauemesweemecewee              yee ee                                I                                                |             Ic
              SITES ANDIOR FAR END SITES WHICH MAY BE IMPACTED                                                     |                        |           |                                                '
              DUE TO PROPOSED WORKS.                                                        POWERPLUG              1                        1           !                                                \
            7. ALL CONTRACTORS WORKING ON TELSTRA FACILITIES                                {AUSTRALIAN STANDARD)  I                        I           L..   -b------------------------4-4-+--J
              SHALL BE TELSTRA ACCREDITED AS PER TELSTRA                                                           |                        | MFR.AC                       SATELLITE DISH
             PROTOCOLS.                                                                                            | peer neneeeenee        | POWER CABLE                    ANTENNA
K       |]  & ALLLVCABLES SHALL BE INSTALLED IN CONDUITS. ANY                                                      ie          POU        Eu)                              (XCVR, HP BUC,                              y
              EXPOSED CONDUITS SHALL BE UV PROTECTED.                                                              1%     POWER SUPPLY                                       LNB & FEED)
            9. NO SEPARATE METERING IS REQUIRED FOR SAN                                       FR,ACPOWERCABLE =    |L--~-------------| | mR DC                                                             MFR.DC
              INSTALLATION UNLESS SPECIFIED AND DIRECTED BY                                                        [ramones ao" | BOWER CABLE                                                              POWER GAZE
              TELIA                                                                                                          FIBER
            40. NEUTRAL AND ELECTRICAL SAFETY EARTH FOR SAN                                                        TE    n SUPE |                                                                          MFR. DC
              INSTALLATION SHALL BE TAKEN FROM EXCHANGE                                                                                                                  WRT                               POWER CABLE
              EXISTING MEN.                                                                 CONDUIT W/             |                        |                            wey
                                                                                            FIBER                  !                        !                     ee
                                                                                                                                                              [                                 |
                                                                                             corr
                                                                                             noo                                ee
                                                                                                                           OAN CABINET                        |                                   i
                                                                                             i     \              (CABLE MANAGEMENT HOOD/AC UNIT              |                                   \
                                                                                             Lege                     NOT SHOWN FOR CLARITY)                  \
                                                                                         FIBER INTERFACE    \—MFR, AC DATA CABLE                               “ELECTRONICS”
                                                                                           nt eo                                                                            ENCLOSURE
                                                                                                          AC POWER CONNECTION
                                                                                                           NOT TO SCALE                                                          FOR CONSTRUCTION
                                                                                                           FOR SITE SPECIFIC NOTES REFER TO SHEET 0,
                                                                                                          (onneR [DRAWN] CHRD]         AMENDWENT          | EXAM | APD | DATE _[K8)
                                                                                                           7183929        FOR CONSTRUCTION -SPSNSDASTWOOTEDOWN- SATELLITE 18.06.21         €el stra
                                                                            “OMPLIANCE BOX                                                                                     SATELLITE ACCESS NODE SITE 183929
                                                                                               hd                                                                                       POMONA EXCHANGE
                                                                         COMPLETED AS PER DESIGN     [_]                                                                                 AC POWER CONNECTION            F
                                                                          re           IN RED        O                                                                             25 RAILWAY PARADE, POMONA, QLD 4568
                                                                        seus                oe           [ CratecapeeintnreN TES Migrant                                     sd        QC 100259
                 PBN ZS                                                                                                                                                                Gad fer QCT00259.dwy            A
 The copyright and ownership of hiv drewing iv eesigned fo Tetrire and must not be copied or served skeewhare without writen permiesion from Teter.

                                                                                                                            Page 35 of 96
Log in to download the original file

2022-05-16 General Committee Meeting Agenda(PDF, 18MB).pdf · 18.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.