Proposed Residential Development at Doonella - Stage C
5.0 CONCLUSIONS
This Flood Investigation and Stormwater Quantity Management Plan has been prepared to support the Development
Application for Stage C of the proposed ‘Doonella’ residential subdivision at Beckmans Road Noosaville.
The report has addressed the management of peak flow increases generated by the site development and flooding
within the proposed environmental corridor.
The outcomes of these investigations are as follows:
• Hydrological modelling has determined that without mitigation, peak flows at the downstream site boundary
will increase as a result of the proposed development;
• A management strategy is proposed to mitigate the increase in peak flows. Designs for two detention
storages, being the embankment across the environmental corridor to form the Dodonaea Road crossing and
the Bio-Retention Basin at the lower end of Twigrush Court, have been modelled. The results indicate the two
detention storages will reduce peak flows to existing values at the site boundary.
• Using peak flows for the 100 year ARI event (determined as part of the hydrological analysis) flood levels and
extents within the environmental corridor within and downstream of the site have been determined. The
modelling results indicate that more than sufficient freeboard will be provided to proposed allotments.
Furthermore the limited depth and velocity of flows overtopping the Dodonaea Close crossing will ensure it is
trafficable during the 100 year ARI event.
6.0 RECOMMENDATIONS
It is recommended that this Flood Investigation and Stormwater Quantity Management Plan be approved and the
strategies within be incorporated into detailed design. Detailed design and construction drawings are to be undertaken
and submitted with the Operational Works application. Detailed design may result in changes to the proposed
management strategies but the design objectives will be maintained.
B09182.W-02A Page 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.