Flood Investigation & Stormwater Quantity Management Plan

Attached to the e-mail Doonella Stage C (Email 4 of 7) IDAS Forms 1 & 6 and Flood Investigation - OPW14/0197.

of 43

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Flood Investigation & Stormwater Quantity Management Plan
Proposed Residential Development at Doonella - Stage C


5.0 CONCLUSIONS
This Flood Investigation and Stormwater Quantity Management Plan has been prepared to support the Development
Application for Stage C of the proposed ‘Doonella’ residential subdivision at Beckmans Road Noosaville.
The report has addressed the management of peak flow increases generated by the site development and flooding
within the proposed environmental corridor.
The outcomes of these investigations are as follows:
    •    Hydrological modelling has determined that without mitigation, peak flows at the downstream site boundary
         will increase as a result of the proposed development;
    •    A management strategy is proposed to mitigate the increase in peak flows. Designs for two detention
         storages, being the embankment across the environmental corridor to form the Dodonaea Road crossing and
         the Bio-Retention Basin at the lower end of Twigrush Court, have been modelled. The results indicate the two
         detention storages will reduce peak flows to existing values at the site boundary.
    •    Using peak flows for the 100 year ARI event (determined as part of the hydrological analysis) flood levels and
         extents within the environmental corridor within and downstream of the site have been determined. The
         modelling results indicate that more than sufficient freeboard will be provided to proposed allotments.
         Furthermore the limited depth and velocity of flows overtopping the Dodonaea Close crossing will ensure it is
         trafficable during the 100 year ARI event.

6.0 RECOMMENDATIONS
It is recommended that this Flood Investigation and Stormwater Quantity Management Plan be approved and the
strategies within be incorporated into detailed design. Detailed design and construction drawings are to be undertaken
and submitted with the Operational Works application. Detailed design may result in changes to the proposed
management strategies but the design objectives will be maintained.




B09182.W-02A                                                                                                     Page 11
Log in to download the original file

Flood Investigation & Stormwater Quantity Management Plan.pdf · 3.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.