Flood Investigation & Stormwater Quantity Management Plan

Attached to the e-mail Doonella Stage C (Email 4 of 7) IDAS Forms 1 & 6 and Flood Investigation - OPW14/0197.

of 43

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
A: QUEENSLAND RATIONAL METHOD CALCULATIONS - CALIBRATION OF WBNM
File:        H:\B09\150-199\B09182.W\Stormwater\[B09182.W RM.xls]Calibration Model
Date:        29/10/2011
Job:         B09182.W
By:          MS
Locality:    NSC Coastal
IFD Ref:     IFD_NSC Coastal
IFD Source:  Derived from Noosa Shire Council Rainfall Intensity Curves Coastal (to Foothills) STD. DRG. 9231 (1991)Bureau of Meteorology Chart Noosa Heads (1987)
TIME OF CONCENTRATION CALCULATIONS As per Section 4.06.3 QUDM Method (c) Bushland Catchments too small to allow the formation of a creek with defined bed and banks.
                                                                                                                   Pipe
                                                                                                       Se Slope Diameter Velocity Wetted Area Wetted Perimeter
                                                                                                                                             2
Equation Type / Method                                                     Area (ha)     Length (km)      (%)      (mm)       (m/s)        (m )           (m)      Manning's n Chez's Coeff tc (min)
                                                                             9.38

Equation 4.06 QUDM - Friends Equation for Overland Sheet Flow                            0.12        7.00                                                             0.1                      36

Adopted concentrated flow velocity                                                       0.369                              1                                                                  6
                                                                                                                                                                                  Total        42

                                                                                                                                                                               Adopted tc      42      min
C10 VALUE
                                                                                     1
                              Development Category                          fi       I10 (mm/hr)                                                     C10
Enter Fraction Impervious                                                 0.00            73                                                         0.70
Table 5.04.2 QUDM
                                                                                                                                    Adopted C10      0.70

FLOW CALCULATIONS
Equation 4.01 QUDM - Queensland Rational Method
                                                                                         Adopted Time of Concentration      42
                                                                                                      tc
                                                                          ARI             Cy            Iy    A (ha)     Q (m3/s)
                                                                           2             0.60         63       9.38       0.98
                                                                           5             0.67         78       9.38       1.36
                                                                           10            0.70         88       9.38       1.61
                                                                           20            0.74        100       9.38       1.92
                                                                           50            0.81        121       9.38       2.53
                                                                          100            0.84        130       9.38       2.85
Log in to download the original file

Flood Investigation & Stormwater Quantity Management Plan.pdf · 3.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.