Flood Investigation & Stormwater Quantity Management Plan

Attached to the e-mail Doonella Stage C (Email 4 of 7) IDAS Forms 1 & 6 and Flood Investigation - OPW14/0197.

of 43

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
   Flood Investigation & Stormwater Quantity Management Plan
   Proposed Residential Development at Doonella - Stage C

   C2:      HEC RAS Results Table for 100 Year ARI (Mitigated Scenario Flows)
100 YEAR ARI RESULTS - PLAN 02 - MS Revision

 River                Min Ch       W.S.       Crit       E.G.   Vel        Vel     Vel     Vel    Flow    Froude #
  Sta      Q Total      El         Elev       W.S.       Elev   Left      Chnl    Right   Total   Area       XS
           (m3/s)       (m)        (m)        (m)        (m)    (m/s)     (m/s)   (m/s)   (m/s)   (m2)
  348        1.07      13.88      14.29      14.16      14.31             0.51            0.51      2.1     10.12

  308        1.07      12.03      12.32      12.32       12.4              1.2             1.2      0.9      6.09

  274        1.38       10.8      12.03      11.13      12.03   0.02       0.1    0.03    0.09    14.66     24.12

  252        1.38       9.97      12.03      10.15      12.03   0.03      0.03    0.03    0.03    42.62     37.07

  234        1.38       9.26      12.03       9.52      12.03   0.02      0.02    0.02    0.02    75.49     48.85

  220    Culvert

  213        1.38       8.56       8.92       8.72       8.93             0.41            0.41     3.33     12.19

  198        3.11        8.2       8.66        8.5       8.69             0.69    0.32    0.69     4.53     15.12

  166        3.11       7.54       7.81       7.74       7.83   0.57      0.62    0.77    0.63     4.92     25.84

  141        3.11       7.11       7.77       7.34       7.77   0.29      0.19    0.17    0.21    14.89     32.86

  121        3.11       6.99       7.75       7.24       7.75   0.35      0.15    0.02    0.22    14.11     28.59

  101        3.11          7       7.73       7.33       7.74   0.48       0.2            0.32     9.85     24.47

   90        3.11        6.4       7.73        6.8       7.73   0.12      0.11    0.14    0.12    26.46     37.79

   75    Culvert

   60        5.18       6.07        7.6       6.35        7.6   0.14      0.12    0.16    0.13    40.71     37.87




100 YEAR ARI RESULTS FOR SENSITIVITY CHECK (n=0.15) - PLAN 03 - MS sens

 River                Min Ch       W.S.       Crit       E.G.   Vel        Vel     Vel     Vel    Flow    Froude #
  Sta      Q Total      El         Elev       W.S.       Elev   Left      Chnl    Right   Total   Area       XS
           (m3/s)       (m)        (m)        (m)        (m)    (m/s)     (m/s)   (m/s)   (m/s)   (m2)
  348        1.07      13.88      14.38      14.16      14.38             0.35            0.35     3.03     12.16

  308        1.07      12.03      12.32      12.32       12.4              1.2             1.2      0.9      6.09

  274        1.38       10.8      12.03      11.13      12.03   0.02       0.1    0.03    0.09    14.68     24.13

  252        1.38       9.97      12.03      10.15      12.03   0.02      0.04    0.02    0.03    42.62     37.07

  234        1.38       9.26      12.03       9.52      12.03   0.01      0.02    0.01    0.02    75.49     48.85

  220    Culvert

  213        1.38       8.56       9.02       8.72       9.02              0.3             0.3     4.56     13.58

  198        3.11        8.2        8.7        8.5       8.72             0.62    0.18    0.62     5.06     15.64

  166        3.11       7.54       7.93       7.74       7.94   0.21      0.41    0.28    0.39     8.01     27.97

  141        3.11       7.11       7.84       7.32       7.84   0.14       0.2    0.09    0.18    17.44     34.95

  121        3.11       6.99       7.81       7.22       7.81   0.22      0.19    0.03     0.2    15.74     29.85

  101        3.11          7       7.74        7.3       7.74   0.34      0.28            0.31     10.1     24.71

   90        3.11        6.4       7.73        6.8       7.73   0.07      0.13    0.08    0.12    26.46     37.79

   75    Culvert

   60        5.18       6.07        7.6       6.32        7.6   0.08      0.14     0.1    0.13    40.71     37.87




   B09182.W-02A


[OCR of page images]
Flood Investigation & Stormwater Quantity Management Plan

Proposed Residential Development at Doonella - Stage C

BROWN

Smart Water

 

C2:

HEC RAS Results Table for 100 Year ARI (Mitigated Scenario Flows)

100 YEAR ARI RESULTS - PLAN 02 - MS Revision

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

River Min Ch W.S. Crit E.G. Vel Vel Vel Vel Flow Froude #
Sta Q Total El Elev W.S. Elev Left Chni Right Total Area xs
(m3/s) (m) (m) (m) (m) (m/s) (m/s) (m/s) (m/s) (m2)
348 1.07 13.88 14.29 14.16 14.31 0.51 0.51 2.1 10.12
308 1.07 12.03 12.32 12.32 12.4 1.2 1.2 0.9 6.09
274 1.38 10.8 12.03 11.13 12.03 0.02 0.1 0.03 0.09 14.66 24.12
252 1.38 9.97 12.03 10.15 12.03 0.03 0.03 0.03 0.03 42.62 37.07
234 1.38 9.26 12.03 9.52 12.03 0.02 0.02 0.02 0.02 75.49 48.85
220 Culvert
213 1.38 8.56 8.92 8.72 8.93 0.41 0.41 3.33 12.19
198 3.11 8.2 8.66 8.5 8.69 0.69 0.32 0.69 4.53 15.12
166 3.11 7.54 7.81 7.74 7.83 0.57 0.62 0.77 0.63 4.92 25.84
141 3.11 7.11 7.77 7.34 7.77 0.29 0.19 0.17 0.21 14.89 32.86
121 3.11 6.99 7.75 7.24 7.75 0.35 0.15 0.02 0.22 14.11 28.59
101 3.11 7 7.73 7.33 7.74 0.48 0.2 0.32 9.85 24.47
90 3.11 6.4 7.73 6.8 7.73 0.12 0.11 0.14 0.12 26.46 37.79
75 Culvert
60 5.18 6.07 7.6 6.35 7.6 0.14 0.12 0.16 0.13 40.71 37.87
100 YEAR ARI RESULTS FOR SENSITIVITY CHECK (n=0.15) - PLAN 03 - MS sens
River Min Ch W.S. Crit E.G. Vel Vel Vel Vel Flow Froude #
Sta Q Total El Elev W.S. Elev Left Chni Right Total Area xs
(m3/s) (m) (m) (m) (m) (m/s) (m/s) (m/s) (m/s) (m2)
348 1.07 13.88 14.38 14.16 14.38 0.35 0.35 3.03 12.16
308 1.07 12.03 12.32 12.32 12.4 1.2 1.2 0.9 6.09
274 1.38 10.8 12.03 11.13 12.03 0.02 0.1 0.03 0.09 14.68 24.13
252 1.38 9.97 12.03 10.15 12.03 0.02 0.04 0.02 0.03 42.62 37.07
234 1.38 9.26 12.03 9.52 12.03 0.01 0.02 0.01 0.02 75.49 48.85
220 Culvert
213 1.38 8.56 9.02 8.72 9.02 0.3 0.3 4.56 13.58
198 3.11 8.2 8.7 8.5 8.72 0.62 0.18 0.62 5.06 15.64
166 3.11 7.54 7.93 7.74 7.94 0.21 0.41 0.28 0.39 8.01 27.97
141 3.11 7.11 7.84 7.32 7.84 0.14 0.2 0.09 0.18 17.44 34.95
121 3.11 6.99 7.81 7.22 7.81 0.22 0.19 0.03 0.2 15.74 29.85
101 3.11 7 7.74 7.3 7.74 0.34 0.28 0.31 10.1 24.71
90 3.11 6.4 7.73 6.8 7.73 0.07 0.13 0.08 0.12 26.46 37.79
75 Culvert
60 5.18 6.07 7.6 6.32 7.6 0.08 0.14 0.1 0.13 40.71 37.87

 

 

 

 

 

 

 

 

 

 

 

 

 

B09182.W-02A

 

 
Log in to download the original file

Flood Investigation & Stormwater Quantity Management Plan.pdf · 3.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.