Skip to the record
Search everything, all in one place.

Original source · versioned page text

Flood Investigation & Stormwater Quantity Management Plan

Attached to the e-mail Doonella Stage C (Email 4 of 7) IDAS Forms 1 & 6 and Flood Investigation - OPW14/0197.

of 43

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 

i |

   
      
      
    
   

'
!
l
1
l
'
! |
'
1
l
'
1

4 TOP OF WEIR

2 RL 9.80m TOP OF EXISTING FILTER MEDIA +”

' wT RL 600M Ly

       

   

|) DETENTION VOLUME
1210m?

 

/ TOP OF FILTER MEDIA
RL 7.50m

 

TOR OF WEIR

BIO-BASIN

4250 5 0 5 10 M1
1500 a 43

900x900 FIELD nm
TOP OF PIT 9.00: =

r—-—7——TOP OF BASIN 9.60
j=——TOP WEIR LEVEL 9.30

 

“|-+——2x225% OUTLET PIPES IL 7.80

 

 

 

TOP OF FILTER MEDIA 7.50m

IL 6.90 525f

 

 

 

 

IL 6.50 SWALE To CULVERT

 

   
 
  
  
   

 

 

 

 

 

 

901
N
450 DIA RCP
U/S IL 9.30 172
D/S IL 9.15
CROSSING HEIGHT
173.
DETENTION VOLUME ”
2520m? | 1
174
175.
CROSSING DETENTION
1500 5 ‘0 20 M1
nn —————s) ,,
LEGEND
ee PROPOSED RETAINING WALL

E> PROPOSED WEIR
Coe PROPOSED FILTER MEDIA (590m?)

PROPOSED ROCK PROTECTION

EXISTING FILTER MEDIA

 

TOP OF BATTER

RETAINING WALL LEVEL

 

 

 

 

 

 

    

 

 

 

 

 

 

  

 

 

TW 9.60 TW = TOP OF WALL, BW = TOP OF FILTER MEDIA
a MAJOR FLOW DIRECTION

SECTION (AY

SCALE1:50
ee, nosa0s-skz6duy DATE: 1-05-2012. THE, 0838 KEY PLAN TOTAL DETENTION VOLUME = 2996m?
Xref's: NO9004-TIT USR: david memillan
FIRST | CALC [DRAWN] DATE DESIGN CHECK SCALE (METRES 1 MICROFILM No. SURVEYOR CLIENT Brown Consulting (QLD) Pty Ltd Engineers & Managers DRAWING TITLE
vee co | co | 20.09.11 AMENOMENT DETAILS, CONICS (SUNSHINE COAST) PTY LTD level 1, 15 Nielin Way, Budding QLD Australia 4575
aja] co | co etiam | ORGNAL ESUE PEP 1 INNOVATION PARKWAY, BIRTINYA STOCKLAND LAKE DOONELLA PTY LTD Telephone 07 5470 9260 Facsimile 07 5470 9262 CONCEPT
Em [co [om [s.r erento vou UPATED AS SHOWN Ph (07) 5436 7888 Fax (07) 5493 6630 — Brsbane CanboraMaboune Syéney Singapore Sunshine Coast BASIN DESIGN
gle DRAWN CHECK PROJECT We, APPROVED BRENT THOMAS 786 QUALITY & QUANTITY
aD ZS Sims LAKE DOONELLA NOOSA ‘CONSULT AUSTRALIA | DRAWING WOMBER ro
iG PEP NO9004 STAGE C
s|F FOR & ON BEHALF OF BROWN CONSULTING (QLD) PTY LTD N09004-SK26 B

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
Log in to download the original file

Flood Investigation & Stormwater Quantity Management Plan.pdf · 3.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.