Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Geotechnical Report

Attached to the e-mail MCU16/0081 Geotechnical report, Landscape Plan, SMP, Traffic report - Email 3 of 3.

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                              EXPLANATION OF NOTES, ABBREVIATIONS & TERMS
                                                                                   USED ON BOREHOLE AND TEST PIT REPORTS
 DRILLING/EXCAVATION METHOD
 AS*        Auger Screwing                                      RD         Rotary blade or drag bit             NQ          Diamond Core - 47 mm
 AD*        Auger Drilling                                      RT         Rotary Tricone bit                   NMLC        Diamond Core - 52 mm
 *V         V-Bit                                               RAB        Rotary Air Blast                     HQ          Diamond Core - 63 mm
 *T         TC-Bit, e.g. ADT                                    RC         Reverse Circulation                  HMLC        Diamond Core – 63mm
 HA         Hand Auger                                          PT         Push Tube                            BH          Tractor Mounted Backhoe
 ADH        Hollow Auger                                        CT         Cable Tool Rig                       EX          Tracked Hydraulic Excavator
 DTC        Diatube Coring                                      JET        Jetting                              EE          Existing Excavation
 WB         Washbore or Bailer                                  NDD        Non-destructive digging              HAND        Excavated by Hand Methods
 PENETRATION/EXCAVATION RESISTANCE
         L             Low resistance. Rapid penetration possible with little effort from the equipment used.
        M              Medium resistance. Excavation/possible at an acceptable rate with moderate effort from the equipment used.
        H              High resistance to penetration/excavation. Further penetration is possible at a slow rate and requires significant
                       effort from the equipment.
        R              Refusal or Practical Refusal. No further progress possible without the risk of damage or unacceptable wear to the
                       digging implement or machine.
 These assessments are subjective and are dependent on many factors including the equipment power, weight, condition of
 excavation or drilling tools, and the experience of the operator.
 WATER
                                 Water level at date shown                                             Partial water loss
                                 Water inflow                                                          Complete water loss
 GROUNDWATER NOT                                    The observation of groundwater, whether present or not, was not possible due to drilling water,
 OBSERVED                                           surface seepage or cave in of the borehole/test pit.
 GROUNDWATER NOT                                    The borehole/test pit was dry soon after excavation. However, groundwater could be present in
 ENCOUNTERED                                        less permeable strata. Inflow may have been observed had the borehole/test pit been left open
                                                    for a longer period.

 SAMPLING AND TESTING
 SPT                                   Standard Penetration Test to AS1289.6.3.1-2004
 4,7,11 N=18                           4,7,11 = Blows per 150mm. N = Blows per 300mm penetration following 150mm seating
 30/80mm                               Where practical refusal occurs, the blows and penetration for that interval are reported
 RW                                    Penetration occurred under the rod weight only
 HW                                    Penetration occurred under the hammer and rod weight only
 HB                                    Hammer double bouncing on anvil
 DS                                    Disturbed sample
 BDS                                   Bulk disturbed sample
 G                                     Gas Sample
 W                                     Water Sample
 FP                                    Field permeability test over section noted
 FV                                    Field vane shear test expressed as uncorrected shear strength (sv = peak value, sr = residual value)
 PID                                   Photoionisation Detector reading in ppm
 PM                                    Pressuremeter test over section noted
 PP                                    Pocket penetrometer test expressed as instrument reading in kPa
 U63                                   Thin walled tube sample - number indicates nominal sample diameter in millimetres
 WPT                                   Water pressure tests
 DCP                                   Dynamic cone penetration test
 CPT                                   Static cone penetration test
 CPTu                                  Static cone penetration test with pore pressure (u) measurement
 Ranking of Visually Observable Contamination and Odour (for specific soil contamination assessment projects)
      R=0            No visible evidence of contamination       R=A          No non-natural odours identified
      R=1            Slight evidence of visible contamination   R=B          Slight non-natural odours identified
      R=2            Visible contamination                      R=C          Moderate non-natural odours identified
      R=3            Significant visible contamination          R=D          Strong non-natural odours identified
 ROCK CORE RECOVERY
  TCR = Total Core Recovery (%)                                      SCR = Solid Core Recovery (%)                     RQD = Rock Quality Designation (%)

    
        Length of core recov ered
                                   100                     
                                                                 Length of cylindrica l core recovered  100      
                                                                                                                        Axial lengths of core  100 mm  100
           Length of core run                                               Length of core run                                Length of core run
                   




Explanation of Notes, Abbreviations & Terms Used on Borehole and Test Pit Reports                                                                  Date: 08/10/2015
FRM-068                                                                                                                                            Ver. 1.01
Log in to download the original file

Geotechnical Report.pdf · 3.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.