Original source · versioned page text
Response - Project Ave
Attached to the e-mail Response to Information Request - MCU18/0162 - 4 Project Avenue, Noosaville.
4 Project Avenue Industry - 320 M²) PROJECT AVENUE R TH 2 Bicycle hoops for (4) Bicycles NO ENTRY (Mezz) over (4) x Scooter Bays FENCE LINE 1 2 3 4 GARDEN 6 7 Gym 115 M² (Ground) + 13 M² (Mezz) = 128 M². 1 2 3 4 5 8 9 PROPERTY BOUNDARY (DRIVE EASMENT) 1 (4) Project Ave - GFA Use to Carpark plan 1 : 200 GFA / CARPARKING RATES - REQUIRED FOR USE AREAS... Carparking Carparking spaces spaces GFA Use Area Total Carpark Rate REQUIRED ACHIEVED Tenant Industry Gym 320m² 128m² } 448m² (4) Project Ave - GFA - Use to 1/ per 50m² GFA Originally provided for when constructed } } (9) Cars Owner Total (8) Parking Spaces + (4) Scooter Parks Allowed for: (8) Carparks + ((4) Motorbike Parks in Lieu of (1)) carpark. = (9) Parks Total THOMAS Surfboards Andrew James St. Baker PO. Box 2459 date drawn by 12.09.2018 X 1.00 A Author A Revised Planning 20.11.2018 2 & 4 Project Ave, Noosaville Carparking Plan Noosa Head Q. 4567 mob: 0488442458 checked by Checker scale @ a3 As indicated no. description date
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.