29. The full length of the Egret Street frontage of the development site shall be upgraded by
providing kerb & channel. All associated and ancillary work including pavement correction to
the existing pavement, drainage works, modification of the footpath, and adjustments to the
existing infrastructure shall be undertaken to complete the frontage widening.
In this regard a specifications and plans detailing this work shall be prepared and submitted to
Council for approval prior to obtaining a Development Permit for Operational Works.
30. All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel,
footpath paving and landscaping such as trees and grasses in accordance with Council’s
Standard specifications prior to commencement of the use permitted by this permit.
Roof Water & Stormwater Drainage
31. Roof Water & Stormwater Drainage of the development shall be generally as shown on
drawing number 1901-2 prepared by Construction Hydraulic and dated 20 March 2008, except
as modified herein.
32. The alignment of the drainage line and the location of the proposed connection manhole shall
be revised such that the direction of flow is consistent with Council’s existing line.
33. The amount of cover over the new drainage lines and the vertical and horizontal clearances to
the existing services in Egret Street shall be in accordance with Council standards or the
relevant authority guidelines. These clearances are to be clearly shown on any plans
submitted for Operational works approval.
34. Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank
(minimum storage 3000 litres per dwelling/unit) that is installed to ensure water from the tank
is used for external uses (such as watering gardens, irrigation, ornamental ponds, water
features, topping-up swimming pools, outdoor cleaning, etc) and for use in flushing of toilets
internal to the dwelling. All rainwater tanks are to be designed and installed in accordance
with the Queensland Development Code (QDC), Part 25 – Rainwater Tanks, and shall be part
of the plumbing application in conjunction with the building approval. The location and
capacity of the tanks shall be clearly shown on the plans submitted for Building Works /
Operational Works approval and any overflow shall be directed to the stormwater drainage
system.
35. All stormwater drainage (including roof water overflow from the rainwater storage system)
shall be collected and discharged so there is no net increase in stormwater runoff from the
site. Stormwater drainage permitted to drain from the site shall be discharged to Council’s
existing drainage structures in Egret Street. Plans of the drainage design shall be prepared by
a Registered Professional Civil Engineer and submitted to Council prior to obtaining a
Development Permit for Operational Works.
36. The retaining walls and fencing proposed along the western boundary of the site shall be
designed and constructed such that they do not impede, concentrate or redirect overland flow
from the adjoining upstream properties onto any adjoining properties or to Council’s pathway.
The type of wall and fencing shall be clearly shown on the plans submitted for Building Works /
Operational Works approval.
37. Deleted.
38. All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
39. The site shall be connected to Council’s existing sewerage reticulation systems and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
5 of 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Decision Notice - 010.2008.00000170.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 306 KB (small file)
- File type
No other editions are linked here.