Council archive · source document
09/0945 - Representations [As Published] · 142009.945
Page 2of 2 Item 6: List of Approved Plans... Representation: An incorrect plan was submitted as part of the original operational works application and the applicant withdraws this plan as it refers the Multi Purpose Hall that was approved under the BER program. In this regard Tod Consulting Engineer Plan 09541 C1 is to be deleted from the approved list of plans. The applicant also requests that the following additional plans be added to the list of approved plans; Middap Ditchfield plans WD-S-01B and Tod Consulting Engineers Plan 09541-C2B and 09541-C2D. The applicant therefore requests that Noosa Council issues a Development Permit for Material Change of Use and a Negotiated Decision Notice which amends and/or deletes those conditions in the original decision notice as detailed above. Please do not hesitate in contacting our Sunshine Coast office if Council requires any further information and/or clarification in relation to these representations. Yours faithfully WL OL, Nadine Gorton Senior Planner Martoo Consulting Pty. Ltd. Enc: 3xA3 Middap Ditchfield plans WD-S-01B 3 x A3 Tod Consulting Engineers Plan 09541-C2B and 09541-C2D.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0945 - Representations [As Published]Related documentApplication case desk ↗
About this file
- File size
- 507 KB (small file)
- File type
No other editions are linked here.