Decision Notice - Change to an Existing Approval - 010.2006.00002159.002 [As Published] · 142006.2159.02
2006/2159
2. The applicant shall obtain approval of the revised site plan, drawing No 06/148-1 Issue D, from
Marine Safety Queensland prior to the commencement of the construction of the jetty.
3. Structures should be designed and constructed such that they are free standing within the
waterway and are not connected to or behind the revetment wall or rock wall.
4. A rigid handrail shall be fitted on one side of the walkway.
5. No posts or vertical supports of the proposed jetty are to extend vertically from the structure
unless they provide support for the handrail.
6. No boatlifting devices are to be attached or moored at the jetty structure for the purpose of
elevating a vessel above the water without Council approval.
7. The jetty shall be constructed in a manner to render the underside area vermin proof.
8. There shall be no electrical reticulation system carrying electricity in excess of 24 volts beyond
the revetment wall.
9. Lighting associated with the use shall be designed, installed, operated, and maintained in
accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
10. The jetty is to be used for private purposes only with no commercial operations are to be
undertaken.
11. Boat repair activities will not be permitted on site.
12. Wastewater and sullage shall only be disposed of at approved pumpout facilities.
13. The mooring facility shall not be utilised for live-aboard purposes.
14. Any construction and post construction activity is not to impact on the condition of the
waterway, and is to be conducted so as not to breach the Environmental Protection Act (EPA)
1994 and the Environmental Protection (Water) Policy 1997.
15. The approval or conditions do not constitute a ruling on structural safety and the applicant
must make their own arrangements to ensure adequacy of design and work. Also any
approval granted does not warrant that such plans and specifications have been checked in
detail, nor does it absolve the owner of the land from complying with all the conditions of this
approval and/or relevant Council By-Laws and Policies and/or relevant statutes and/or
statutory regulations in the execution and/or performance of said works. The Council does not
accept any responsibility for the accuracy of such plans and specifications as approved.
16. Certification by a Registered Professional Engineer of Queensland shall be submitted to
Council prior to the return of any bond monies held by Council. The certification shall state that
the jetty has been constructed in accordance with best practice methods, is in accordance with
Coastal Protection and Management Act 1995, is structurally sound and will have no
detrimental affect on the existing revetment walls.
17. A final inspection and approval of the structure by Council’s Inspector is also required prior to
the return of any bond monies held by Council. Please contact Council’s Land Development
Section to arrange the inspection.
18. The jetty shall be licensed with the Council upon completion of the structural work and shall be
licensed annually thereafter.
19. No construction work is to be undertaken until separate approval is granted by the
Environmental Protection Agency (Coastal Management Branch) and any requirements of the
Department of Transport and Department of Primary Industries have been met.
20. The Development Permit for Operational Works lapses if the use has not happened by 30
April 2011, unless an application to extend the currency is approved by Council.
Page 2 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2006.00002159.002 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 247 KB (small file)
- File type
No other editions are linked here.