Council archive · source document
Decision Notice - Change to an Existing Approval - 010.2006.00002159.002 [As Published] · 142006.2159.02
2006/2159 Page 6 of 8 [OCR of page images] 2006/2159 7. Any ship moored or dry berthed at this structure must not exceed the following sizes: Wet Berth Dry Berth Length Overall - 5.0 metres N/A Beam - metres 2.0 metres 8. The contractor must construct the jetty within two years from the date of approval. If construction is not completed, you will need additional or amended comments from the Regional Harbour Master. Maritime Safety Queensland does not need to be further consulted if all of the above conditions are met. The above conditions must be included in your application to the assessment manager. This agency will also forward a copy of this letter to the Assessment Manager. Yours sincerely Jef Captain Peter J Marchbank Acting Regional Harbour Master (Brisbane) Maritime Safety Queensland Page 2 of 2 Page 6 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2006.00002159.002 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 247 KB (small file)
- File type
No other editions are linked here.