 2006/2159




Page 6 of 8


[OCR of page images]
2006/2159

 

7. Any ship moored or dry berthed at this structure must not exceed the following sizes:

Wet Berth Dry Berth
Length Overall - 5.0 metres N/A
Beam - metres 2.0 metres

8. The contractor must construct the jetty within two years from the date of approval. If
construction is not completed, you will need additional or amended comments from the Regional
Harbour Master.

Maritime Safety Queensland does not need to be further consulted if all of the above conditions are
met.

The above conditions must be included in your application to the assessment manager.
This agency will also forward a copy of this letter to the Assessment Manager.
Yours sincerely

Jef

Captain Peter J Marchbank
Acting Regional Harbour Master (Brisbane)

Maritime Safety Queensland Page 2 of 2

Page 6 of 8

Used in these records

About this file

File size
247 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Change to an Existing Approval - 010.2006.00002159.002 [As Published].pdf · 247 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.