8.6. demonstrate that a B99 vehicle will not bottom out or scrape entering/exiting the
driveway;
8.7. any necessary stormwater drainage structures;
8.8. any earthworks within the road reserve;
8.9. implications on existing vegetation.
Response: Please refer to the revised Engineering Plans prepared by Ingeniir. The following changes are
proposed:
● The existing power pole is proposed to be relocated to accommodate the driveway;
● A 2m wide footpath is proposed, which is consistent with the footpath width of 27 Myall Street,
which has been recently approved. Providing a 3m wide footpath results in the footpath being
relocated against the site frontage boundary, and reduces the opportunity for landscaping within
the road reserve;
● Inclusion of a longitudinal section from the centreline of the formation in Myall Street to the site’s
parking and manoeuvring areas;
● A non-standard RSD-102 crossover is proposed to respond to site conditions;
● Stormwater drainage structure and earthworks are also detailed.
In addition to this, swept paths have been prepared by Hayes Traffic Engineering within the Traffic
Engineering Response letter, which confirms a B99 vehicle will not bottom out or scrape entering/exiting
the driveway.
Existing vegetation within the road reserve is noted as being retained or removed on the Landscape OPW
Plans.
Item 9
Assuming that the garage of units U08 and U13 has 2 vehicles parked, demonstrate that cars
parked in each garage can leave the site in a forward gear through a two-point turn
maximum.
Response: Please refer to the attached Traffic Engineering Response prepared by Hayes Traffic
Engineering. Adequate vehicular maneuvering can be achieved for Units 8 and 13.
We thank Council on behalf of the applicant for assessing the attached additional application material.
Based on the information provided in this application we respectfully request that Council proceed to
issue an approval.
Should you have any questions with respect to the above, please do not hesitate to contact the
undersigned.
Yours faithfully,
Adapt Development Management Pty Ltd
Liam Pinese Tiani Boulton
Managing Director Director
E: [email protected] E: [email protected]
M: 0432 497 857 M: 0404 924 160
5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original