Ref: PG-10899, 2023-10-16, ASSMP VER 2
DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Management Plan – Proposed Residence, 30 Mossman Court, Noosa Heads
ACID SULFATE SOIL MANAGEMENT PLAN (ASSMP)
PROPOSED RESIDENCE
30 MOSSMAN COURT, NOOSA HEADS
Objective The objective of the ASSMP is to control any acid generation from
insitu ASS materials and to restrict to an acceptable level any
potential on-site and off-site environmental impacts. A further
objective is to manage earthworks activities and provide measures
to maintain water quality within the site and in adjacent areas.
Proposed It is understood that the proposed development is to comprise the
Development construction of a two storey residence with a basement.
Earthworks are envisaged to consist of cuts of up to 3m for the
basement. A total volume of material to be disturbed is
approximately 900m3. Additional investigation and testing will be
required to confirm the results and recommendations of this
management plan.
Subsurface Mapping
Conditions The site is located in an area that is mapped on the Noosa Council
Acid Sulfate Soils Mapping as Disturbed Land likely to contain ASS.
ASS Investigation
Drilling and sampling encountered a reasonably consistent profile
of sand that:
• did not indicate any obvious ASS presence from a visual and
tactile perspective in the fill or the natural profile.
• indicated that the upper level sands were not acid sulfate soils
and the lower level sands below 3.0m indicated a low level of
acid sulfate soil present.
• had the highest liming rate required to neutralise the acidity of
4kg/m3 (based on laboratory testing of selected samples) for
the lower level sands.
• The proposed excavations for the basement (up to 3.0m
depth)are not expected to disturb the acid sulfate soils but may
just indicate the acid sulfate strata.
Management To mitigate and manage potential adverse environmental impacts
Strategy during site construction operations, the following will be
undertaken:
• an ASS consultant should review the site earthworks schedule
and plan of operations;
• adoption of appropriate erosion control measures to limit
sediment loss due to run-off from site works area;
• where excavation below the water table, or if disturbance of
any silty sands is necessary, a materials handling and
management strategy and procedures for lime treatment of
any disturbed material will be required;
• monitoring and treatment (if necessary) of waters in detention
basins to a level suitable for discharge into external waterways;
and
• site supervision by approved persons and regular reporting to
the Project Engineer/Manager throughout the construction
phase.
Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
003 ECM_22828362_v1_Reference Document - OPW23 0189.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.