Project No. PG-10899 Page | 3
November 2023
Ref: PG-10899, 2023-10-16, ASSMP VER 2
DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Management Plan – Proposed Residence, 30 Mossman Court, Noosa Heads
Performance ASS
Indicators Chromium Suite testing carried out for validation of applied liming
rates will be deemed to be acceptable if the net acidity recorded
is 18 mol H+/t.
Water
Laboratory testing of retained water will be carried out for pH,
electrical conductivity (ED), iron (Fe), aluminium (Al), dissolved
oxygen and turbidity. Levels of these parameters considered
acceptable are as follows:
pH 6.5 to 8.5 pH units
EC <1,500 S/cm
Fe <1,000 ug/L
Al <5.0 ug/L if pH <= 6.5 pH units
<100.0 ug/L if pH > 6.5 pH units
Turbidity <20NTU
Dissolved Oxygen >80% saturated
Testing for the Fe and Al will only be necessary if the pH of the water
falls below pH 6.0.
Frequency/Timing ASS
The sampling and testing of any lime treated material will be
subject to QA testing, which will be repeated until satisfactory
results are obtained. Chromium Suite validation testing will be
carried out at a rate of 1 test/250m3 of treated spoil.
Water
The following monitoring frequency is recommended during
dewatering operations (if required):
• daily measurements of pH, dissolved oxygen (DO), turbidity and
suspended solids; and
• weekly measurements of the full list of Performance Indicators
nominated above (if dewatering has been required).
If the results of monitoring prove consistent, the frequency of
monitoring may be reduced, subject to the approval of the ASS
Consultant.
Corrective Action ASS
If lime treatment of ASS is unsuccessful, whereby performance
targets are not being met as indicated by the QA and water quality
testing procedures:
• The earthworks schedule will be reassessed and action taken to
determine the problems causing the breach of standards.
• If the problems are related to ineffective implementation of the
ASSMP, then the plan will be audited to ensure improved
implementation. Monitoring and testing will be increased to
ensure compliance with the established standards.
• Any significant changes to the ASSMP will be subject to
discussions with and the approval of, the relevant regulatory
authorities.
Water
Compliance failures regarding specified performance criteria shall
be recorded including the date, time, nature of failure and actions
taken to rectify the situation. Monitoring results should be reviewed
Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
003 ECM_22828362_v1_Reference Document - OPW23 0189.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.