Skip to the record
The gold standard in government transparency.

Council archive · source document

003 ECM_22828362_v1_Reference Document - OPW23 0189 · OPW26/0094

of 75

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                                                    ADG Consulting Pty Ltd


                              The Act requires that appropriate action be taken to report that environmental harm is occurring or has
                              the potential to occur, unless the harm is authorised under an environmental protection policy, an
                              environmental management program, a development approval, or an environmental protection order.
                              This is known as the “Duty to Notify”. Failure to fulfil this duty is an offence and may result in prosecution.
                      1.4     DMP objectives
                              The objectives of the DMP are to:
                                  Describe the dewatering methodology, groundwater treatment, monitoring and reporting
                                   procedures to be employed at the site during dewatering activities.
                                  Provide effective management procedures to prevent environmental harm resulting from the
                                   discharge of extracted groundwater from the site.
                      1.5     Scope of work
                              To achieve the investigation objectives, the following scope of work was undertaken:
                                  A desktop study including:
                                   1. Review of the development proposal and proposed shoring/dewatering designs (where
                                      available).
                                   2. Review of geology and soil maps for the area.
                                   3. Search of groundwater bores licensed by the Department of Regional Development,
                                      Manufacturing and Water (DRDMW) within a 200 m radius of the site.
                                   4. Review of relevant existing reports and groundwater data from the local area.
                                   5. Review of current aerial photographs of the site and surrounds.




                        ADG1580.23 Dewatering Management Plan_Rev0_28.09.23                                                            Page 2




Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024

Used in these records

About this file

File size
5.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

003 ECM_22828362_v1_Reference Document - OPW23 0189.pdf · 5.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.