003 ECM_22828362_v1_Reference Document - OPW23 0189 · OPW26/0094
ADG Consulting Pty Ltd
waterways, are appropriately sealed. The nominated hold points regarding dewatering for this project
are:
1. Prior to commencement of dewatering/initial pump out
2. At finished excavation level, prior to blinding layer application
3. External to basement service installation trench opening/s prior to backfilling.
The above nominated hold points are subject to confirmation by the consulting engineer, and liaison with
council representatives and the Site Manager.
ADG1580.23 Dewatering Management Plan_Rev0_28.09.23 Page 11
Document Set ID: 22828362
Version: 1, Version Date: 26/02/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
003 ECM_22828362_v1_Reference Document - OPW23 0189.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.