Council archive · source document
Planning Report · MCU22/0058
4.4 Works and Overlay Codes
RECOR provides engineering plans and a stormwater design. A landscaping plan is also provided
as part of the proposal plans which includes landscaped area and some planting detail for screening
vegetation along the side boundaries and front setbacks. Further subsequent detail to be provided
as part of OPW.
It is noted that The Noosa Plan does not require manoeuvring of vehicles in a forward gear onto
local roads.
5.0 State assessment and other matters
5.1 State interests
5.1.1 Matters established in the Planning Regulation
Nil
5.1.2 State Planning Policy
The SPP includes assessment benchmarks that may be applicable where a local government
planning scheme does not adequately reflect the SPP. The Noosa Plan 2020 appropriately
integrates all SPP provisions, except for Natural Hazards, risk and resilience – coastal hazards – in
part. The application does not trigger assessment against for coastal hazards.
Page 11 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Planning Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.