SUPERSEDED - Approved Decision Notice - MCU25 0079 [As Published]
Performance Bond Agreement
6. An applicant for a development application may make an agreement with an assessment
manager, referral agency or other person to establish the responsibilities, or secure the
performance, of a party to the agreement about a development condition.
Qualified Person
7. For the purpose of preparing a Landscape Plan, a qualified person is considered to be a
landscape architect, landscape designer and/or horticulturist with a minimum of 3 years
current experience in the field of landscape design.
For the purpose of preparing an Arborist Report, a qualified person is considered to be a
person with either:
a. ISA certification; or
b. Diploma of Arboriculture in addition to a minimum of 3 years current experience in the
field of arboriculture.
Qualified Person
8. For the purpose of preparing a Landscape Plan, a qualified person is considered to be a
landscape architect, landscape designer and/or horticulturist with a minimum of 3 years
current experience in the field of landscape design.
Submission of Amended Plans Required
9. The conditions of this Decision Notice require resubmission of plans to Council with
amendments. Please address the amended plan/s to Council’s Development Assessment
Branch with the Reference No. MCU25/0079.
Building and Construction Industry (Portable Long Service Leave) Levy
10. The QLeave levy must be paid prior to the issue of a development permit where it is required.
Council will not be able to issue a Decision Notice without receipt of details that the Levy has
been paid.
Co-ordination of Operational Works Assessment
11. Additional application fees apply to Operational Work applications where the different
aspects of the works are lodged separately. Significant savings in application fees will result
if all works are lodged in a single application.
Preparation of a Preliminary Construction Management Plan
12. A preliminary Construction Management Plan must be submitted with the Operational Works
application and must address the following:
a. Traffic management during all phases of construction
b. Adequate parking arrangements for works and deliveries;
c. appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
Devices (MUTCD)
d. provision for safe vehicle and pedestrian access across the frontage of the site both
during daily construction and after daily construction has ceased.
Biosecurity Act 2014 – Fire Ant Control
Developers must remain vigilant for the presence of fire ants. Under the Biosecurity Act 2014,
individuals and businesses are responsible for ensuring that they follow the movement controls for
specific organic materials to help prevent the spread of fire ants within South East Queensland’s
fire ant biosecurity zones. Movement of a fire ant carrier from within a fire ant biosecurity zone may
need a biosecurity instrument permit. More information is available on
https://www.fireants.org.au/treat/business-andindustry/movement-controls
Page 8 of 16
Document Set ID: 24381517
Version: 4, Version Date: 17/12/2025