Original source · versioned page text
2022-12-12 General Committee Meeting Agenda
The original of this document is very large (11.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 12 DECEMBER 2022
Page 18 of 69
GENERAL COMMITTEE MEETING AGENDA 12 DECEMBER 2022
Noise Nuisance
16. Noise emission from mechanical equipment shall comply with the following
requirements:
a. _ Air-conditioning, Compressor and Refrigeration Equipment
° Zam to 10pm: Maximum background + 5dB(A)
° 10pm to 7am: Maximum background + 3dB(A)
° The background noise level is that measured in the absence of the
problemnoise.
b. Other Mechanical Equipment
° 7am to 7pm: Maximum background + 5dB(A)
° 7pm to 10pm: Maximum background + 3dB(A)
° 10pm to 7am: No audible noise.
° The background noise level is that measured in the absence of the
problemnoise.
Nature and Extent of Approved Use (continued)
17. The harvesting vehicle is required to be enclosed or fully covered such that
carcassesare not visible during transportation.
18. To minimise the potential impacts of the operator’s vehicle and refrigerated
trailerreturning to and departing from the site, the operator must:
a. Dim vehicle lights at night time when departing and returning to the site (if
safe andpractical to do so).
b. Keep mechanical equipment associated with the refrigeration and cooling
of thetrailer turned off until the vehicle has left the subject site.
Landscaping Works
19. The access handle must be densely landscaped with native plants and shrubs to
provide a dense screen of vegetation between the driveway and neighbouring
residents.
20. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed to
grow to full form and be refurbished when its life expectancy is reached.
Permit
21. This permit lapses on 17 December 2022 unless written consent is provided by
Council to extend the approval. In assessing an extension, Council will have regard
to any complaints received from nearby residents concerning breaches of the
development approval conditions, and any other relevant matters.
5. REFERRAL AGENCIES
Not Applicable
6. ADVISORY NOTES
PLANNING
Nature and Extent of Approved Development
1. | The assessment of this development was based on a proposal having a gross floor area
of 52m?, as depicted on the Approved Plans.
Document Set ID: 21735284 Page 3 of 6
Version: 5, Version Date: 17/12/2021
Page 18 of 69See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.