NOOSA COUNCIL IDAS Development Application Decision Notice                                                    3 of 10




                                      Noosa Council Conditions
                                      INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


1.    Development undertaken in accordance with this approval must generally comply with the approved plans
      of development. The approved plan are numbered 07/30-1 and 07/30-2 prepared by John Norden &
      Associates and dated February 2007 and as may be amended by these conditions.

2.    Structures should be designed and constructed such that they are free standing within the waterway and
      are not connected to or behind the revetment wall or rock wall.

3.    A rigid handrail shall be fitted on one side of the walkway.

4.    No boatlifting devices are to be attached or moored at the jetty structure for the purpose of elevating a vessel
      above the water without Council approval.

5.    The jetty shall be constructed in a manner to render the underside area vermin proof.

6.    There shall be no electrical reticulation system carrying electricity in excess of 24 volts beyond the
      revetment wall.

7.    Lighting associated with the use shall be designed, installed, operated, and maintained in accordance
      with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.

8.    The jetty is to be used for private purposes only with no commercial operations are to be undertaken.

9.    Boat repair activities will not be permitted on site.

10.   Wastewater and sullage shall only be disposed of at approved pumpout facilities.

11.   The mooring facility shall not be utilised for live-aboard purposes.

12.   Any construction and post construction activity is not to impact on the condition of the waterway, and is to
      be conducted so as not to breach the Environmental Protection Act (EPA) 1994 and the Environmental
      Protection (Water) Policy 1997.

13.   The approval or conditions do not constitute a ruling on structural safety and the applicant must make
      their own arrangements to ensure adequacy of design and work. Also any approval granted does not
      warrant that such plans and specifications have been checked in detail, nor does it absolve the owner of
      the land from complying with all the conditions of this approval and/or relevant Council By-Laws and
      Policies and/or relevant statutes and/or statutory regulations in the execution and/or performance of said
      works. The Council does not accept any responsibility for the accuracy of such plans and specifications
      as approved.

14.   The construction of the jetty piles shall be supervised by a Registered Professional Engineer of
      Queensland to ensure that no adverse impacts or additional loads are placed upon the existing seawall.

15.   Certification by a Registered Professional Engineer of Queensland shall be submitted to Council prior to
      the return of any bond monies held by Council. The certification shall state that the jetty has been
      constructed in accordance with best practice methods, is in accordance with Coastal Protection and
      Management Act 1995, is structurally sound and will not have any adverse impacts on or place additional
      loads upon the existing seawall.

16.   A final inspection and approval of the structure by Council’s Inspector is required prior to the return of any
      bond monies held by Council. Please contact Council’s Land Use Section to arrange the inspection.

17.   The jetty shall be licensed with the Council upon completion of the structural work and shall be licensed
      annually thereafter.

18.   The Development Permit for a material change of use of premises lapses if the use has not happened by
      15 August 2009, unless an application to extend the currency is approved by Council.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@10069b22\@[email protected]

Used in these records

About this file

File size
192 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015E6DE.001.pdf · 192 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.