180305 Raftsea Issue V-MCU
Attached to the e-mail Change to DA & Op Works - MCU16/0112.01 & OPW16/0209.01.
39,000
150 38,650 200
150 22,350 15,750 550 200
C
B
1 2 3 07 4 5 07 6 7
BT136 Emergency Lighting
D12 D13
A A Stainlite BT118 NPR single 18w non-maintained or
EXIT
150
150
150
150
150
150
2,950 MIN alternative brand to suite classification AS/NZS
drain 2293.1. Mounted at 6m max. above finished floor
COLD ROOM SF10 Stanlite SF10 non-maintained (10w halogen fixed
5600H flush with ceiling) to AS/NZS 2293.1.
6,300
D22
7,283
rm fo e
fe e d
re pip g tra
drain
en r
drain
t.
EXIT Exit Sign to comply with BCA 2013 Clause E4.5.
fu aste E u/
w DP
(Running Man) All exit doors to comply with BCA 2013 Clause
H
tu
D2.19, D2.10 & D2.21.
STAGE 2.
FUTURE COLD ROOM fw Floor waste. Exact locations to be determined.
INSULATED PANEL WALLS BY
OWNER.
MV Mechanically ventilated to AS.1668.2 1991, min 25
17,780
L/S exhaust flow rate. Ceiling 2700mm high.
drain
21,950
FE Extinguisher type 3A:40B:(E)
22,150
D23
7,284
drain
Ensure fire extinguishers are within 4m of 'EXIT'
doors. Extinguisher location sign above in
BOTTLING drain accordance with AS 2444
235
150 4,000 3,230 70 1,240 70 2,865 190
70
150 3,230 70 1,240 165 2,935 190 Stainless steel sink with instantaneous HWS in
vermin proof cabinet under sink (Typ).
29,950
msb
A
07
Main switch board
EXIT
D24
7,233
D11
715
70
70
WASHDOWN
drain
sink
ref REEL
70
OVERHEAD
2,335
LUNCH
2,265
3,950
3,950
M 200
D35
42,000
D06
41,650
70
D05
EXIT UP
F EXIT structural rafter EXIT
B B
D10 col D15 D14
70
200
200
200
200
eyewash
&shower
3,470
C F C
D07
1,940
UP
2,040
F/M
D36
concrete block retaining wall
FE
STAGE 2.
70
D08
M
5,350
FUTURE COLD ROOM
D25
70
70
1,950
STAFF OUTDOOR INSULATED PANEL WALLS BY OWNER.
AREA ENGINEER TO ALLOW FOR
DW
POST/BEAM SUPPORT TO STAGE 1
7,620
drain drain
70
500x500 MEZZANINE.
cut outs COLD
ROOM
5,280
6,025
KITCHEN col col col
D09
100
150 Ø service sk
3,700
fw conduit for (trade waste)
drain
RAINWATER TANK
13kl
beer supply
lines
SOUTH
3,425
04
D col col col col D
structural rafter
70
815
D34
EXIT
D21
100
200 750 4,050 col STAGE 2. drain
70
line of fw
FUTURE COLD
1,805 100
D20
roof over ROOM
19,850
1,200
1,245
bar frame
INSULATED PANEL
BAR WALLS BY OWNER.
beam
4,779
sp col col
7,010
D26
100
W01
over
D19
glass
drain
drain
drain
NP
SR
chiller
7,315
190
2,550
block
4,105
4,105
COVERED
10,980
100
TERRACE
10,165
D18
beam
1,100
water
9,500
u/g gas line
treatment
sp FE
line of floor over structural rafter from tank
E over D col col plant
E
100
07
5,387
D17
100
V terrace addition 06.03.18
W02
line of TASTING
D02
U entry ramp/stairs, carpark 01.09.17
4,105
4,220
4,105
roof over T Req. doors changed 02.08.17
4,920
drain drain drain S Issue for Tender 16.05.17
D27
See detail 02
4,185
EXIT Issue Amendment Date
beam dwg 09
main
150
150
150
150
sp
over D01 1,673
F switchboard F
200
200
200
90
150
1500 1500
1,000
880 600 1,080
1,245
1,200
1,200
1:14 TGSI
1,500
G G
W13 W14
200
200
200
elect. pad 3,393
1,560
1,160
mount
300
See detail 03 dwg 09 PFC to PFC to
edge edge
4,700
line of awning over
3,660
5
150 1,200 5,600 690 690 5,600 1,220 2,030 150 2,030 150 615
3,83
150 3,230 70 1,240 70 3,100 190 15,000 100 5,825 100 3,725 200
4,841
1:14
150 22,900 100 4,825 100 4,725 200
handrail handrail
33,000
(07) 5456 4411 0412 264 685 QBCC Lic.065570
1,500
bicycles bicycles
5,160
2,246 CLIENT:
(2) class 3 (2) class 3 RAFTSEA P/L
spaces spaces 3,870
TGSI PROJECT and LOCATION:
1,018
TGSI Proposed Industrial Development
924
at No.42 Rene Street, Noosaville.
C B
1 2 3 07 4 EAST
04 5 07 6 7
DRAWN BY: JS CHECKED BY: CS
300
1,200 3,395 2,100 3,940 2,100
SCALE 1:100 at A1 PAPER
4,000 8,030 15,020 4,975 4,975 2,000
DRAWING TITLE: Ground floor plan
GROUND FLOOR PLAN Drawing: PROJECT No: ISSUE
1 :1 0 0 03 of 11 15.253 V
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original