Council archive · source document
Response to outstanding issues - ADG1786.25 Dewatering Management Plan_Rev1_07.10.25-compressed · MCU25/0020
Plans and drawings: the text below has words only, no drawings.
ADG Consulting Pty Ltd 43 environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm”. Proposed water quality objectives The proposed water quality objectives that have been developed for the discharge of extracted groundwater from the site are provided in the Tables below. All water discharged from the site must comply with the discharge criteria provided in Table 2. In addition, the receiving water quality within a 20 m radius of the discharge point entry to the receiving water shall comply with the receiving water criteria provided in Table 3. Receiving waters data will be assessed against background monitoring data if non-compliant results are obtained at the receiving waters monitoring location. Table 2 Discharge criteria Parameter Criteria Physico-chemical pH (pH units) 6.5-8.5! Dissolved oxygen (% saturation) 2802 Suspended solids (mg/L) <501? Turbidity (NTU) <502 Litter None visible Totals metals (ug/L) Aluminium No ANZG criteria / 200? Iron No ANZG criteria / 3002 Table notes: 1. QWAQG 2009 (2013) Refer to Table 8.2.1. Summary of design objectives for management of stormwater quality and flow — construction phase of development in Queensland. 2. Typical discharge criteria recognised throughout Queensland & NSW. 3.Criteria subject to anticipated Development Application (DA) notice and conditions by Noosa Shire Council. Table 3 Receiving waters criteria Parameter Criteria Physico-chemical pH (pH units) 7.8 - 8.31 Dissolved oxygen (% saturation) 85-105! Suspended solids (mg/L) <14t Turbidity (NTU) <6t Dissolved metals (ug/L) Aluminium 37 Arsenic No relevant ANZG criteria available Cadmium 5.5? Chromium 4.47 Copper 1.32 Iron No relevant ANZG criteria available Lead 4.42 Nickel 702 Zinc 8 Mercury 0.42 Totals metals (ug/L) ADG1786.25 Dewatering Management Plan_Rev1_07.10.25 Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to outstanding issues - ADG1786.25 Dewatering Management Plan_Rev1_07.10.25-compressed.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.