Skip to the record
The gold standard in government transparency.

Council archive · source document

Response to outstanding issues - ADG1786.25 Dewatering Management Plan_Rev1_07.10.25-compressed · MCU25/0020

of 54

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 

 

 

   

8m HEIGHT LIMIT

  
  

UPPER FLOOR PP 9100 _UPPER FLOOR PP 9100
UPPER FLOOR CEILING 8800

— — —— 2
UPPER FLOOR CEILING 8800 3

 
 

__ UPPER FLOOR 6100

    
 
   

J oo at
UPPERFLOOR 6100 __ { »_RL 6100)

GROUND FLOOR CEILING 5400

GROUND FLOOR CEILING 5400.

 
 

2700

      

EVEL

| |
|
}1M ABOVE NATURAL GROUND LI

   

PREVIOUS BUILDINGS RL 2900

    
 
 

27

  
   
  

‘TURAL GROUND.

CAR LIFT VOID
6.2W X 8.6H
6200

       

BASEMENT CARLIFT

     
 
  
   

RL -1000

 

RL -1000

 

sca

 

BASEMENT 2 CEILING

  

  

BASEMENT 2 -4600
It i

 
 

BASEMENT CARLIFT

   
  

RL -4600

 

RL -4600

   

SECTION 1

SCALE: 1: 100

  

RL -5870

 

CLIENT NAME: Sunshine Beach Noosa Developments Pty Ltd. PROJECT NAME:River Oasis

www.chriscloutdesign.com.au GENERAL NOTES:
A: OFFICE 1/20 DUKE STREET Use written dimensions only. DO NOT scale drawings. Contractors to verify all SITE ADDRESS: 11 RAVENWOOD DRIVE, NOOSA HEADS QLD 4567

 

 

—
SUNSHINE BEACH, QLD 4567 ~J dimensions on site prior to commencing works. Site location in accordance with DRAWING TITLE:
_CHRISC LOUTUIESICN ro enginaors details, These Urawinge ret be readin conjunction wiht engineers design SECTION
E: [email protected] \ and details, the accompanying building specification and schedule of finishes. If in doubt, DRAWING DATE03/10/25 SCALE: 1: 100 @A3 DRAWN BY:C.CLOUT
P: (07) 54748 107 BSALICENCE: 1127508 A please request clarification. DO NOT ASSUME.
issue: DA ISSUE C

C3.0

 

 

Used in these records

About this file

File size
5.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to outstanding issues - ADG1786.25 Dewatering Management Plan_Rev1_07.10.25-compressed.pdf · 5.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.